Qinshan CANDU Project Construction Experiences and Lessons
Qinshan CANDU Project Construction Experiences and Lessons Qinshan CANDU Project Construction Experiences and Lessons
2003 February 8,000 7,000 6,000 5,000 4,000 3,000 2,000 1,000 0 General Statistics: Structural Steel 17,400 T Miscelleansous Steel 6,400 T Steel Decks 66,500 M2 Includes primary and secondary steel, platforms, structural equipment and pipe supports, crane rails, shielding plates, and all forms of miscellaneous steel erection works. 1998 Q1 1998 Q2 1998 Q3 1998 Q4 Steel Works Qinshan CANDU Project (2 x 728 MWe) 1999 Q1 1999 Q2 1999 Q3 1999 Q4 2000 Q1 2000 Q2 32 2000 Q3 2000 Q4 2001 Q1 2001 Q2 2001 Q3 2001 Q4 Steel Quarterly Quantity T Steel Cumulative Quantity T Figure 10-4 Steel Works 2002 Q1 2002 Q2 2002 Q3 0 24,000 21,000 18,000 15,000 12,000 9,000 6,000 3,000
2003 February 10,000 9,000 8,000 7,000 6,000 5,000 4,000 3,000 2,000 1,000 0 50,000 45,000 40,000 35,000 30,000 25,000 20,000 15,000 10,000 5,000 0 General Statistics: Block Walls 41,100 M2 Claddings & Roofing 70,600 M2 Finishes, Liners and 600,000 M2 Protective Coatings Architectural Works Qinshan CANDU Project (2 x 728 MWe) 1998 Q1 1998 Q2 1998 Q3 1998 Q4 1999 Q1 1999 Q2 1999 Q3 1999 Q4 2000 Q1 2000 Q2 2000 Q3 2000 Q4 2001 Q1 2001 Q2 2001 Q3 2001 Q4 2002 Q1 2002 Q2 2002 Q3 Block Walls Quarterly Quantity M2 Block Walls Cumulative Quantity M2 General Statistics: Large Bore Pipe 77,800 M (4,400 T) Small Bore Pipe 130,000 M (437 T) HVAC Ductwork 43,800 M2 Major Mech. Equip. 2,500 Pieces Pipe & Equip. Insulation 59,800 M2 Large bore piping (>2-1/2") was prefabricated and stock piled off-site and delivered on an as needed basis. Figure 10-5 Architectural Works Mechanical Works Qinshan CANDU Project (2 x 728 MWe) 1998 Q1 1998 Q2 1998 Q3 1998 Q4 1999 Q1 1999 Q2 1999 Q3 1999 Q4 2000 Q1 2000 Q2 2000 Q3 2000 Q4 2001 Q1 2001 Q2 2001 Q3 2001 Q4 2002 Q1 2002 Q2 2002 Q3 Piping Installation Quantities M \ Quarter Piping Installation Quantities Cumulative M Figure 10-6 Mechanical Works 33 0 50,000 45,000 40,000 35,000 30,000 25,000 20,000 15,000 10,000 5,000 0 250,000 225,000 200,000 175,000 150,000 125,000 100,000 75,000 50,000 25,000
- Page 1 and 2: QINSHAN CANDU PROJECT CONSTRUCTION
- Page 3 and 4: 2003 February TABLE OF CONTENTS SEC
- Page 5 and 6: 2003 February TABLE OF CONTENTS SEC
- Page 7 and 8: 2003 February design, which will ha
- Page 9 and 10: 2003 February ECGD Export Credits G
- Page 11 and 12: 2003 February 1. CONTRACT ORGANIZAT
- Page 13 and 14: Figure 1-1 AECL Overall Project Con
- Page 15 and 16: AECL Project Quality Assurance Mana
- Page 17 and 18: Figure 1-5 Qinshan CANDU Project -
- Page 19 and 20: 2003 February 3. LICENSING AND REGU
- Page 21 and 22: 2003 February 2) A technical suppor
- Page 23 and 24: 2003 February 4. SCHEDULES The hear
- Page 25 and 26: 2003 February Figure 5-1 Major Mile
- Page 27 and 28: 2003 February 6. DESIGN AND PROCURE
- Page 29 and 30: 2003 February format of the SPMO Co
- Page 31 and 32: 2003 February 7) Disposition of tec
- Page 33 and 34: 2003 February Steam generators (220
- Page 35 and 36: 2003 February - Accounting Manageme
- Page 37 and 38: 2003 February 9. METHOD TO SUBCONTR
- Page 39 and 40: 2003 February 10. RESOURCES AND QUA
- Page 41: 2003 February 80000 70000 60000 500
- Page 45 and 46: 2003 February 11. MATERIAL MANAGEME
- Page 47 and 48: 2003 February 12.4 Accommodations E
- Page 49 and 50: 2003 February TQNPC was responsible
- Page 51 and 52: 2003 February 6. Loss of Class IV T
- Page 53 and 54: 2003 February Open item management
- Page 55 and 56: General Manager (TQNPC) Project Dir
- Page 57 and 58: 2003 February Commissioning Technic
- Page 59 and 60: 45 40 35 30 25 AECL BECHTEL M-M HIT
- Page 61 and 62: Figure 13-6 TQNPC Commissioning Tec
- Page 63 and 64: 2003 February 14. AECL STUDY: LESSO
- Page 65 and 66: 2003 February 15. AECL’S STUDY: F
- Page 67 and 68: 2003 February • Improvements in p
- Page 69 and 70: 2003 February Appendix A Design and
- Page 71 and 72: 2003 February • RFC(S) BOP Tech S
- Page 73 and 74: 2003 February Appendix B Quality As
- Page 75 and 76: 2003 February To initiate this surv
- Page 77 and 78: 2003 February better records are av
- Page 79 and 80: 2003 February philosophy and includ
2003 February<br />
10,000<br />
9,000<br />
8,000<br />
7,000<br />
6,000<br />
5,000<br />
4,000<br />
3,000<br />
2,000<br />
1,000<br />
0<br />
50,000<br />
45,000<br />
40,000<br />
35,000<br />
30,000<br />
25,000<br />
20,000<br />
15,000<br />
10,000<br />
5,000<br />
0<br />
General Statistics:<br />
Block Walls 41,100 M2<br />
Claddings & Roofing 70,600 M2<br />
Finishes, Liners <strong>and</strong> 600,000 M2<br />
Protective Coatings<br />
Architectural Works<br />
<strong>Qinshan</strong> <strong>CANDU</strong> <strong>Project</strong> (2 x 728 MWe)<br />
1998 Q1<br />
1998 Q2<br />
1998 Q3<br />
1998 Q4<br />
1999 Q1<br />
1999 Q2<br />
1999 Q3<br />
1999 Q4<br />
2000 Q1<br />
2000 Q2<br />
2000 Q3<br />
2000 Q4<br />
2001 Q1<br />
2001 Q2<br />
2001 Q3<br />
2001 Q4<br />
2002 Q1<br />
2002 Q2<br />
2002 Q3<br />
Block Walls Quarterly Quantity M2 Block Walls Cumulative Quantity M2<br />
General Statistics:<br />
Large Bore Pipe 77,800 M (4,400 T)<br />
Small Bore Pipe 130,000 M (437 T)<br />
HVAC Ductwork 43,800 M2<br />
Major Mech. Equip. 2,500 Pieces<br />
Pipe & Equip. Insulation 59,800 M2<br />
Large bore piping (>2-1/2") was prefabricated<br />
<strong>and</strong> stock piled off-site <strong>and</strong> delivered on an as<br />
needed basis.<br />
Figure 10-5 Architectural Works<br />
Mechanical Works<br />
<strong>Qinshan</strong> <strong>CANDU</strong> <strong>Project</strong> (2 x 728 MWe)<br />
1998 Q1<br />
1998 Q2<br />
1998 Q3<br />
1998 Q4<br />
1999 Q1<br />
1999 Q2<br />
1999 Q3<br />
1999 Q4<br />
2000 Q1<br />
2000 Q2<br />
2000 Q3<br />
2000 Q4<br />
2001 Q1<br />
2001 Q2<br />
2001 Q3<br />
2001 Q4<br />
2002 Q1<br />
2002 Q2<br />
2002 Q3<br />
Piping Installation Quantities M \ Quarter Piping Installation Quantities Cumulative M<br />
Figure 10-6 Mechanical Works<br />
33<br />
0<br />
50,000<br />
45,000<br />
40,000<br />
35,000<br />
30,000<br />
25,000<br />
20,000<br />
15,000<br />
10,000<br />
5,000<br />
0<br />
250,000<br />
225,000<br />
200,000<br />
175,000<br />
150,000<br />
125,000<br />
100,000<br />
75,000<br />
50,000<br />
25,000