10.01.2013 Views

unclassified

unclassified

unclassified

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CLASSIFICATION: UNCLASSIFIED May-2002<br />

P3A (Continued) INDIVIDUAL MODIFICATION (Continued)<br />

MODELS OF SYSTEMS AFFECTED: OA 9070 A/B UPGRADE MODIFICATION TITLE: SSN ACOUSTICS<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: SHIP ALT<br />

ADMINISTRATIVE LEADTIME: 24 MOS PRODUCTION LEADTIME: 6 - 8 Months<br />

CONTRACT DATES: FY 2002: 2/02 FY 2003: 2/03 FY 2004: 2/04 FY 2005: 2/05<br />

DELIVERY DATE: FY 2002: 10/02 FY 2003: 10/03 FY 2004: 10/04 FY 2005: 10/05<br />

($ in Millions)<br />

Cost: FY 2001 & Prior FY2002 FY 2003 FY2004 FY2005 FY2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS 10 17.085 5 7.905 15 24.990<br />

FY 2002 EQUIPMENT 7 9.613 7 9.613<br />

FY 2003 EQUIPMENT 5 9.924 5 9.924<br />

FY 2004 EQUIPMENT 3 5.955 2 4.734 5 10.689<br />

FY 2005 EQUIPMENT 1 2.530 1 2.530<br />

FY 2006 EQUIPMENT 0 0.000<br />

FY 2007 EQUIPMENT 0 0.000<br />

FY 2008 EQUIPMENT<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

0 0.000<br />

INSTALLATION SCHEDULE:<br />

FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 TC<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TOTAL<br />

In 10 3 1 2 0 2 3 2 0 2 1 1 1 3 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 33<br />

Out 10 3 1 2 0 2 3 2 0 2 1 1 1 3 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 33<br />

NOTE: DUE TO THE 1 OCTOBER 2004 AVAILABILITY FOR 3 SHIPS THEIR INSTALLATION IS FUNDED WITH FY04 FUNDS.<br />

P-3A<br />

ITEM NO. 33 PAGE 48 CLASSIFICATION: UNCLASSIFIED

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!