Dames & Moore, 1999 - USDA Forest Service

Dames & Moore, 1999 - USDA Forest Service Dames & Moore, 1999 - USDA Forest Service

13.01.2013 Views

ORC 1 ORC 4 ARC 7 XRC 2 ORC 5 Tailings Pile 1 +Tailings Pile 2 ' -Tailings Pile 3 X West Waste Rock Pile East Waste Rock Pile Mill Building +portal Drainage P-1 0 Portal Drainage P-5 Fiaure 6.4-1 1 - ---- - -- - - - SURFACE AND SEEPAGE WATER SAMPLES DAMES & MOORE ALUMINUM VS pH SCATTER PLOT A DAMES 6 MOORE GROUP COMPANY Holden Mine RIIFS Draft Final RI Report

ORC 1 ORC 4<br />

ARC 7 XRC 2<br />

ORC 5 Tailings Pile 1<br />

+Tailings Pile 2 ' -Tailings Pile 3<br />

X West Waste Rock Pile East Waste Rock Pile<br />

Mill Building +portal Drainage P-1<br />

0 Portal Drainage P-5<br />

Fiaure 6.4-1 1<br />

- ---- - -- - - -<br />

SURFACE AND SEEPAGE WATER SAMPLES<br />

DAMES & MOORE ALUMINUM VS pH SCATTER PLOT<br />

A DAMES 6 MOORE GROUP COMPANY<br />

Holden Mine RIIFS<br />

Draft Final RI Report

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!