10.01.2013 Views

FINANCIAL MANAGEMENT POLICY MANUAL

FINANCIAL MANAGEMENT POLICY MANUAL

FINANCIAL MANAGEMENT POLICY MANUAL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

. Equipment Installation.<br />

The term "equipment installation" costs as used herein includes items<br />

described in the Facilities Projects Manual as "construction" in par.<br />

3112 and "nonconstruction" in par. 6105.<br />

3. BUDGET <strong>POLICY</strong><br />

a. Appropriation Purchases Account Cognizance Symbol Manager.<br />

A systems command that is the Appropriation Purchases Account<br />

(APA) cognizance symbol manager, or other organization responsible<br />

for funding servicewide procurement of specific items, funds<br />

equipment installation costs. When equipment installation is complete<br />

and reported in the plant property inventory, the station assumes<br />

responsibility for the operation and maintenance support, such as<br />

power, repair parts, etc., for the equipment. Specific examples of this<br />

responsibility include:<br />

(1) when the equipment is procured for installation at a specific<br />

activity (i.e., at the time of budget formulation the equipment is<br />

programmed for installation at a specific location and is so<br />

justified, even though practical consideration may later change<br />

priorities and require installation at a different activity when the<br />

equipment actually becomes available);<br />

(2) when the requesting organization has provided the requirement<br />

for procurement/installation to the appropriate APA cognizance<br />

symbol item manager or other authority responsible for funding<br />

servicewide procurement in adequate time for budgeting (i.e.,<br />

prior to 1 Sept., 13 months prior to execution of the budget, in<br />

order that the full requirement may be included in the budget<br />

formulation process);<br />

(3) when technical direction/system direction exercised by a<br />

systems command or other authority responsible for funding<br />

servicewide procurement or sponsoring development requires that<br />

equipment be installed as a result of technical field inspections,<br />

revised standards, or central systems development/configuration<br />

requirements;<br />

(4) when system development responsibility is exercised by a<br />

systems command or other authority responsible for servicewide<br />

development and the responsibility requires that leased equipment<br />

be installed as a result of the system design or development,<br />

notwithstanding that the central manager or the user is responsible<br />

for funding subsequent lease costs.<br />

Financial Management Policy<br />

3-145

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!