14.01.2013 Views

(Yield) Maps - StellarSupport - John Deere

(Yield) Maps - StellarSupport - John Deere

(Yield) Maps - StellarSupport - John Deere

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Tasks<br />

69<br />

Setup<br />

Do not rename the sample information with your information. Leave these as examples<br />

and create new ones.<br />

If an item has been used in the Task Builder or the Task Wizard as part of an operation,<br />

or if it had been previously used in unloaded data, you will not be able to inactivate it.<br />

Task Setup<br />

In prior releases, a task was considered a trip to the field to perform a specific function.<br />

That remains true for this release, however the concept is taken one step further: a task is<br />

now a template.<br />

Operations will be associated with each task, and will define what work needs to be done.<br />

Because tasks are only a guide, overrides can be made in the field via the GreenStar<br />

Display.<br />

For example, if you normally harrow till while you fertilize in the spring, you would create a<br />

new task called Spring Fertilizer. Using either the Task Wizard or the Task Builder, define<br />

two operations for this task: Tillage and Production Application. Select the corresponding<br />

data for each operation. Keep in mind that the operation details are not permanent - these<br />

can be altered in the field via the GreenStar Display. You are simply writing a guide<br />

(template) to a field activity.<br />

These tasks will then pre-populate the GreenStar Display, saving the machine operator<br />

additional work in the field. They can also be used to verify the correct operations (and<br />

rates) are used at the appropriate times.<br />

It doesn’t matter how many trips to the field it takes you to complete a task, you would<br />

select this choice on the GreenStar Display. Grouping field visits together under a specific<br />

task name ensures that the data will be grouped and displayed together on the maps and<br />

reports.<br />

Each defined task can contain up to six operations (Seeding, Product Application, Tillage,

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!