Ref. No.: <strong>RFP</strong> <strong>58</strong>/<strong>FY</strong> <strong>2012</strong>-<strong>2013</strong>/<strong>CO</strong>: <strong>DIT</strong>/<strong>Laptops</strong>-<strong>USB</strong>/<strong>rk</strong> Date: 27-08-<strong>2012</strong><br />
11) WARRANTY AND SUBMISSION OF BANK GUARANTEE:<br />
<strong>Laptops</strong> shall carry a free comprehensive, onsite international warranty for a<br />
minimum period of Three (3) Years , however, for Battery, Power Cord and<br />
Adaptor, it is one year warranty including replacement.<br />
<strong>Bank</strong> may enter into annual maintenance contract (AMC) with the Vendor after<br />
completion of free warranty period of three years at mutually agreed rates<br />
between the <strong>Bank</strong> and the Vendor.<br />
WARRANTY:<br />
a) The Bidder warrants that the Goods supplied under the Contract are new,<br />
unused and shall have no defect arising from design, materials or<br />
wo<strong>rk</strong>manship.<br />
b) This Warranty shall remain valid for a minimum period of 36 (Thirty Six)<br />
months after the goods, or any portion thereof as the case may be, have<br />
been delivered to and accepted at the final destination indicated in the<br />
Contract, or for minimum period of 39 (Thirty Nine) months after the date of<br />
delivery, whichever period concludes earlier.<br />
c) Within Thirty (30) days of the acceptance of the Purchase Order from the<br />
<strong>Bank</strong>, the Selected Bidder shall furnish the Performance Security (BG)<br />
equivalent to 10% (ten percent) of the Contract Value from the reputed<br />
<strong>Bank</strong>s in India, other than <strong>Syndicate</strong><strong>Bank</strong> for the period of 42 months as per<br />
the format.<br />
� If BG is not submitted within stipulated time, a penalty at the rate of<br />
0.50% of the Contract Value of <strong>Laptops</strong> will be levied for every week<br />
subject to a maximum of 10% of the Contract Value of <strong>Laptops</strong>.<br />
Failure of the Selected Bidder to comply with the requirement of accepting<br />
the Purchase Order and/or submitting Performance Security shall constitute<br />
sufficient grounds for the annulment of the award and forfeiture of the Bid<br />
Security.<br />
12) PAYMENT TERMS:<br />
All payments will be released from our office within 30 days of claim on<br />
submission of all relevant documents and proofs. The payments will be released<br />
through NEFT/ RGTS and the Selected Bidder has to provide necessary <strong>Bank</strong><br />
Details like Account No., <strong>Bank</strong>’s Name with Branch, IFSC Code etc. Applicable<br />
TDS, if any, will be deducted at the time of releasing the payments.<br />
i) On Delivery: Seventy (70) % of the Contract Price of the Goods along with<br />
100% sales tax, 100% Octroi, wherever applicable, backed by necessary<br />
proof shall be paid on receipt of goods and upon submission of the following<br />
documents (separate requests for release of Octroi payments will not be<br />
entertained):<br />
a) Bidder's Original Invoice (with certified Xerox copy), showing Contract No,<br />
Goods description, quantity, unit price, total amount, Serial Nos. of the<br />
Equipment/s etc.<br />
Page 7 of 36