8.4.9.6 Staircase – (a) Supply, install and paint timber staircase including balustrade. 8.4.9.7 Timber door, screen door and screen window – (a) Supply, install and paint screen panel doors with frame to ground level. (b) Supply, install and paint screen panel window with partition on the lower part to the cockloft (external wall facing internal cockloft). 8.4.9.8 Wall mural on wall frieze on cockloft – (a) Touching up wall mural on wall frieze of cockloft to match original. 8.4.10 Rear Hall – Ming jian 明間 [Central Bay] 8.4.10.1 Brickwall (a) Strip off existing painting from brick surfaces on both ground level and cockloft. (b) Replacement of deteriorated bricks. (c) Rake out defective pointing and re-point joints of brickwork. 8.4.10.2 Floor finishes – (a) Supply and lay Canton floor tile (including ground level of side rooms). 8.4.10.3 Lintel – (a) Make good the carved lintel 額枋 to match original. (b) Make good the two richly decorated with figures tu-feng 駝峰 [timber decorated block pillar] to match original. (c) Make good the two queti 雀替 [sparrow brackets] to match original. 8.4.10.4 Fixtures and decorations – (a) Make good timber partition in front of the altar to match original. (b) Touching up mural on the timber partition. 245

(c) Make good timber altar to match original. (d) Touching up mural on the altar. (e) Make good the offering table in front of the altar. (f) Make good the facing brick base of the altar and top surface of the altar to match existing. 8.4.11 Rear Hall – Side Rooms 8.4.11.1 Brickwall (g) Strip off existing painting from brick surfaces on both ground level and cockloft. (h) Replacement of deteriorated bricks. (i) Rake out defective pointing and re-point joints of brickwork. 8.4.11.2 Wall mural on wall frieze – (a) Touching up wall mural on wall frieze of cockloft to match original. 8.4.12 Fengshui Wall 風水牆 at Front Courtyard – (a) Clean surfaces of all brickwork and pebble stone wall base. (b) Rake out defective pointing and re-point joints of brickwork and pebble stone. (c) Make good the coping of the wall. 8.5 Scope of Restoration Work for the Stable 8.5.1 Site Clearance 3. Cart away and dispose all debris only from interior, all artifacts shall be salvaged and not be disposed. 4. Remove all vegetation on the joints of the brickwork. 246

8.4.9.6 Staircase –<br />

(a) Supply, install and paint timber staircase including balustrade.<br />

8.4.9.7 Timber door, screen door and screen window –<br />

(a) Supply, install and paint screen panel doors with frame to ground level.<br />

(b) Supply, install and paint screen panel window with partition on the lower part to the cockl<strong>of</strong>t<br />

(external wall facing internal cockl<strong>of</strong>t).<br />

8.4.9.8 Wall mural on wall frieze on cockl<strong>of</strong>t –<br />

(a) Touching up wall mural on wall frieze <strong>of</strong> cockl<strong>of</strong>t to m<strong>at</strong>ch original.<br />

8.4.10 Rear <strong>Hall</strong> – Ming jian 明間 [Central Bay]<br />

8.4.10.1 Brickwall<br />

(a) Strip <strong>of</strong>f existing painting from brick surfaces on both ground level and cockl<strong>of</strong>t.<br />

(b) Replacement <strong>of</strong> deterior<strong>at</strong>ed bricks.<br />

(c) Rake out defective pointing and re-point joints <strong>of</strong> brickwork.<br />

8.4.10.2 Floor finishes –<br />

(a) Supply and lay Canton floor tile (including ground level <strong>of</strong> side rooms).<br />

8.4.10.3 Lintel –<br />

(a) Make good the carved lintel 額枋 to m<strong>at</strong>ch original.<br />

(b) Make good the two richly decor<strong>at</strong>ed with figures tu-feng 駝峰 [timber decor<strong>at</strong>ed block pillar]<br />

to m<strong>at</strong>ch original.<br />

(c) Make good the two queti 雀替 [sparrow brackets] to m<strong>at</strong>ch original.<br />

8.4.10.4 Fixtures and decor<strong>at</strong>ions –<br />

(a) Make good timber partition in front <strong>of</strong> the altar to m<strong>at</strong>ch original.<br />

(b) Touching up mural on the timber partition.<br />