DVZ - SERVICES GmbH DVZ - SKA - „BIOMASTER“ - MS Engineering
DVZ - SERVICES GmbH DVZ - SKA - „BIOMASTER“ - MS Engineering DVZ - SERVICES GmbH DVZ - SKA - „BIOMASTER“ - MS Engineering
TABLE OF CONTENTS 1.0 G E N E R A L 2.0 F U N C T I O N A L D E S C R I P T I O N 3.0 T E C H N I C A L D A T A 4.0 S A F E T Y I N S T R U C T I O N S 5.0 I N S T A L L A T I O N I N S T R U C T I O N 5.1 POSITIONING 5.2 PIPE CONNECTIONS 5.3 ELECTRIC 6.0 S T A R T U P 6.1 GENERAL PROCEDURE FOR START UP 6.2 SET UP FOR OPERATION 6.3 VALVE SETTINGS FOR OPERATION 6.4 CONTROL SETTINGS 7.0 M A I N T E N A N C E 7.1 SLUDGE PUMP OUT 7.2 PUMPOUT PROCEDURE 7.3 DISINFECTANT SYSTEM 8.0 SHORT TERM LAY UP 8.1 LONG TERM LAY UP I SHUTDOWN 9.0 T R O U B L E S H O O T I N G 9.1 ODOR 9.2 ODOR FROM TREATMENT TANKS VENT 9.3 ODOR IN SPACE WHICH UNIT IS LOCATED 9.4 ODOR IN OTHER SPACES 9.5 POOR DRAINAGE (TOILETS DO NOT FLUSH PROPERLY) 9.6 FOAM FROM TREATMENT TANK VENT 9.7 EXCESSIVE BACK PRESSURE IN TREATMENT TANK 9.8 HIGH WATER LEVEL IN TREATMENT TANK Issue: 10.06.2009 Instruction Manual DVZ-SKA-“BIOMASTER“ Page 2 of 37 EOISKA-SD2n
9.9 WATER SPILLING OUT OF THE CONTACT TANK VENT 9.10 AERATION BLOWER CIRCUIT 9.11 DISCHARGE PUMP CIRCUIT 9.12 ELECTRODE TYPE LEVEL SWITCH 9.13 HIGHWATERLEVEL Issue: 10.06.2009 Instruction Manual DVZ-SKA-“BIOMASTER“ Page 3 of 37 EOISKA-SD2n
- Page 1: DVZ - SERVICES GmbH Boschstrasse 9
- Page 5 and 6: Here are the essential advantages a
- Page 7 and 8: 3. T E C H N I C A L D A T A TYPE D
- Page 9 and 10: 5.0 I N S T A L L A T I O N I N S T
- Page 11 and 12: 6.2 SET UP FOR OPERATION The system
- Page 13 and 14: 7.3 DISINFECTANT SYSTEM Check level
- Page 15 and 16: 9.0 T R O U B L E S H O O T I N G T
- Page 17 and 18: 9.6 FOAM FROM TREATMENT TANK VENT M
- Page 19 and 20: 9.11 DISCHARGE PUMP CIRCUIT 1. Pres
- Page 21 and 22: NIVEAU RELAIS / niveau relay DVZ -
- Page 23 and 24: DVZ 323-F-G3/4-24/50-E Bitte beacht
- Page 25 and 26: DOSIERPUMPE / metering pump DVZ-ALP
- Page 27 and 28: DVZ-ALPB Spare part list for dosing
- Page 29 and 30: Sehr starke Ausblaswirkung am Ausbl
- Page 31 and 32: KREISELPUMPE / centrifugal pump DVZ
- Page 33 and 34: ) Saug- oder Druckleitung verstopft
- Page 35 and 36: SCHNITTBILD SECTION DRAWING Issue:
TABLE OF CONTENTS<br />
1.0 G E N E R A L<br />
2.0 F U N C T I O N A L D E S C R I P T I O N<br />
3.0 T E C H N I C A L D A T A<br />
4.0 S A F E T Y I N S T R U C T I O N S<br />
5.0 I N S T A L L A T I O N I N S T R U C T I O N<br />
5.1 POSITIONING<br />
5.2 PIPE CONNECTIONS<br />
5.3 ELECTRIC<br />
6.0 S T A R T U P<br />
6.1 GENERAL PROCEDURE FOR START UP<br />
6.2 SET UP FOR OPERATION<br />
6.3 VALVE SETTINGS FOR OPERATION<br />
6.4 CONTROL SETTINGS<br />
7.0 M A I N T E N A N C E<br />
7.1 SLUDGE PUMP OUT<br />
7.2 PUMPOUT PROCEDURE<br />
7.3 DISINFECTANT SYSTEM<br />
8.0 SHORT TERM LAY UP<br />
8.1 LONG TERM LAY UP I SHUTDOWN<br />
9.0 T R O U B L E S H O O T I N G<br />
9.1 ODOR<br />
9.2 ODOR FROM TREATMENT TANKS VENT<br />
9.3 ODOR IN SPACE WHICH UNIT IS LOCATED<br />
9.4 ODOR IN OTHER SPACES<br />
9.5 POOR DRAINAGE (TOILETS DO NOT FLUSH<br />
PROPERLY)<br />
9.6 FOAM FROM TREATMENT TANK VENT<br />
9.7 EXCESSIVE BACK PRESSURE IN TREATMENT TANK<br />
9.8 HIGH WATER LEVEL IN TREATMENT TANK<br />
Issue: 10.06.2009 Instruction Manual <strong>DVZ</strong>-<strong>SKA</strong>-“BIOMASTER“ Page 2 of 37<br />
EOI<strong>SKA</strong>-SD2n