CLASSIFICATION: UNCLASSIFIED<br />

P3A (Continued)<br />

MODELS OF SYSTEMS AFFECTED: CVs, CVNs, LHDs, LHAs, and selected MODIFICATION TITLE: AN/TPX-42A(V)14 Upgrade A Kit (MP044)<br />

shore sites.<br />

INSTALLATION INFORMATION:<br />

METHOD OF IMPLEMENTATION: AIT<br />

ADMINISTRATIVE LEADTIME: 2 Months PRODUCTION LEADTIME: 10 Months<br />

CONTRACT DATES: FY 2003: 12/02 FY 2004: 12/03 FY 2005: 12/04<br />

DELIVERY DATE: FY 2003: 10/03 FY 2004: 10/04 FY 2005: 10/05<br />

Cost: Prior Years FY 2003 FY 2004 FY 2005<br />

($ in Millions)<br />

FY 2006 FY 2007 FY 2008 FY 2009 To Complete Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

PRIOR YEARS<br />

FY 2003 EQUIPMENT AP 0.065<br />

2 0.667 2 0.732<br />

FY 2004 EQUIPMENT AP 0.065 1 0.703 1 0.648 2 1.416<br />

FY 2005 EQUIPMENT AP 0.067 1 0.660 1 0.727<br />

FY 2006 EQUIPMENT AP 0.066 1 0.659 1 0.725<br />

FY 2007 EQUIPMENT AP 0.069 1 0.224 1 0.293<br />

FY 2008 EQUIPMENT<br />

FY 2009 EQUIPMENT<br />

TO COMPLETE<br />

AP 0.069 1 0.224 1 0.227 2 0.520<br />

INSTALLATION SCHEDULE:<br />

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 TC TOTAL<br />

& Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4<br />

In 0 0 0 0 0 1 1 0 0 1 1 0 0 1 0 0 0 1 0 0 0 1 0 0 0 1 1 0 0 0 9<br />

Out 0 0 0 0 0 0 0 1 1 1 0 0 0 1 0 0 0 1 0 0 1 0 0 0 0 1 0 1 0 1 9<br />

*NOTE: The system integrator, NAWCAD, has reduced total lead time to 12 months for all builds. This has been achieved by aggressively pursuing learning curve improvements.<br />

Exhibit P-3A (Individual Modification)<br />

ITEM NO. 58 PAGE NO. 5E CLASSIFICATION: UNCLASSIFIED