(Yield) Maps - StellarSupport - John Deere

(Yield) Maps - StellarSupport - John Deere (Yield) Maps - StellarSupport - John Deere

stellarsupport.deere.com
from stellarsupport.deere.com More from this publisher
14.01.2013 Views

JDOffice 1.2 Task Wizard The Task Wizard consists of a series of screens and is intended for the beginner users of JDOffice as it guides the user through the necessary steps to complete a task. Once the task is defined, the builder is used to select the operations that will be included in that task. Using the Task Wizard: 1. Select a task from the list. 2. Click the Task Wizard button. 3. Select an Operator from the drop-down menu or select to add a new operator. 4. Select a Machine Type from the drop-down menu. 5. Select a Machine from the drop-down menu. • If was chosen for the Machine Type, this box will not be active. 6. Select an Implement Type from the drop-down menu. 7. Select an Implement from the drop-down menu. • If was chosen for the Implement Type, this box will not be active. 8. Click Next The first operation will be created on Page 2 of the Wizard. 9. In Operation, select the first operation. 72

73 Setup • The selected operation will determine what drop-down boxes are active for that operation. 10. Continue to select information for the active text boxes for Operation 1. • Values need to be typed in for the Rate and Depth/Height entries. • If you selected Tank Mix as an operation, the rate in the Task Wizard is the application rate of the entire mix; this rate may differ from the solution rate on the Tank Mix tab, as that is the base rate of the entire solution. Overrides of the application rate can be made in the field. 11. Click Next to add another operation. Repeat steps 9-10. 12. Click Done when you are finished. 13. The program will jump to Page 8 of the Task Wizard (which is identical to the Task Builder screen.) Verify that the information is correct on this screen. • If changes are necessary, click in the box to be changed and click on the dropdown arrow that appears to the right of the box. Pick a new selection, or click Back until you reach the screen for the operation that needs to be edited. Make the corrections and click Done. 14. Click Finish. Tillage Setup

73<br />

Setup<br />

• The selected operation will determine what drop-down boxes are active for that<br />

operation.<br />

10. Continue to select information for the active text boxes for Operation 1.<br />

• Values need to be typed in for the Rate and Depth/Height entries.<br />

• If you selected Tank Mix as an operation, the rate in the Task Wizard is the<br />

application rate of the entire mix; this rate may differ from the solution rate on the<br />

Tank Mix tab, as that is the base rate of the entire solution. Overrides of the<br />

application rate can be made in the field.<br />

11. Click Next to add another operation. Repeat steps 9-10.<br />

12. Click Done when you are finished.<br />

13. The program will jump to Page 8 of the Task Wizard (which is identical to the Task<br />

Builder screen.) Verify that the information is correct on this screen.<br />

• If changes are necessary, click in the box to be changed and click on the dropdown<br />

arrow that appears to the right of the box. Pick a new selection, or click Back<br />

until you reach the screen for the operation that needs to be edited. Make the<br />

corrections and click Done.<br />

14. Click Finish.<br />

Tillage Setup

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!