11.01.2013 Views

Source: Bulgartransgas EAD - DVGW

Source: Bulgartransgas EAD - DVGW

Source: Bulgartransgas EAD - DVGW

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Lessons from the Crisis<br />

Lessons from the crisis caused by the suspended natural gas supplies through Ukraine.<br />

It is necessary:<br />

To speed up the introduction of the European regulatory framework into the<br />

Bulgarian energy sector;<br />

Designing and construction of closed gas pipeline networks<br />

with an option for reversible running.<br />

To implement the energy strategy projects:<br />

- South Stream<br />

- NABUCCO<br />

- Construction of an LNG re-gasification terminal;<br />

- Upgrading and expanding the Chiren UGS;<br />

- Building new gas storage facilities (Galata and others);<br />

- Building inter-system gas pipeline connections with<br />

the networks of Greece (Komotini- Dimitrovgrad)<br />

and Romania (Ruse-Gyurgevo).<br />

<strong>Source</strong>: <strong>Bulgartransgas</strong> <strong>EAD</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!