Dames & Moore, 1999 - USDA Forest Service
Dames & Moore, 1999 - USDA Forest Service Dames & Moore, 1999 - USDA Forest Service
Brown, H.A., R.B. Bury, D.M. Darda, L.V. Diller, C.R. Peterson and R.M. Storm. 1995. Revtiles of Washinaon and Oregon. Seattle Audubon Society. Seattle, WA. Brown, L. G. 1994. On the Zooneogravhv and Life History of Washington's Native Chars - Dolly Varden, Salvelinus malma (Walbaum) and Bull Trout, Salvelinus confluentus (Sucklev). WDFW. Olympia, Washington. Burke, T. 1999. Phone Conversation with Tom Burke, mollusk specialist in the Entiat Ranger District, Wenatchee National Forest. Byron, W.R., G.W. Bierbower, J.B. Brouwer and W.H. Hansen. 1967. Patholonic changes in rats and dogs from two-vear feeding of sodium arsenite or sodium arsenate. Toxicol. Appl. Pharmacol. >r 10:132-147. Cain, D.J., S.N. Luoma, J.L. Carter and S.V. Fend. 1992. Aquatic insects as bioindicators of trace . t i2 element contamination in cobble-bottom rivers and streams. Ca. J. Fish. Aquat. Sci. 49: 2141- 1: 2154. Cater, F.W. and D.F. Crowder. 1967. Geologic Mav of the Holden Ouadrangle, Snohomish and Chelan Counties. Washinnton. U.S. Geological Survey Map GQ-G46. Cater, F.W. and T.L. Wright. 1967. Geologic Mav of the Lucerne Ouadranale, Chelan Countv, Washington. U.S. Geological Survey Map GQ-G47. Christy, R.E. and S.D. West. 1993. Biolow of Bats in Douglas-Fir Forests. U.S. Department of Agriculture: Forest Service. Pacific Northwest Research Location. General Technical Report PNR-GTR-3 08. Church, S.E., A.B. Ford, V.J. Flanigan and R.B. Stotelmeyer. 1984. Mineral Resource Potential of the Glacier Peak Wilderness and Adiacent 'Areas. Chelan. Skagit, and Snohomish Counties, Washinnton. Prepared for Department of Interior, U.S. Geological Survey. Collins, L., R. Edmond, L. Bustad and E. Zoerb. 1972. Holden Village Trails. Crates, James A. 1966. Watershed Rehabilitation Plan For Railroad and Covper Creeks. Prepared by the ... : . . . USDA Forest Service, Wenatchee Natibnal ores st, Chelan Ranger District. Custer, T.W., J.C. Franson, and O.H. Pattee. 1984. Tissue lead distribution and hematologic effects in American kestrels (Falco sparverius L.)fed biological.ly incorporated lead. J. Wldf. Mngt. 20: 39-43. Daly, C. 1982. Evaluation of vrocedures for determining selected aauifer parameters. Prepared for United States Army Toxic Hazardous Materials Agency. CR REL Report 82-4 1. Dames & Moore, 1998a. Phase 111 Remedial Investigation Appendix A - Sampling and Analysis Plan (SAP), April 17, 1998. Prepared for Alumet, Inc. H:\I I-O.doc 17693-005-019Uuly 29.1999;5:11 PM;DRAFT FINAL RI REPORT
Dames & Moore, 1998b. Phase I11 Remedial Investigation Quality Assurance Project Plan (QAPP), April 17, 1998. Prepared for Alumet, Inc. Dames &. Moore, 1998c. Phase I11 Remedial Investigation Health and Safety Plan, April 17, 1998. Prepared for Alumet, Inc. Dames & Moore, 1998d. Draft Addendum to May 1998 Sampling and Analysis Plan - Benthic Macroinvertebrate Sampling and Analysis plan, April 27, 1998. Prepared for Alumet, Inc. Dames & Moore, 1998e. Addendum to May 1998 Sampling and Analysis Plan - Dye Tracer Sampling and Analysis Plan, June 5, 1998. Prepared for Alumet, Inc. Dames & Moore, 1998f. Sediment Reconnaissance Plan, Lucerne Bar, August 17, 1998. Prepared for Alumet, Inc. Dames & Moore, 1998g. Phase III Remedial Investigation Work Plan Addendum - Downloading Groundwater 'Leval Data, Lagoon Area Soil Sampling, Backyard Surface Soil Sampling. Prepared for Alumet, Inc. Dames & Moore, 1998h. Phase 111 ~emedial Investigation Work Plan Addendum .2 - Stream Flow Measurements, Geologic Mapping. September 10, 1998. Prepared for Alumet, Inc. Dames and Moore, 1998i. Responses to Agency Comments to Phase I11 RI Draft Sampling and Analysis Plans, October 5. Dames & Moore, l998j. Phase I11 Remedial Investigation Selection of sediment Sampling Reference Locations, October 7, 1998. Prepared for Alumet, Inc. Dames & Moore, 1998k. Phase III Remedial Investigation Suppoiting ,Figures, October 9, 1998. Prepared for USFS. . . Dames & Moore, 1997a. Draft Auril 1997 Surface Water Flow and Water Oualitv Sampling and Analysis Plan. April 10, 1997. ~01den'~ine Project. Prepared for U.S. Forest service - Chelan Ranger District. Dames & Moore, 1997b. Oualitv Assurance/Oualitv Control Proiect Plan (OAPP). April 10, 1997. Holden Mine Project. Prepared for U.S. Forest Service - Chelan Ranger District. Dames & Moore, 1997c. Health and Safetv Plan, Remedial Investigation Holden Mine. Railroad Creek Watershed. April 10, 1997. Prepared for U.S. Forest Service - Chelan Ranger District. Dames & Moore, 1997d. Phase I Remedial Investigation A~pendix A - Sampling and Analysis Plan (SAP). May 13, 1997. Prepared for Alumet, Inc. Dames &.Moore, 1997e. Phase I' Remedial Investigation A~pendix B - Oualitv Assurance Proiect Plan (OAPP). May 13, 1997. Prepared for Alumet, Inc. H:\l I-0.d~ 17693-005-019Uuly 29. 1999;5:11 PM;DRAI;T FNAL RI REPORT .
- Page 1144 and 1145: native soil is of higher permeabili
- Page 1146 and 1147: Macroinvertebrate sampling included
- Page 1148 and 1149: Above Tenmile Creek Confluence (RC-
- Page 1150 and 1151: Reference Reaches - Stehekin River
- Page 1152 and 1153: 3 during the 1997 investigation ind
- Page 1154 and 1155: Subsurface Soils Cadmium, copper, a
- Page 1156 and 1157: Station' RC-4 RC-7 RC-2 RC-5 RC-10
- Page 1158 and 1159: 8.3.4.1 Western Portion of Site Dur
- Page 1160 and 1161: 0 mine, Honeymoon Heights, the wast
- Page 1162 and 1163: I . During The water from the west
- Page 1164 and 1165: a The Copper Creek diversion accoun
- Page 1166 and 1167: 8.5.2.1 Trout An intem~ediate poten
- Page 1168 and 1169: i SOURCE: Walten et al., 1992 USGS
- Page 1170 and 1171: SOURCE: Base map information from U
- Page 1172 and 1173: NOTE: This cross section is general
- Page 1174 and 1175: D.7 D. 8 D. 9 E.0 SOURCE: Base map
- Page 1176 and 1177: 9.2.2 Site Surface WaterIGroundwate
- Page 1178 and 1179: 9.2.4.1 Portal Drainage The chemica
- Page 1180 and 1181: Groundwater discharge from the tail
- Page 1182 and 1183: The combined results of the ERA and
- Page 1184 and 1185: 9.2.11 . Winston Home Sites Fuel St
- Page 1186 and 1187: SOURCE: USGS Topographic Map, State
- Page 1189 and 1190: SOURCE: Base map information from U
- Page 1191 and 1192: 10.0 PROJECT SCHEDULE The, schedule
- Page 1193: I ATSDR. 1990. Toxicological profil
- Page 1197 and 1198: Ebbutt,%F. 1956. Letter Report to V
- Page 1199 and 1200: ';i 1 Products, Shale-oils and Soot
- Page 1201 and 1202: Leland, H.V. and J.L. Carter. 1984.
- Page 1203 and 1204: I Pacific Northwest Laboratory. 199
- Page 1205 and 1206: Seed, H.B., Idriss, I.M. and Arango
- Page 1207 and 1208: U.S. EnvirOnmcntal Protection Agenc
- Page 1209 and 1210: U.S.n.>.,. .F(zxli,st S::a;ice.. 19
- Page 1211: l#e~ehat~ihi& ~ati'onsi '~ol'c!en.~
- Page 1214 and 1215: 7 MEMORANDUM Date: To: From: Subjec
- Page 1216 and 1217: INORGANICS ANALYSIS DATA SHEET Samp
- Page 1218 and 1219: INORGANICS ANALYSIS DATA SHEET Samp
- Page 1220 and 1221: G CHAIN-OF-CUSTODY RECORD WHITE COP
- Page 1222 and 1223: June 15, 1998 Surface Water, May 19
- Page 1224 and 1225: June 15, 1998 Surface Water, May 19
- Page 1226 and 1227: June 15, 1998 Surface Water, May 19
- Page 1228 and 1229: INORGANICS ANALYSIS DATA SHEET Samp
- Page 1230 and 1231: I INORGANICS ANALYSIS DATA SHEET TO
- Page 1232 and 1233: INORGANICS ANALYSIS DATA SHEET Synp
- Page 1234 and 1235: INORGANICS ANALYSIS DATA SHEET Samp
- Page 1236 and 1237: INORGANICS ANALYSIS DATA SHEET TOTA
- Page 1238 and 1239: - INORGANICS ANALYSIS DATA SHEET Sa
- Page 1240 and 1241: INORGANICS ANALYSIS DATA SHEET Samp
- Page 1242 and 1243: INORGANICS ANALYSIS DATA SHEET Samp
<strong>Dames</strong> & <strong>Moore</strong>, 1998b. Phase I11 Remedial Investigation Quality Assurance Project Plan (QAPP), April<br />
17, 1998. Prepared for Alumet, Inc.<br />
<strong>Dames</strong> &. <strong>Moore</strong>, 1998c. Phase I11 Remedial Investigation Health and Safety Plan, April 17, 1998.<br />
Prepared for Alumet, Inc.<br />
<strong>Dames</strong> & <strong>Moore</strong>, 1998d. Draft Addendum to May 1998 Sampling and Analysis Plan - Benthic<br />
Macroinvertebrate Sampling and Analysis plan, April 27, 1998. Prepared for Alumet, Inc.<br />
<strong>Dames</strong> & <strong>Moore</strong>, 1998e. Addendum to May 1998 Sampling and Analysis Plan - Dye Tracer Sampling<br />
and Analysis Plan, June 5, 1998. Prepared for Alumet, Inc.<br />
<strong>Dames</strong> & <strong>Moore</strong>, 1998f. Sediment Reconnaissance Plan, Lucerne Bar, August 17, 1998. Prepared for<br />
Alumet, Inc.<br />
<strong>Dames</strong> & <strong>Moore</strong>, 1998g. Phase III Remedial Investigation Work Plan Addendum - Downloading<br />
Groundwater 'Leval Data, Lagoon Area Soil Sampling, Backyard Surface Soil Sampling.<br />
Prepared for Alumet, Inc.<br />
<strong>Dames</strong> & <strong>Moore</strong>, 1998h. Phase 111 ~emedial Investigation Work Plan Addendum .2 - Stream Flow<br />
Measurements, Geologic Mapping. September 10, 1998. Prepared for Alumet, Inc.<br />
<strong>Dames</strong> and <strong>Moore</strong>, 1998i. Responses to Agency Comments to Phase I11 RI Draft Sampling and Analysis<br />
Plans, October 5.<br />
<strong>Dames</strong> & <strong>Moore</strong>, l998j. Phase I11 Remedial Investigation Selection of sediment Sampling Reference<br />
Locations, October 7, 1998. Prepared for Alumet, Inc.<br />
<strong>Dames</strong> & <strong>Moore</strong>, 1998k. Phase III Remedial Investigation Suppoiting ,Figures, October 9, 1998.<br />
Prepared for USFS.<br />
. . <strong>Dames</strong> & <strong>Moore</strong>, 1997a. Draft Auril 1997 Surface Water Flow and Water Oualitv Sampling and<br />
Analysis Plan. April 10, 1997. ~01den'~ine Project. Prepared for U.S. <strong>Forest</strong> service - Chelan<br />
Ranger District.<br />
<strong>Dames</strong> & <strong>Moore</strong>, 1997b. Oualitv Assurance/Oualitv Control Proiect Plan (OAPP). April 10, 1997.<br />
Holden Mine Project. Prepared for U.S. <strong>Forest</strong> <strong>Service</strong> - Chelan Ranger District.<br />
<strong>Dames</strong> & <strong>Moore</strong>, 1997c. Health and Safetv Plan, Remedial Investigation Holden Mine. Railroad Creek<br />
Watershed. April 10, 1997. Prepared for U.S. <strong>Forest</strong> <strong>Service</strong> - Chelan Ranger District.<br />
<strong>Dames</strong> & <strong>Moore</strong>, 1997d. Phase I Remedial Investigation A~pendix A - Sampling and Analysis Plan<br />
(SAP). May 13, 1997. Prepared for Alumet, Inc.<br />
<strong>Dames</strong> &.<strong>Moore</strong>, 1997e. Phase I' Remedial Investigation A~pendix B - Oualitv Assurance Proiect Plan<br />
(OAPP). May 13, 1997. Prepared for Alumet, Inc.<br />
H:\l I-0.d~<br />
17693-005-019Uuly 29. <strong>1999</strong>;5:11 PM;DRAI;T FNAL RI REPORT<br />
.