2. STANDARD DEFINITIONS.<br />

Standard definitions have been developed for initial, replenishment, and<br />

war reserve spare parts to ensure consistency in systems spare parts<br />

pricing for budgeting and Selected Acquisition Reports (SARS). The<br />

following applies:<br />

a. Initial Spare Parts.<br />

Initial spare parts will include those repairable components,<br />

assemblies, or subassemblies required as initial stockage at all levels<br />

including the pipeline in support of newly fielded end-items. Whole<br />

spare engines are covered by separate guidance and will be classified<br />

as initial spare parts through the life of the system.<br />

b. Replenishment Spare Parts.<br />

Replenishment spare parts will include those repairable components,<br />

assemblies, or subassemblies required to resupply initial stockage or<br />

increase stockage for reason other than support of newly fielded end<br />

items. Replenishment would include additional stockage due to<br />

increases in usage, readiness initiatives, and redeployment of enditems.<br />

c. War Reserve Spare Parts.<br />

War reserve spare parts will be budgeted as replenishment.<br />

(Change 59)<br />

075342 PRODUCTION SUPPORT SERVICES<br />

1. GENERAL.<br />

Standard terminology and a cost breakdown structure have been<br />

developed to categorize and display production support service costs in the<br />

Procurement appropriation budget backup exhibits. It is not necessary to<br />

utilize each element of the standard cost breakdown structure in every P-1<br />

line item. Rather, the standard cost elements should be utilized in the<br />

budget backup exhibits as necessary when production support services are<br />

separately identified in a P-1 line item. Production support services are<br />

not required to be separately identified, but when they are, the standard<br />

cost elements should be utilized in lieu of other terminology.<br />

2. STANDARD COST BREAKDOWN.<br />

The standard cost breakdown structure consists of Production<br />

Engineering, Quality Assurance, Product Improvement, Acceptance Test<br />

and Evaluation, Contractor Engineering and Technical Services (CETS).<br />

These cost elements may be utilized under both the "Flyaway Cost" and<br />

"Support Cost" section in the budgets exhibits when these major cost areas<br />

are segregated (usually for major weapon systems). However, CETS can<br />

Financial Management Policy<br />

3-141