2003 February<br />

format of the SPMO <strong>Construction</strong> Quality Assurance Manual to ensure consistency among<br />

SPMO, the construction contractors <strong>and</strong> CMT.<br />

SPMO’s responsibility included the review <strong>and</strong> acceptance of the CMT’s QA Manual <strong>and</strong><br />

procedures <strong>and</strong> auditing the effectiveness of BOP construction management for the<br />

implementation of the BOP <strong>Construction</strong> Quality Assurance Program.<br />

7.1.3 Quality Assurance Audits<br />

SPMO, CMT <strong>and</strong> construction contractors carried out QA audits of their own QA programs, the<br />

Commissioning Team <strong>and</strong> the quality programs of their subcontractors <strong>and</strong> suppliers. Audits of<br />

the Commissioning Team were performed jointly with TQNPC.<br />

a) Internal QA Audits - SPMO SQA carried out QA audits to confirm that the Site <strong>Project</strong><br />

Management Organization had implemented the QA requirements specified in procedures<br />

<strong>and</strong> instructions, <strong>and</strong> that the QA Program was effective.<br />

b) External QA Audits - SPMO carried out audits of CMT, ZTPC (for one contract only) <strong>and</strong><br />

NSP construction contractors’ activities to confirm implementation <strong>and</strong> effectiveness of their<br />

QA programs, as described in their procedures <strong>and</strong> instructions.<br />

c) TQNPC QA Audits - TQNPC carried out QA audits of SPMO <strong>and</strong> CMT to verify the<br />

effectiveness of the respective QA programs. SPMO <strong>and</strong> TQNPC performed joint QA audits<br />

as much as possible, including joint audits of the Commissioning QA program.<br />

7.1.4 Records<br />

These include records required by applicable codes, st<strong>and</strong>ards, specifications, regulations <strong>and</strong><br />

TQNPC.<br />

These records are assembled <strong>and</strong> retained as History Dockets for nuclear systems <strong>and</strong> as History<br />

Files for non-nuclear systems by the construction contractors during the construction phase of the<br />

<strong>Project</strong>, by the Commissioning Team during the commissioning phase of the project <strong>and</strong> by<br />

SPMO. History Dockets <strong>and</strong> History Files are also prepared for NSP equipment <strong>and</strong> materials.<br />

These permanent records are prepared by equipment <strong>and</strong> material suppliers <strong>and</strong> then reviewed<br />

<strong>and</strong> accepted by CNPM on behalf of AECL.<br />

7.1.5 Trends<br />

Trends are analyzed on a continuous basis <strong>and</strong> reported monthly to TQNPC. Any negative trends<br />

are immediately addressed with the responsible party. Actions taken are documented in minutes<br />

of meetings, correspondence, QA Program Reviews, monthly reports <strong>and</strong> through other means<br />

such as non-conformance reports <strong>and</strong> Corrective Action Requests.<br />

7.1.6 Equipment Surveillance by TQNPC<br />

AECL is fully responsible for the manufacturing quality of the equipment, while TQNPC<br />

possesses the right of conducting equipment surveillance.<br />