Vice President and Project Director Qinshan CANDU Project AECL Manager of Quality Assurance Deputy Project Director Project Quality Assurance Manager Project Accountant Executive Secretary AECL-CNPM Site Manager Manager Project Controls Commercial Manager Director of Supply Director of NSP Engineering Canada Planning and Scheduling Hitachi/ Bechtel CNPM Subcontract Site Documentation CNPM Hitachi/Bechtel Interface Reporting Materials Management Figure 1-2 AECL Qinshan CANDU Project Organization 2003 February 4
AECL Project Quality Assurance Manager AECL Vice President and Project Director AECL-CNPM AECL Deputy Project Manager Site Quality Assurance Manager Commissioning Operations Manager Units 1 and 2 Commissioning Technical Manager Units 1 and 2 TQNPC BOP Construction Manager (CMT) Materials Management General Manager Administration General Manager NSP Construction General Manager Engineering and QS General Manager Planning and Control General Manager Figure 1-3 Site Project Management Organization 2003 February 5
- Page 1 and 2: QINSHAN CANDU PROJECT CONSTRUCTION
- Page 3 and 4: 2003 February TABLE OF CONTENTS SEC
- Page 5 and 6: 2003 February TABLE OF CONTENTS SEC
- Page 7 and 8: 2003 February design, which will ha
- Page 9 and 10: 2003 February ECGD Export Credits G
- Page 11 and 12: 2003 February 1. CONTRACT ORGANIZAT
- Page 13: Figure 1-1 AECL Overall Project Con
- Page 17 and 18: Figure 1-5 Qinshan CANDU Project -
- Page 19 and 20: 2003 February 3. LICENSING AND REGU
- Page 21 and 22: 2003 February 2) A technical suppor
- Page 23 and 24: 2003 February 4. SCHEDULES The hear
- Page 25 and 26: 2003 February Figure 5-1 Major Mile
- Page 27 and 28: 2003 February 6. DESIGN AND PROCURE
- Page 29 and 30: 2003 February format of the SPMO Co
- Page 31 and 32: 2003 February 7) Disposition of tec
- Page 33 and 34: 2003 February Steam generators (220
- Page 35 and 36: 2003 February - Accounting Manageme
- Page 37 and 38: 2003 February 9. METHOD TO SUBCONTR
- Page 39 and 40: 2003 February 10. RESOURCES AND QUA
- Page 41 and 42: 2003 February 80000 70000 60000 500
- Page 43 and 44: 2003 February 10,000 9,000 8,000 7,
- Page 45 and 46: 2003 February 11. MATERIAL MANAGEME
- Page 47 and 48: 2003 February 12.4 Accommodations E
- Page 49 and 50: 2003 February TQNPC was responsible
- Page 51 and 52: 2003 February 6. Loss of Class IV T
- Page 53 and 54: 2003 February Open item management
- Page 55 and 56: General Manager (TQNPC) Project Dir
- Page 57 and 58: 2003 February Commissioning Technic
- Page 59 and 60: 45 40 35 30 25 AECL BECHTEL M-M HIT
- Page 61 and 62: Figure 13-6 TQNPC Commissioning Tec
- Page 63 and 64: 2003 February 14. AECL STUDY: LESSO
Vice President <strong>and</strong> <strong>Project</strong> Director<br />
<strong>Qinshan</strong> <strong>CANDU</strong> <strong>Project</strong><br />
AECL Manager of<br />
Quality Assurance<br />
Deputy <strong>Project</strong> Director<br />
<strong>Project</strong> Quality<br />
Assurance Manager<br />
<strong>Project</strong> Accountant<br />
Executive Secretary<br />
AECL-CNPM<br />
Site Manager<br />
Manager<br />
<strong>Project</strong> Controls<br />
Commercial<br />
Manager<br />
Director of Supply<br />
Director of NSP<br />
Engineering<br />
Canada<br />
Planning <strong>and</strong><br />
Scheduling<br />
Hitachi/<br />
Bechtel<br />
CNPM<br />
Subcontract<br />
Site<br />
Documentation<br />
CNPM<br />
Hitachi/Bechtel<br />
Interface<br />
Reporting<br />
Materials<br />
Management<br />
Figure 1-2 AECL <strong>Qinshan</strong> <strong>CANDU</strong> <strong>Project</strong> Organization<br />