10.01.2013 Views

unclassified

unclassified

unclassified

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

UNCLASSIFIED<br />

MODIFICATION TITLE: NAVSTAR Global Positioning System (GPS) (521R) NAVSSI Schools February 2004<br />

COST CODE 1R009<br />

MODELS OF SYSTEMS AFFECTED: All models of ships will have NAVSTAR GPS<br />

DESCRIPTION/JUSTIFICATION: The NAVSTAR Global Positioning System (GPS) is a joint Service Program which will provide advance satellite positioning. The ultimate system will consist of a constellation<br />

of satellites, control/tracking network, and user equipment installed aboard a variety of airborne, shipborne and land-based platforms.<br />

With the advent of Over the Horizon - Targeting (OTH-T), it is imperative that all ships continuously know their geographic position to correlate sensor data and prevent escort<br />

ships from becoming unwilling targets. To meet this need, the Navigation Sensor System Interface (NAVSSI) program was initiated. NAVSSI will<br />

distribute position, velocity, time and almanac data to onboard command and control and combat systems in real time with GPS as the primary source of navigation data.<br />

DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES:<br />

FINANCIAL PLAN: ($ in millions)<br />

Prior Yrs FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TC Total<br />

Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $ Qty $<br />

RDT&E<br />

PROCUREMENT:<br />

Kit Quantity<br />

Installation Kits<br />

Installation Kits Nonrecurring<br />

Equipment<br />

Equipment Nonrecurring<br />

Engineering Change Orders<br />

Data<br />

Training Equipment<br />

3 0.8 3 0.8 6 1.6<br />

Production Support 0.0<br />

Other (DSA)<br />

Interim Contractor Support<br />

0.0<br />

Installation of Hardware 0 0.0 3 0.1 3 0.3 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 6 0.4<br />

PRIOR YR EQUIP 0 0.0<br />

FY 01 EQUIP 0 0.0<br />

FY 02 EQUIP 0 0.0<br />

FY 03 EQUIP 3 0.1 3 0.1<br />

FY 04 EQUIP 3 0.3 3 0.3<br />

FY 05 EQUIP 0 0.0<br />

FY 06 EQUIP 0 0.0<br />

FY 07 EQUIP 0 0.0<br />

FY 08 EQUIP 0 0.0<br />

FY 09 EQUIP 0 0.0<br />

FY TC EQUIP 0 0.0<br />

TOTAL INSTALLATION COST 0.0 0.0 0.1 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.4<br />

TOTAL PROCUREMENT COST 0.0 0.0 0.9 1.1 0.0 0.0 0.0 0.0 0.0 0.0 2.0<br />

METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEAD-TIME: 1 PRODUCTION LEAD-TIME: 4<br />

CONTRACT DATES: FY 2003: Nov-02 FY 2004: Nov-03 FY 2005:<br />

DELIVERY DATES: FY 2003: Mar-03 FY 2004: Mar-04 FY 2005:<br />

FY 04 FY 05<br />

FY 06<br />

INSTALLATION SCHEDULE: PY 1 2 3 4 1 2 3 4 1 2 3 4<br />

INPUT 3 0 1 2 0 0 0 0 0 0 0 0 0<br />

OUTPUT 3 0 1 2 0 0 0 0 0 0 0 0 0<br />

FY 07 FY 08<br />

FY 09<br />

INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 1 2 3 4 TC TOTAL<br />

INPUT 0 0 0 0 0 0 0 0 0 0 0 0 0 6<br />

OUTPUT 0 0 0 0 0 0 0 0 0 0 0 0 0 6<br />

Notes/Comments<br />

P-1 Shopping List-Item No 52 (7 of 11)<br />

Exhibit P-3a, Individual Modification Progr<br />

Unclassifi<br />

Classificatio

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!