11.01.2013 Views

VINCI - 2005 annual report

VINCI - 2005 annual report

VINCI - 2005 annual report

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Charilaos Trikoupis Bridge<br />

12,300<br />

vehicles a day<br />

EXPRESS ROAD TO THE PELOPONNESE<br />

CONCESSIONS / BUSINESS REPORT<br />

Prado-Carénage tunnel, Marseilles. Traffi c continued to grow in <strong>2005</strong>,<br />

reaching a daily average of 41,000 vehicles. On 24 November, an amendment<br />

to the contract was signed to extend the concession to the new Louis Rège<br />

tunnel, which will be built by a consortium consisting of <strong>VINCI</strong> and Eiffage.<br />

GREECE. The Charilaos Trikoupis Bridge (Rion-Antirion) was built by the Group<br />

over the Gulf of Corinth (see below). During <strong>2005</strong>, its fi rst full year of<br />

operation, average daily traffi c amounted to 12,300 vehicles, the record being<br />

set at 30,000 on Sunday 21 August. Gefyra, the concession company majorityowned<br />

by <strong>VINCI</strong> Concessions, introduced an attractive pricing policy for local<br />

users (prepaid card with a sliding scale depending on travel frequency) and<br />

heavy goods vehicles, for which competition from the ferries remains signifi cant.<br />

The reduced tariff for fi ve-axle HGVs had an immediate positive impact on traffi c.<br />

UNITED KINGDOM. In Wales, <strong>2005</strong> was also the fi rst full year of operation of<br />

the Newport Southern Distributor Road, where traffi c grew steadily throughout<br />

the period. The concession contract, part of a private fi nance initiative, is being<br />

operated by <strong>VINCI</strong> Concessions with its partner, Morgan Est. The residual term<br />

of the contract is 37 years. Operation of the Severn Crossings between England<br />

and Wales, near Cardiff, also continued satisfactorily.<br />

CHILE. <strong>VINCI</strong>, which is already operating the Chillán-Collipulli motorway,<br />

won the 30-year concession contract for the Chiloé bridge. The cost of<br />

construction is estimated at €400 million. Built in an extremely earthquakeprone<br />

area, the bridge will cross the Chacao Strait to link Chiloé Island to mainland<br />

Chile. With a total span of 2,634 metres, this will be the longest suspension<br />

bridge in South America and one of the biggest worldwide. Design studies<br />

are now under way.<br />

Built by <strong>VINCI</strong> under the terms of a 35-year concession contract and operated since 12 August 2004, the Charilaos Trikoupis<br />

Bridge between Rion and Antirion in Greece brings the journey time from the continent to the Peloponnese down to fi ve<br />

minutes instead of 45 minutes by ferry. During the year after its opening, the bridge was used mainly by cars (84%), followed by HGVs (9%),<br />

two-wheel vehicles (5%) and then coaches and buses (2%). An electronic toll system was installed in April <strong>2005</strong>.<br />

41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!