© VERBUND AG, www.verbund.com
© VERBUND AG, www.verbund.com © VERBUND AG, www.verbund.com
The new world of demand and supply decoupling © VERBUND AG, www.verbund.com 18
21. Sept. 2011, PM Page 19 © VERBUND AG, www.verbund.com schematically performance chart Power Resource Management
- Page 1 and 2: © VERBUND AG, www.verbund.com
- Page 3 and 4: Agenda How will our electricity sys
- Page 5 and 6: Storage or Flexibility European ene
- Page 7 and 8: Share of renweable energy of electr
- Page 9 and 10: Planned installation of windpower u
- Page 11 and 12: Electricity generation by wind and
- Page 13 and 14: Storage or Flexibiliy We need „se
- Page 15 and 16: Operation of Hydro Pump Storage Pow
- Page 17: Operation of HPP in a Hydropower do
- Page 21 and 22: Drivers and background for the cons
- Page 23 and 24: Flexible Hydro Generation not only
- Page 25 and 26: Total Amount of Electricity (logari
- Page 27 and 28: Pump Storage Projects - Today © VE
- Page 29 and 30: Projekte - Kopswerk II Druckschacht
- Page 31 and 32: Limberg II (in operation since: 6.1
- Page 33 and 34: © VERBUND AG, www.verbund.com VHP/
- Page 35 and 36: Quelle: VERBUND © VERBUND AG, www.
- Page 37 and 38: Energy Storage „Riedl“ © VERBU
- Page 39 and 40: Projekt Obervermuntwerk II Quelle:
- Page 41 and 42: © VERBUND AG, www.verbund.com VERB
- Page 43 and 44: 3 Pumped hydro storages are the mos
- Page 45 and 46: Cost of Electricity Generation / VG
- Page 47 and 48: Longterm investments need stable fr
- Page 49 and 50: Development of base load and peak l
- Page 51: Otto.pirker@verbund.com © VERBUND
The new world of demand and supply decoupling<br />
<strong>©</strong> <strong>VERBUND</strong> <strong>AG</strong>, <strong>www</strong>.<strong>verbund</strong>.<strong>com</strong> 18