Wolman pebble counts), occurrence and extent of iron flocculent and precipitate. sediment transport. and<br />

sediment sources. The field findings are summarized in Sections 4.3.3.3 and 4.6.1.2.<br />

Sampling and analysis of streambed sediment at the Site was not feasible because the dominant streambed<br />

material was cobble and small boulder throughout the affected reach of Railroad Creek.<br />

3.4.3.1 Railroad Creek Ferricrete Assessment<br />

The main objective of the ferricrete assessment was to describe the extent, thickness and character of the<br />

ferricrete along Railroad Creek, and develop a conceptual model of ferricrete formation and its effect on<br />

the hydrologic/hydrogeologic regime. To achieve these objectives. field reconnaissance along the south<br />

and north banks of Railroad Creek (in the vicinity of the tailings) was conducted during late September<br />

and early October 1997. The channel and banks were inspected for conditions characteristic of ferricrete.<br />

In addition, test pits were excavated into areas of observed ferricrete formation to assess the vertical and<br />

lateral character of the deposits. Due to limited accessibility of the channel with mechanized excavation<br />

equipment, two areas were chosen to excavate test pits: immediately east of tailings pile 1 and<br />

immediately east of tailings pile 3.<br />

During September 1997, four test pits were excavated by Cragg's Excavating under subcontract to <strong>Dames</strong><br />

& <strong>Moore</strong> (Figure 3.1-2 and Table 3.0-1 under "Subsurface/Surface Soil"). Three of the test pits<br />

(DMTP3E-I, 2 and 3) were located in the high water channel or wetland floodplain of Railroad Creek,<br />

just east of tailings pile 3. One test pit (DMTPIE-I) was located in the high water channel of Railroad<br />

Creek about midway between the confluence of Copper Creek and the east end of tailings pile I. Each<br />

test pit was photo-documented and described according to Unified Soil Classification System (USCS)<br />

methods and with additional comments related to the observed hydrogeologic conditions. In addition,<br />

partially cemented to cemented material was also encountered in trench DMTP3-4, which was excavated<br />

into the side and base of tailings pile 3, in the same general area of the three other test pits. The field<br />

findings are presented in Section 4.3.9.<br />

3.5 TASK 5 - MILL BUILDING ASSESSMENT<br />

Referring to Figures 3.1-2 and 3.1-3, and Table 3.0-1 (under "Feature/Arean), the mill site was assessed as<br />

part of the RI.<br />

3.5.1 USGS Assessment of Mill Building-Related Salts and Unprocessed Ore<br />

Samples of the mill-related salts and unprocessed ore have been sampled by others in the recent past<br />

(USGS, 1996 and 1997); seven samples were collected in 1995 and two samples were collected in 1996.<br />

The results of the studies were agreed upon by the Holden Mine RIRS Technical Group to be sufficient<br />

and of adequate data quality for use in RI characterization. Additional sampling of the salts and<br />

unprocessed ore was not conducted during the RI. The data were evaluated in order to characterize the<br />

environmental conditions in the mill building. The laboratory test results are presented in Section 5.4.3.2<br />

under "Mill Building Drip Water."<br />

G:\wpdata\005~c~ons~olden-2~i~-0,d0~<br />

17693-005-019Wuly 19. <strong>1999</strong>:2:07 PM;DRAFT FINAL RI REPORT