10.01.2013 Views

unclassified

unclassified

unclassified

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR112<br />

MODELS OF SYSTEMS AFFECTED: Comm. Satellite--INMARSAT B (Ship) Equip. Upgrade - 128Kbps Wideband<br />

DESCRIPTION/JUSTIFICATION: Provides increased bandwidth (upto 128kbps) to the existing INMARSAT B (64 kbps) hardware<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 20 0.6 80 2.3 86 2.5 186 5.4<br />

Equipment Nonrecurring 0.3 0 0.3<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support 0.0 1.7 1.7 3.4<br />

Other (DSA) 0.0<br />

Interim Contractor Support<br />

Installation of Hardware* 0 0.0 0 0.0 8 0.3 84 1.7 92 1.8 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 184 3.8<br />

PRIOR YR EQUIP 0 0.0<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 8 0.3 10 0.2 18 0.5<br />

FY 04 EQUIP 74 1.5 6 0.1 80 1.6<br />

FY 05 EQUIP 86 1.7 86 1.7<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0.0 0 0.0<br />

TOTAL INSTALLATION COST 0.0 0.0 0.3 1.7 1.8 0.0 0.0 0.0 0.0 0.0 3.8<br />

TOTAL PROCUREMENT 0.0 0.0 1.2 5.7 6.0 0.0 0.0 0.0 0.0 0.0 13.0<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 3 Months PRODUCTION LEAD-TIME: 3 Months<br />

CONTRACT DATES: FY 2003: Mar-03 FY 2004: Nov-03 FY 2005: Nov-04 FY 2006: NA<br />

DELIVERY DATES: FY 2003: Jun-03 FY 2004: Feb-04 FY 2005: Feb-05 FY 2006: NA<br />

FY04 FY05 FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 8 16 38 30 6 28 29 29<br />

OUTPUT 0 24 18 25 25 6 28 29 29<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 184<br />

OUTPUT 184<br />

Notes/Comments<br />

FY03 includes $300K NRE<br />

FY03 - 2 units are test terminals. No install required.<br />

FY07<br />

FY08<br />

P-1 Shopping List - Item No 80 - 40 of 54<br />

FY 09<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />

Classification

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!