(Yield) Maps - StellarSupport - John Deere
(Yield) Maps - StellarSupport - John Deere (Yield) Maps - StellarSupport - John Deere
JDOffice 1.2 Task Wizard The Task Wizard consists of a series of screens and is intended for the beginner users of JDOffice as it guides the user through the necessary steps to complete a task. Once the task is defined, the builder is used to select the operations that will be included in that task. Using the Task Wizard: 1. Select a task from the list. 2. Click the Task Wizard button. 3. Select an Operator from the drop-down menu or select to add a new operator. 4. Select a Machine Type from the drop-down menu. 5. Select a Machine from the drop-down menu. • If was chosen for the Machine Type, this box will not be active. 6. Select an Implement Type from the drop-down menu. 7. Select an Implement from the drop-down menu. • If was chosen for the Implement Type, this box will not be active. 8. Click Next The first operation will be created on Page 2 of the Wizard. 9. In Operation, select the first operation. 72
73 Setup • The selected operation will determine what drop-down boxes are active for that operation. 10. Continue to select information for the active text boxes for Operation 1. • Values need to be typed in for the Rate and Depth/Height entries. • If you selected Tank Mix as an operation, the rate in the Task Wizard is the application rate of the entire mix; this rate may differ from the solution rate on the Tank Mix tab, as that is the base rate of the entire solution. Overrides of the application rate can be made in the field. 11. Click Next to add another operation. Repeat steps 9-10. 12. Click Done when you are finished. 13. The program will jump to Page 8 of the Task Wizard (which is identical to the Task Builder screen.) Verify that the information is correct on this screen. • If changes are necessary, click in the box to be changed and click on the dropdown arrow that appears to the right of the box. Pick a new selection, or click Back until you reach the screen for the operation that needs to be edited. Make the corrections and click Done. 14. Click Finish. Tillage Setup
- Page 30 and 31: JDOffice 1.2 Support from John Deer
- Page 32 and 33: JDOffice 1.2 JDOffice Directory Str
- Page 34 and 35: JDOffice 1.2 Minimize, Maximize, Re
- Page 36 and 37: JDOffice 1.2 28
- Page 38 and 39: JDOffice 1.2 General Preferences PC
- Page 40 and 41: JDOffice 1.2 Dates Preferences Seas
- Page 42 and 43: JDOffice 1.2 The default legend det
- Page 44 and 45: JDOffice 1.2 on the top layer of th
- Page 46 and 47: JDOffice 1.2 Processing Preferences
- Page 48 and 49: JDOffice 1.2 Boundary Preferences C
- Page 50 and 51: JDOffice 1.2 Export Preferences Yie
- Page 52 and 53: JDOffice 1.2 Info Drawn Beyond the
- Page 54 and 55: JDOffice 1.2 The system will rememb
- Page 56 and 57: JDOffice 1.2 Farms/Fields The Farms
- Page 58 and 59: JDOffice 1.2 • The first 20 chara
- Page 60 and 61: JDOffice 1.2 is an area of land whi
- Page 62 and 63: JDOffice 1.2 2. Select the Crop tab
- Page 64 and 65: JDOffice 1.2 5. Place the mouse cur
- Page 66 and 67: JDOffice 1.2 Add a fertilizer: 1. F
- Page 68 and 69: JDOffice 1.2 Product Application. I
- Page 70 and 71: JDOffice 1.2 6. In Carrier, select
- Page 72 and 73: JDOffice 1.2 4. In Carrier name, en
- Page 74 and 75: JDOffice 1.2 box; if you want a dif
- Page 76 and 77: JDOffice 1.2 the Define Types tab (
- Page 78 and 79: JDOffice 1.2 Irrigation, Harvest, a
- Page 82 and 83: JDOffice 1.2 JDOffice provides ten
- Page 84 and 85: JDOffice 1.2 2. Select the Other ta
- Page 86 and 87: JDOffice 1.2 new display name. •
- Page 88 and 89: JDOffice 1.2 Contracts When an agre
- Page 90 and 91: JDOffice 1.2 3. Click New. 4. In Co
- Page 92 and 93: JDOffice 1.2 Flags/Legends Flag Set
- Page 94 and 95: JDOffice 1.2 The boxes start and en
- Page 96 and 97: JDOffice 1.2 To create a two color
- Page 98 and 99: JDOffice 1.2 • Soil Type Map: Aut
- Page 100 and 101: JDOffice 1.2 automatically adjust t
- Page 102 and 103: JDOffice 1.2 Clients When you first
- Page 104 and 105: JDOffice 1.2 Saving the Setup Data
- Page 106 and 107: JDOffice 1.2 will be color-coded by
- Page 108 and 109: JDOffice 1.2 Farm Map Commands Thes
- Page 110 and 111: JDOffice 1.2 TIGER ® Data TIGER (T
- Page 112 and 113: JDOffice 1.2 3. Click Open. When th
- Page 114 and 115: JDOffice 1.2 106
- Page 116 and 117: JDOffice 1.2 3. Select Unload PC Ca
- Page 118 and 119: JDOffice 1.2 Manually Unload the PC
- Page 120 and 121: JDOffice 1.2 (refer to “Client Se
- Page 122 and 123: JDOffice 1.2 The Edit Data Files sc
- Page 124 and 125: JDOffice 1.2 Edit the Contract When
- Page 126 and 127: JDOffice 1.2 3. Click Edit. In the
- Page 128 and 129: JDOffice 1.2 If the machine either
73<br />
Setup<br />
• The selected operation will determine what drop-down boxes are active for that<br />
operation.<br />
10. Continue to select information for the active text boxes for Operation 1.<br />
• Values need to be typed in for the Rate and Depth/Height entries.<br />
• If you selected Tank Mix as an operation, the rate in the Task Wizard is the<br />
application rate of the entire mix; this rate may differ from the solution rate on the<br />
Tank Mix tab, as that is the base rate of the entire solution. Overrides of the<br />
application rate can be made in the field.<br />
11. Click Next to add another operation. Repeat steps 9-10.<br />
12. Click Done when you are finished.<br />
13. The program will jump to Page 8 of the Task Wizard (which is identical to the Task<br />
Builder screen.) Verify that the information is correct on this screen.<br />
• If changes are necessary, click in the box to be changed and click on the dropdown<br />
arrow that appears to the right of the box. Pick a new selection, or click Back<br />
until you reach the screen for the operation that needs to be edited. Make the<br />
corrections and click Done.<br />
14. Click Finish.<br />
Tillage Setup