1986<br />

1988<br />

1988<br />

1989<br />

Science Applications<br />

International<br />

Corporation<br />

Energy and<br />

Environmental<br />

Systems Division,<br />

ArgonneNational<br />

Laboratory<br />

Pacific Northwest<br />

Laboratories (PNL)<br />

Peven<br />

G:\wp&taV)OSLepo~U1oldc~t\riU4.doc<br />

17693-005-019Uuly 19,<strong>1999</strong>;2:22 PM;DRAFT FINAL RI REPORT<br />

TABLE 2.4-1 (CONTINUED)<br />

PREVIOUS INVESTIGATIONS AND STUDIES<br />

from Holden tailings, and a fish survey of Railroad Creek conducted by the Washington Department<br />

A consultant to the Washington State Department of Ecology completed a.Potential Hazardous WasteNo data applicable for R1 Site characteriiration<br />

Site Preliminary Assessment of the mine site. -The report presented recommendations for additional soil<br />

sampling in tailings areas and sampling of leachate and runoff from tailings piles and mine portal.<br />

Recommendations for construction of berms to prevent erosion into Railroad Creek were also presented.<br />

Submitted a Drafl Holden Mine Reclamation Plan Preliminary Scope of Work to the U.S. <strong>Forest</strong> <strong>Service</strong>, No data applicable for RI Site characterization<br />

Wenatchee National <strong>Forest</strong>. Described the background and scope of work of the reclamation plan which<br />

provided for designing portal water treatment system, designing shape, treatment and revegetation of<br />

tailings piles, stream relocation and stabilization program, tailings stabilization assessment,<br />

environmental monitoring, and construction monitoring.<br />

Developed a reclamation plan for the Wenatchee National <strong>Forest</strong>. PNL subcontracted to CHZM Hill of No data applicable for Rl Site characterization<br />

Bellevue, Washington to prepare the reclamation plans. PNL developed an environmental monitoring<br />

plan to evaluate the impacts of the mine-related elements on wind and water quality. PNL then<br />

implemented the monitoring plan.<br />

The purpose of this survey was to document the annual trends of kokanee and chinook production that No data applicable for RI Site characterization<br />

occurs within the Lake Chelan drainage. Several drainages to Lake Chelan were surveyed. Railroad<br />

Creek is presented on the map which identifies it as a "spawner stream", however, no data are presented