UNCLASSIFIED<br />

MODIFICATION TITLE: SCI Networks (Afloat)<br />

COST CODE PQ068<br />

MODELS OF SYSTEMS AFFECTED: SCI Networks Build Two & Three / Carry On Build Two (AFLOAT)<br />

DESCRIPTION/JUSTIFICATION: Provides Shipboard reception and transmission of multi-functional data using various data networks linking battlegroup commanders with intelligence databases.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

PY FY 02 FY 03 FY 04 FY 05<br />

FY 06 FY 07<br />

FY 08 FY 09<br />

TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

87 3.917 52 6.563 7 2.182 8 0.351 7 2.941 7 2.942 7 2.860 7 2.910 Cont. Cont. 285 36.6<br />

Data<br />

Training Equipment<br />

See Note 1<br />

Production Support 1.198 0.391 0.104 0.028 0.145 0.147 0.143 0.148 Cont. 2.789<br />

Other (DSA)<br />

Interm Contractor Support<br />

0.319 0.115 0.042 0.000 0.119 0.126 0.133 0.126 Cont. 2.814<br />

Installation of Hardware* 78 2.445 60 5.657 14 1595 8 0.225 7 0.980 7 0.994 7 1.001 7 1.008 Cont. Cont. 254 17.0<br />

PRIOR YR EQUIP 66 5.1<br />

FY 00 EQUIP 0 0.0<br />

FY 01 EQUIP 6 0.188 6 0.2<br />

FY 02 EQUIP 72 2.257 15 1.010 87 3.3<br />

FY 03 EQUIP 45 4.647 7 0.797 52 5.4<br />

FY 04 EQUIP 7 0.798 7 0.8<br />

FY 05 EQUIP 8 0.225 8 0.2<br />

FY 06 EQUIP 7 0.980 7 1.0<br />

FY 07 EQUIP 7 0.994 7 1.0<br />

FY 08 EQUIP 7 1.001 7 1.0<br />

FY 09 EQUIP 7 1.008 7 1.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 2.445 5.657 1.595 0.225 0.980 0.994 1.001 1.008 Cont. 254 19.0<br />

TOTAL PROCUREMENT 7.879 12.726 3.923 0.604 4.185 4.209 4.137 4.192 Cont. 59.2<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: 1 Month PRODUCTION LEADTIME: 3 Months<br />

CONTRACT DATES: FY 2003: Dec-02 FY2004: Dec-03 FY2005: Dec-04<br />

DELIVERY DATES: FY 2003: Mar-03 FY2004: Mar-04 FY2005: Mar-05<br />

FY 04 FY 05 FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 211 4 3 0 4 4 3 2 2<br />

OUTPUT 204 7 4 3 0 4 4 3 2<br />

FY 07<br />

FY 08 FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 3 2 2 3 2 2 3 2 2 Cont. 254<br />

OUTPUT 2 3 2 2 3 2 2 3 4 Cont. 254<br />

Notes/Comments<br />

1/ SCI ADNS has a carry-on variant that requires no installation. Therefore, the variation between the number of procurements vs. the number of installations.<br />

(FY00 = 24, FY01 = 7, fully funded Carry-on's for a total of 31, which is the difference between P & I qtys on this page)<br />

2/ Total Quantity listed on this P-3A represent systems procured and installed, including refresh equipment, and is not an Inventory Objective. Program Continues Beyond FYDP.<br />

3/ Quantity listed for FY02-06 includes Security Backfits required per ONI.<br />

P-1 SHOPPING LIST P-3A Exhibit<br />

ITEM NO.<br />

76<br />

9 of 22<br />

February 2004