7.0 M A I N T E N A N C E<br />

7.1 SLUDGE PUMP OUT<br />

If the accumulated sludge at the bottom of the Treatment Tank is not removed, it will spill<br />

over into the Contact tank. In general terms, if the water in the sight glass turns from clear<br />

to grey or brown, a pumpout is required to keep the effluent quality above that required by<br />

IMCO standards.<br />

If it can be anticipated, that the ship will go to restricted waters, a sludge pump out shall be<br />

performed a few days before, in open (unrestricted discharge) waters, to ensure full<br />

operational time available without need of de-sludging. The procedure outlined below is<br />

recommended if the system is to consistently produce a clear effluent. The frequence of<br />

pumpout is determined by operating history and the owner's requirements. The time period<br />

specified below is average and based on the system operating at 100 % of rated capacity.<br />

7.2 PUMPOUT PROCEDURE<br />

1. Bypass sewage system or close sewage inlet valve.<br />

2. Turn Discharge Pump off.<br />

3. Close Disinfecting tank discharge valve V3.<br />

5. Open the Pre-Treatment Tank valve V1 or Treatment Tank valve V2<br />

6. Start discharge pump(s) manually (if provided) and drain or pump contents overboard,<br />

if outside of regulated waters, or into a suitable receiver for disposal.<br />

7. Turn discharge pump(s) off when tanks are empty. DO NOT RUN PUMP(S) DRY.<br />

8. Close the Pre-Treatment Tank valve V1 or Treatment Tank valve V2<br />

9. Refill the Treatment Tank with water immediately after pumpout to maintain the<br />

bacteria and start up following procedure under „START UP“.<br />

DO NOT ALLOW SYSTEM TO REFILL WITH SEWAGE WITHOUT FIRST FILLING<br />

WITH WATER.<br />

For highest quality, drain Pre-Treatment Tank and Treatment Tank at 3 month intervals<br />

maximum.<br />

Issue: 10.06.2009 Instruction Manual <strong>DVZ</strong>-<strong>SKA</strong>-“BIOMASTER“ Page 12 of 37<br />

EOI<strong>SKA</strong>-SD2n

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!