FINANCIAL MANAGEMENT POLICY MANUAL

FINANCIAL MANAGEMENT POLICY MANUAL

FINANCIAL MANAGEMENT POLICY MANUAL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3. SCOPE OF SCN FUNDING<br />

a. Ship Equipment.<br />

An item will not be budgeted in the SCN appropriation if delivery of<br />

the item is scheduled to occur after ship delivery. Additionally, no<br />

items will be added to the SCN ship equipment list, if at the time of<br />

procurement, the item is scheduled to be delivered after ship delivery.<br />

All items scheduled to be delivered after ship delivery will be<br />

budgeted in the applicable Procurement or Operation and Maintenance<br />

appropriation. SCN will fund the installation of those items planned<br />

for installation prior to ship delivery but whose actual delivery slips<br />

into the ship post delivery period.<br />

b. Concurrent Funding.<br />

During the period from ship delivery to the SCN obligation/work<br />

limiting date for the ship, concurrent periods of availabilities (Post<br />

Shakedown Availability (PSA), Industrial Maintenance Availability<br />

(IMAV), Restricted Availability (RAV)) may be scheduled to<br />

accomplish post delivery work in the most cost effective manner. The<br />

overall obligation/work limiting date for SCN funding is 11 months<br />

following completion of fitting out (CFO) of the ship. During such<br />

periods, concurrent obligation and expenditure of SCN, Weapons<br />

Procurement, Other Procurement, and Operation and Maintenance<br />

(O&M) appropriations for appropriate categories of work may be<br />

made, provided that separate accounting of funds is maintained.<br />

4. SCOPE OF O&MN FUNDING.<br />

The authority to use O&MN funding after the end of the fiscal year for<br />

ship maintenance availabilities is contained in Title 10, United States<br />

Code Section 7313. This authority applies exclusively to major ship depot<br />

availabilities funded in the Ship Overhaul budget line items, including<br />

regular and complex ship overhauls, refueling overhauls for nuclear<br />

powered submarines, and depot modernization periods.<br />

a. Unusual Cost Overruns.<br />

Note the following:<br />

(1) applicable operations and maintenance appropriations<br />

available to the Department of the Navy for a fiscal year may be<br />

used for payment of unusual cost overruns incident to ship<br />

overhaul, maintenance, and repair for a vessel inducted into a<br />

NWCF activity or contracted for during a prior fiscal year;<br />

(2) the Secretary of Defense shall notify Congress promptly<br />

before an obligation is incurred for any payment under item 1.<br />

Financial Management Policy<br />

3-167