Annex C4 – Water Resources Supplemental Information C4 - 32<br />

� Golder Associates (2004b) tested 12 piezometers in the proposed mine pit area.<br />

These piezometers are completed in each of the major units – saprolite, saprock,<br />

and bedrock. Falling head tests were performed in nine of these piezometers with a<br />

geometric mean hydraulic conductivity of 7 x 10 -7 metres per second (m/sec) for<br />

saprolite and saprock, and 6 x 10 -7 m/sec for bedrock. The hydraulic conductivity<br />

measured in fractured intervals of the upper bedrock unit was 5 x 10 -6 m/sec. In<br />

addition, Golder Associates (2004b) performed packer tests in four boreholes in the<br />

fault shear zone, with a geometric mean hydraulic conductivity of 3 x 10 -7 m/sec.<br />

Well yields for the tests were up to 80 litres per minute (l/min).<br />

� SGS (2005) tested 10 monitoring wells throughout the Project Area. These wells<br />

are completed in greywacke and schist saprock with depths ranging from 24 to 61 m.<br />

Results of SGS (2005) aquifer tests for the 10 monitoring wells indicate hydraulic<br />

conductivity is in the range of 2 x 10 -4 to 9 x 10 -7 m/sec. Average hydraulic<br />

conductivity for the 10 wells is 2 x 10 -5 m/sec. Well yields for the test were from<br />

about 50 to 500 l/min.<br />

� Golder Associates (2006) tested two deep pumping wells: KPW-1 (200 m depth) and<br />

KPW-2 (150 m depth), both located in the proposed mine pit area. Range in<br />

hydraulic conductivities from testing these two wells was 1 x 10 -6 to 2 x 10 -9 m/sec.<br />

Falling head tests performed on four additional bedrock piezometers had a<br />

geometric mean hydraulic conductivity of 9 x 10 -7 m/sec. Air lift water yield from<br />

these tests ranged 4 to 18 l/min.<br />

� Knight Piesold (2006) tested eight production/test wells in the Project Area.<br />

Hydraulic conductivity values are from 8 x 10 -5 to 4 x 10 -6 m/sec. Sustained yields<br />

during the tests were in the range of 18 to 360 l/min.<br />

The graph in Figure C4-13 shows average hydraulic conductivity for all tests conducted in<br />

the following lithologic units (from upper to lower depths):<br />

� Saprolite: 4.5 x 10 -7 m/sec<br />

� Saprolite/Saprock: 4.7 x 10 -7 m/sec<br />

� Saprock: 2.4 x 10 -5 m/sec<br />

� Bedrock: 3.5 x 10 -6 m/sec<br />

� Graphite Shear Zone: 1.5 x 10 -7 to 3.6 x 10 -7 m/sec<br />

Akyem Gold <strong>Mining</strong> Project November 2008 FINAL EIS