i STEAM COAL - Clpdigital.org
i STEAM COAL - Clpdigital.org
i STEAM COAL - Clpdigital.org
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
34 THE <strong>COAL</strong> TRADE BULLETIN.<br />
and failing to adjust, then the matter shall be throughs in rooms after the first cut of machine<br />
referred to miners' officials and operators. is loaded out.<br />
11. All machine loaders shall be accorded two 22. In break-throughs between rooms all over<br />
rooms for each two men, and the operators pledge IS feet shall be paid entry price.<br />
themselves to provide two rooms for two men at 23. For break-throughs between rooms the<br />
the earliest possible moment, but in the event of loader shall not be given narrow checks, but the<br />
territory becoming scarce, through a squeeze or narrow coal shall be estimated by mine boss and<br />
striking a horseback, or any other unavoidable miner.<br />
obstacle, this shall not be construed so as to di- DAY LABOR—INSIDE.<br />
minish the output of the mine. Tracklayers, per day $2.42<br />
12. Where a miner is required in any entry to Tracklayers' helpers, per day 2.23<br />
make height above top of rail 5 feet, 30 cents per Drivers, per day 2.42<br />
yard shall be paid for shooting and loading bone Rope riders, per day 2.42<br />
coal, 15 cents per yard shall be paid for shooting Trappers, per day 1.065<br />
and loading black band when same exists, and 30 Bottom cagers, per day 2.42<br />
cents per yard shall be paid for shooting and load- Water haulers and machine haulers, per day 2.42<br />
ing rock. Where black band does not existT 45 Timbermen, per day 2.42<br />
cents per yard shall be paid for shooting and load- Pipe men for compressed air plants, per day 2.36<br />
ing rock. When this yardage is paid the price for Wiremen, per day 2.42<br />
loading coal shall not include bone coal price. Motormen, per day 2.42<br />
13. All work 18 feet and under shall be entry All other inside day labor, per day 2.23<br />
price. Where rooms have to be cut under 24 feet DAY LAROR—OUTSIDE.<br />
wide and over 18 feet, the same shall be paid for Tne I0nowjng shall be the minimum base for<br />
at 3 cents per ton extra to loader Machinery run- outside labor:<br />
ners to receive entry price. Not to effect pillars Blacksmith, per day $2.42<br />
or entries. Slabs to be left to men and mine boss. Blacksmith helper, per day 1.86<br />
14. The company shall be permitted to put two Trimmers, per day 2.125<br />
men in entries to cut and load coal and move their Carpenters, per day 2.125<br />
own machines where necessary or isolated. MACHINE.<br />
15. When a loader has once placed bone coal Cutting with chain machines, wide work...$ .15<br />
posts in his room it shall be the duty of the ma- Cutting with chain machines, narrow work. .18<br />
chine runners to properly replace any bone coal Loading, shooting and drilling in rooms 48<br />
posts removed by them. Loading, shooting and drilling in narrow<br />
16. Day men are to do whatever work about work 5914<br />
mine the management may require, so long as they Room turning, cutter and loader Entry price<br />
are paid scale price for the work. Break-throughs between rooms, loader, per<br />
17. Where a miner absents himself from duty ton 55 7-10<br />
for two days or more, except on account of sick- Break-throughs between rooms where bone<br />
ness, without giving advance notice to the mine coal is taken down, loader, per ton.... 59 7-10<br />
boss or mine superintendent when possible, he for- Break-throughs between entries Entry price<br />
feits his position. Shooting and taking care of bone coal over<br />
Where a machine runner or any employe upon roadways, per ton 04<br />
whose work other employes of the mine are de- Double shift entries and breakthroughs bependent<br />
absents himself from duty without giving tween entries, per yard 27%<br />
advance notice when possible to the mine boss, he All labor above enumerated, now receiving more<br />
forfeits his position. than the prices above stated per day, shall be re-<br />
18. The company has the right to report daily duced ( Vj) one-half the advance made April 1,<br />
tonnage in even tons and carry odd hundred 1903.<br />
weights forward to weigh sheet for following day. All outside labor, not enumerated in the above<br />
the odd hundred weights to be paid for when man scale, shall be reduced (Vo) one-half the advance<br />
leaves the employ of the company. paid April 1, 1903.<br />
19. Operators shall be permitted to require reg- Engineers' and firemen's wages to be reduced<br />
ular machine runners to cut on idle days in case of ( u2) one-half the advance of April 1, 1903, with<br />
break down, unavoidable accidents, or four places present conditions.<br />
being out of cutting in any one territory. All present outside day labor not satisfied with<br />
20. Machine loaders shall not be charged for the wages to be paid according to this scale shall<br />
blacksmithing. be given an average place in the mines.<br />
21. A turn-rail shall be laid in all break- In behalf of miners: R. F. Wallace, A. L. Pen-