Pump Storage Projects in Switzerland<br />

Linthal 2015 under construction 1.000 MW<br />

Nante Drance under construction 900 MW<br />

Veytaux/Leman under construction 240 MW<br />

Bernina (Lago Bianco) planed 1.000 MW<br />

Grimsel 3 planed 600 MW<br />

Verzasca planed 300 MW<br />

Total 4.040 MW<br />