DVZ - SERVICES GmbH DVZ - SKA - „BIOMASTER“ - MS Engineering
DVZ - SERVICES GmbH DVZ - SKA - „BIOMASTER“ - MS Engineering
DVZ - SERVICES GmbH DVZ - SKA - „BIOMASTER“ - MS Engineering
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
6.2 SET UP FOR OPERATION<br />
The system should be set up for normal, automatic operation as specified below. If starting<br />
up the unit new or after shutdown, refer to section „SART UP“. The Contact tank must be<br />
about half full as indicated by Contact tank sight glass.<br />
6.3 VALVE SETTINGS FOR OPERATION<br />
Discharge valves<br />
Function Valve setting<br />
V1 V2 V3<br />
Discharge of sludge from pre-treatment<br />
tank<br />
open close close<br />
Discharge of sludge from Treatment<br />
Tank<br />
close open close<br />
Discharge of disinfecting tank<br />
close close open<br />
All valves must be either fully opened or fully closed.<br />
6.4 CONTROL SETTINGS<br />
Switch Position<br />
Main circuit breaker ON<br />
Blower Push ON to start<br />
Pump AUTO<br />
Issue: 10.06.2009 Instruction Manual <strong>DVZ</strong>-<strong>SKA</strong>-“BIOMASTER“ Page 11 of 37<br />
EOI<strong>SKA</strong>-SD2n