programs until amortized. When programs are reduced to the extent that<br />

advance procurement contract supports a quantity that exceeds the<br />

approved FYDP, the guidance in item 1. applies for that effort applicable<br />

to the excess quantities, e.g. partial termination, contract modification,<br />

etc.<br />

Obligations and expenditures of a termination liability advance procurement<br />

contract may not be decreased below costs incurred once recorded. In those<br />

instances where administrative procedure provides for an advance<br />

procurement contract to be redefined into the end-item contract awarded in the<br />

subsequent fiscal year, no decrease below costs incurred will be made to the<br />

total obligation recorded in the advance procurement fiscal year at the point of<br />

definition into the end-item contract or later in the acquisition process. In<br />

those instances where the end-item quantity is adjusted from that anticipated<br />

and contracted in the advance procurement instrument, the advance<br />

procurement instrument will remain the document of record without decrease<br />

other than termination in whole or part.<br />

(Change 59)<br />

075328 APPROVAL FOR PRODUCTION<br />

Department of the Navy (DON) system acquisition policy requires that the<br />

appropriate decision authority grant production approval before a system<br />

enters production. Accordingly, it is the policy of the DON to budget initial<br />

production funding for weapons systems and other equipment if approval for<br />

limited or full production can be reasonably expected to be provided in time to<br />

allow full program execution during the fiscal year for which funds are<br />

requested. Additional explanatory guidance is contained in the Budget<br />

Guidance Manual.<br />

(Change 50)<br />

075340 SCOPE<br />

Section III:<br />

SYSTEMS COSTS<br />

Standard terminology for Department of Defense systems acquisition is<br />

required for uniform presentation of requirements in the budgeting and<br />

reporting processes. This section outlines the costs to be included in<br />

procurement appropriation budget line items.<br />

(Change 48)<br />