14.01.2013 Views

DVZ - SERVICES GmbH DVZ - SKA - „BIOMASTER“ - MS Engineering

DVZ - SERVICES GmbH DVZ - SKA - „BIOMASTER“ - MS Engineering

DVZ - SERVICES GmbH DVZ - SKA - „BIOMASTER“ - MS Engineering

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6.2 SET UP FOR OPERATION<br />

The system should be set up for normal, automatic operation as specified below. If starting<br />

up the unit new or after shutdown, refer to section „SART UP“. The Contact tank must be<br />

about half full as indicated by Contact tank sight glass.<br />

6.3 VALVE SETTINGS FOR OPERATION<br />

Discharge valves<br />

Function Valve setting<br />

V1 V2 V3<br />

Discharge of sludge from pre-treatment<br />

tank<br />

open close close<br />

Discharge of sludge from Treatment<br />

Tank<br />

close open close<br />

Discharge of disinfecting tank<br />

close close open<br />

All valves must be either fully opened or fully closed.<br />

6.4 CONTROL SETTINGS<br />

Switch Position<br />

Main circuit breaker ON<br />

Blower Push ON to start<br />

Pump AUTO<br />

Issue: 10.06.2009 Instruction Manual <strong>DVZ</strong>-<strong>SKA</strong>-“BIOMASTER“ Page 11 of 37<br />

EOI<strong>SKA</strong>-SD2n

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!