© VERBUND AG, www.verbund.com
© VERBUND AG, www.verbund.com
© VERBUND AG, www.verbund.com
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Does a current Market Model for PSHPP exist?<br />
• Limited economical displayability<br />
peak – off peak price (grid feeding tarifs)<br />
• No full cost reflectance<br />
• Rising investment costs<br />
• Network-usage-fees<br />
• Missing market model for<br />
system services<br />
• Missing grid extention<br />
(Infrastructure subsidies alternate storage<br />
technologies except PSHPP)<br />
<strong>©</strong> <strong>VERBUND</strong> <strong>AG</strong>, <strong>www</strong>.<strong>verbund</strong>.<strong>com</strong><br />
Usage fees for<br />
pumping energy,<br />
Usage fees for<br />
grid feed<br />
No usage fees<br />
for pumping<br />
energy<br />
Good conditions<br />
Bad conditions<br />
Not examined<br />
<strong>VERBUND</strong> Hydro Power <strong>AG</strong>/ESK/Dr. Otto Pirker<br />
No usage fees for<br />
new PSHPP<br />
usage fees for<br />
pumping energy,<br />
Usage fees for grid<br />
feed<br />
No usage fees<br />
for pumping<br />
energy<br />
23.01.2012 Seite 48