075363 MAJOR EQUIPMENT OR COMPONENT<br />

1. SCOPE.<br />

This paragraph provides requirements guidance and budget policy for<br />

procurements of major spare equipment or system components required<br />

for expeditious replacement in the event of major damage from battle, fire,<br />

collision, explosion, storm, etc. These major equipment and components<br />

are principle items as opposed to secondary item spares and repair parts<br />

generated by the equipment provisioning process.<br />

2. REQUIREMENTS.<br />

Generally, spare equipment or system components will be acquired only if<br />

the equipment provisioning process will not provide all secondary items<br />

necessary to assemble a complete equipment or system component, and<br />

the nonavailability of the spare for replacement will seriously degrade the<br />

capability of a combatant unit to prosecute the missions for which<br />

designed. As a general rule, one spare will be acquired when 50 or less<br />

equipment installations are planned and two spares will be acquired when<br />

more than 50 installations are planned. However, actual spare quantities<br />

of a specific equipment or system component will be approved by the<br />

Chief of Naval Operations and the Commandant of the Marine Corps, as<br />

applicable.<br />

3. BUDGET <strong>POLICY</strong>.<br />

Spare equipment or system components will be budgeted in the same<br />

procurement appropriation in which the equipment or system is normally<br />

budgeted. However, the Shipbuilding and Conversion, Navy (SCN)<br />

appropriation will only budget spare equipment or components for those<br />

equipments and systems included in a shipbuilding program for the first<br />

time. Replacement spares and spares for equipment included in a previous<br />

shipbuilding program will not be budgeted in the SCN appropriation.<br />

(Change 48)<br />

075364 INITIAL OUTFITTING<br />

1. SCOPE.<br />

This paragraph provides funding policy for the initial outfitting of<br />

investment end-items such as ships, aircraft, vehicles, or other weapons<br />

and equipment. However, this guidance is not applicable to Research,<br />

Development, Test and Evaluation activities or end-items.<br />

2. <strong>POLICY</strong>.<br />

Initial outfitting is the complement of support items required to make a<br />

newly deployed end-item complete and ready to operate. Allowance list<br />

changes for operating end-items are also considered initial outfitting. As<br />

Financial Management Policy<br />

3-149

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!