14.01.2013 Views

(Yield) Maps - StellarSupport - John Deere

(Yield) Maps - StellarSupport - John Deere

(Yield) Maps - StellarSupport - John Deere

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

JDOffice 1.2<br />

How do I create a Profitability Plan?<br />

Note: A Profitability Plan is an estimate of your profit or losses for an entire<br />

year of work in one field.<br />

Profitability Plan reports are based on the information that you entered in the Record<br />

Keeping Field Plan Details screen. Field Plans are templates that can be used as a basis<br />

for planning field work. These templates are field dependent, and are simply a general<br />

guideline of the tasks (steps) needed to produce yield in a given year. Because the<br />

ultimate goal of any planting season is to produce a crop, all Field Plans should have a<br />

Harvest operation. This operation is required to produce a Profitability Plan report because<br />

the report uses the Projected yield and Projected price of the crop to calculate a potential<br />

profit or loss for the year.<br />

Each task and<br />

operation within the<br />

Field Plan will have<br />

different monetary<br />

values that need to<br />

entered.<br />

In the Tasks/<br />

Operations list,<br />

select the first item<br />

and enter the<br />

corresponding<br />

values in the Details<br />

section on the right<br />

side of the screen.<br />

Do this for each item<br />

in the list.<br />

In addition, the report will use the Field area as entered on the Field Setup tab.<br />

Note: If you edit the task data on the Field Plan screen, it will not affect the<br />

Setup information. Conversely, if you edit a task (or operation) in the Setup<br />

tabs after you have assigned the task to a crop program or a field plan, those<br />

changes will not update within the program or plan. You need to delete the<br />

changed element from the program or plan, and add it back to get the updates.<br />

If you select a task in the list, the data on the right will display the Operator, Machine, and<br />

Implement (Resources), as selected in the Wizard/Builder on the Task Setup screen. If<br />

one of these three items was not selected, that column will be grayed out.<br />

If you select an operation, the data on the right will display the data as entered on the<br />

corresponding Setup tab; however, the Setup Rate per hour and Rate per acre values will<br />

not populate the Field Plan - these items must be entered manually on the Field Plan.<br />

328

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!