Penetration <strong>Fire</strong> Tests<br />

<strong>Fire</strong> Tests UL System Test Criteria Description<br />

Floor/Wall Assembly C-AJ-1020a 2<br />

4<br />

3<br />

5<br />

2<br />

Floor/Wall Assembly C-AJ-5146 a<br />

4B<br />

4<br />

5<br />

3<br />

4B<br />

3<br />

2<br />

A<br />

A<br />

A<br />

Section A–A<br />

3<br />

1<br />

Section A–A<br />

A<br />

2<br />

4A<br />

Caulk-Type Materials<br />

1<br />

20 <strong>USG</strong> <strong>Fire</strong> <strong>Stop</strong> <strong>Systems</strong><br />

F-Rating<br />

3 Hr.<br />

T-Rating<br />

1 Hr.<br />

F-Rating<br />

2 Hr.<br />

T-Rating<br />

1/2 & 1 Hr.<br />

1. Concrete floor or wall assembly, minimum 4-1/2� thickness<br />

floor/minimum 6-1/2� wall.<br />

2. Steel sleeve (optional).<br />

3. Metallic pipe:<br />

A Steel pipe:<br />

6� diameter (or smaller) Schedule 10 (or heavier) steel pipe.<br />

B Conduit:<br />

4� diameter (or smaller) electrical metallic tubing (EMT) or 6� diameter<br />

rigid steel conduit.<br />

4. Forming material:<br />

Mineral wool insulation b (minimum 4.0 pcf) firmly packed into the<br />

opening as a permanent form; see table below for minimum required<br />

thickness.<br />

5. Type AS or Type SS:<br />

Minimum thickness of sealant as specified in the table below, applied<br />

within the opening, flush with the top surface of the floor or both<br />

surfaces of the wall.<br />

Maximum Maximum Annular Forming Minimum F T<br />

Pipe EMT Space Material Sealant Rating Rating<br />

Diameter (in.) Thickness Thickness (hours) (hours)<br />

(%) (in.) (in.)<br />

1-1/2 — 3/8 to<br />

2-1/8<br />

2-1/2 2 3 1<br />

6 4 3/8 to<br />

3/4<br />

3-1/2 1 3 0<br />

6 4 3/8 to 1 2-1/2 2 3 0<br />

1. Concrete floor or wall assembly, minimum 4-1/2� thickness.<br />

2. Metallic pipe:<br />

A Steel pipe:<br />

8� diameter (or smaller) Schedule 40 (or heavier) steel.<br />

B Iron pipe:<br />

8� diameter (or smaller) cast or ductile iron.<br />

C Copper pipe:<br />

4� diameter (or smaller) regular (or heavier) copper.<br />

D Copper tubing:<br />

4� diameter (or smaller) Type L (or heavier) copper tubing.<br />

3. Pipe covering:<br />

Nominal 1� thick (or less) glass fiber insulation.<br />

4. <strong>Fire</strong>stop treatment:<br />

Pipe Type Annular Space (in.) T Rating (Hours)<br />

Steel Pipe 1/2 to 1 1<br />

Iron Pipe 1/2 to 1 1<br />

Copper Pipe 3/8 to 1-1/2 1/2<br />

Copper Tubing 3/8 to 1-1/2 1/2<br />

4A Forming material:<br />

Minimum 4� thick mineral wool insulation (minimum 4.0 pcf) firmly<br />

packed into the opening as a permanent form.<br />

4B Type A:<br />

Minimum 1/2� thick sealant applied within opening, flush with the top<br />

of the floor or both sides of the wall.<br />

Note<br />

(a) Refer to the UL <strong>Fire</strong> Resistance Directory for Through-Penetration <strong>Fire</strong>stop <strong>Systems</strong><br />

or contact United States Gypsum Company for complete information. (b) Bearing the UL<br />

Classification Marking.