UNCLASSIFIED<br />

MODIFICATION TITLE: Satellite Communications Systems 321500<br />

COST CODE NR107<br />

MODELS OF SYSTEMS AFFECTED: EHF Terminals--MDR Appliques - Ship<br />

DESCRIPTION/JUSTIFICATION: Provides for Applique and Antenna upgrades to the existing AN/USC-38 Low Data Rate (LDR) terminal to enable Medium Data Rate (MDR) communications capability.<br />

February, 2004<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment 61 27.1 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 61 27.1<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

Production Support<br />

Other (DSA) 2.9 0.1 0.1 3.1<br />

Other 8.4 0.2 0.1 8.7<br />

Interim Contractor Support<br />

Installation of Hardware* 45 12.3 2 0.9 1 0.8 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 48 14.1<br />

PRIOR YR EQUIP 45 12.3 2 0.9 1 0.8 48 14.1<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 0 0.0<br />

FY 04 EQUIP 0 0.0<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 12.3 0.9 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 14.1<br />

TOTAL PROCUREMENT 50.8 1.2 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 52.9<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: PRODUCTION LEAD-TIME: 15 Months<br />

CONTRACT DATES: FY 2003: NA FY 2004: NA FY 2005: NA FY 2006: NA<br />

DELIVERY DATES: FY 2003: NA FY 2004: NA FY 2005: NA FY 2003: NA<br />

FY04 FY05 FY06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 48<br />

OUTPUT 48<br />

INSTALLATION SCHEDULE:<br />

INPUT<br />

OUTPUT<br />

Notes/Comments<br />

MDR Applique installation plan reflects ten (10) transferred to shore and installed in PY. Three tests assets required no install.<br />

MDR Functionality incorporated in to AN/USC-38(V) Terminal.<br />

FY07<br />

FY08<br />

1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

P-1 Shopping List - Item No 80 - 37 of 54<br />

FY 09<br />

0 48<br />

0 48<br />

Exhibit P-3a, Individual Modification<br />

Justification<br />

Unclassified<br />