14.01.2013 Views

(Yield) Maps - StellarSupport - John Deere

(Yield) Maps - StellarSupport - John Deere

(Yield) Maps - StellarSupport - John Deere

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

159<br />

Record Keeping<br />

If you select a task in the list, the data on the right<br />

will display the Operator, Machine, and Implement<br />

TASK<br />

(Resources), as selected in the Wizard/Builder. If<br />

one of these three items was not selected, that<br />

column will be grayed out. The cost per area and<br />

cost per hour are populated from the data entered<br />

on the Resources Setup tabs.<br />

If you select an operation, the data on the right will<br />

display the data as entered on the corresponding<br />

Setup tab. All screens will not look alike.<br />

13. Edit any of the Task resources or Operation<br />

OPERATION in the<br />

details on the right side of the screen.<br />

• If you are editing a product application<br />

operation (fertilizer, tank mix, pesticide) and<br />

check the Pest Treated option, the Pests<br />

button will become activated so you can<br />

select the pests that you plan to treat.<br />

• If you are editing a product application operation (fertilizer, tank mix, pesticide) the<br />

Target rate is the rate at which you want the sprayer to deliver the chemical. This<br />

value can be overridden on the GreenStar Display. Whatever rate is actually<br />

applied (data will come from the sensors) will display in the Field History as the<br />

Actual rate.<br />

14. When finished, click OK on the Edit Field Plan Details screen.<br />

15. On the Field Plan screen, click Create Field History. The data in the Field Plan will<br />

populate the Field History screens. If you use sensors on <strong>John</strong> <strong>Deere</strong> equipment, the<br />

data unloaded from the PC Card will automatically update the Field History; if values<br />

are already there (from the field plan), they will be overwritten with the field data. If you<br />

do not use <strong>John</strong> <strong>Deere</strong> equipment, or have hired an outside source to complete a field<br />

task, you can manually enter the data in the Field History section.<br />

• If you would like the updated plan assigned to another field, (without having to start<br />

over from a crop program), click Copy to Other Fields. Select the desired fields<br />

and click OK. Repeat steps 4-16 for each new plan.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!