furnished material, and related labor for government- responsible<br />

defects and deficiencies identified during builders trials,<br />

acceptance trials, and testing during the post delivery period. Post<br />

delivery includes all work required to correct defects or<br />

deficiencies identified during the post delivery period. Post<br />

delivery also includes all work required to correct trial card<br />

deficiencies on a ship of a particular class, as well as on<br />

subsequent ships of that class (whether or not delivered) until the<br />

corrective action for that ship class is completed.<br />

(Change 66)<br />

075324 ADVANCE PROCUREMENT OF LONG LEAD-<br />

TIME ITEMS<br />

1. GENERAL.<br />

The following guidance pertains to procurement programs. Under specific<br />

limited conditions, long lead-time items may be budgeted in advance of<br />

the fiscal year in which the end-item is budgeted. Long lead-time<br />

procurement shall be for components, parts, material or effort of the same<br />

end-item that must be funded in an advance procurement timeframe in<br />

order to maintain a planned production schedule. Advance procurement<br />

requests for long lead-time items shall be limited to the major procurement<br />

appropriations and shall be for those elements of the end-item whose leadtimes<br />

are significantly longer than other elements of the same end-item.<br />

The cost of elements categorized as long lead-time should be a relatively<br />

low percentage of the cost of the end-item. Also, proposals for advance<br />

procurement funding should take full consideration of the applicability of<br />

the items to other programs or as spares in the event that the prospective<br />

program fails to materialize. All advance procurement requests must be<br />

specifically identified in the budget and apportionment submissions.<br />

2. BUDGETING.<br />

Advance procurement will be budgeted only one year in advance of the<br />

end-item funding year. This applies to major weapons systems unable to<br />

deliver within 24 months of authorization, or to protect reorder lead-time.<br />

Nonrecurring costs may be budgeted as advance procurement only in the<br />

first advance procurement year. Exceptions to allow more than one year<br />

of advance procurement will be approved on a case-by-case basis in the<br />

budget review process. Typical exceptions to this policy are advance<br />

economic order quantity (EOQ) procurements associated with multiyear<br />

contracts (discussed below) and exceptionally long lead-time materials,<br />

such as nuclear cores, associated with the shipbuilding program. The<br />

preferred funding method is to budget the full cost of advance<br />

procurement items which would have utility if the subsequent end-item<br />

was not procured. At a minimum, termination liability will be funded for<br />

the items for which the advance procurement request is being made.<br />