10.01.2013 Views

FINANCIAL MANAGEMENT POLICY MANUAL

FINANCIAL MANAGEMENT POLICY MANUAL

FINANCIAL MANAGEMENT POLICY MANUAL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(Change 48)<br />

(b) as an overhead cost of the applicable production cost center at<br />

industrial-commercial activities.<br />

075210 GENERAL SERVICES ADMINISTRATION<br />

1. GENERAL. Pursuant to the provisions of Public Law 92-313, all Federal<br />

agencies are subject to standard level user charges for space, services, and<br />

facilities provided by the General Services Administration (GSA) in both<br />

Government-owned and leased space. The rates for these charges are<br />

approximately equivalent to commercial charges for comparable space and<br />

services. In addition, services above the level included in the standard level<br />

user charges that are furnished by the GSA are billed directly to the ordering<br />

activity.<br />

2. BUDGETING<br />

a. General. All the estimated cost of payments to the GSA Federal<br />

Buildings Fund for space occupied by elements of Navy, both within and<br />

outside the National Capital Region (NCR), including the Department of<br />

the Navy (DON) Secretariat and Staff Offices, should be funded within<br />

the operating appropriation of the affected activity which holds the lease.<br />

While O&M funded activities have their leased space centrally managed<br />

and budgeted, activities funded with other appropriations are centrally<br />

managed, but not centrally budgeted. Activities which are industrially<br />

funded, RDT&E,N funded, or Foreign Military Sales (FMS) funded will<br />

make lease payments from their respective appropriations. In addition,<br />

activities funded in the reserve O&M appropriations should make lease<br />

payments from these appropriations.<br />

b. Budget Preparation. The Chief of Naval Operations (CNO) through his<br />

designated agent prepares appropriate budget backup exhibits on total<br />

Navy requirements to be reflected in the various phases of budget<br />

formulation and execution review. These exhibits combine NCR space<br />

data obtained from the Administrative Officer, Department of the Navy<br />

and data on Navy space occupancy outside the NCR obtained from GSA<br />

as transmitted to the DON by the Assistant Secretary of Defense (Force<br />

Management and Personnel). The Commandant of the Marine Corps<br />

(CMC) similarly prepares appropriate budget backup exhibits based on<br />

NCR space occupancy outside the NCR that is obtained from CNO or his<br />

designated agent.<br />

3. CERTIFICATION AND PAYMENT OF BILLS<br />

a. Procedure. The DON receives a single billing from the Under<br />

Secretary of Defense (Comptroller) (USD (C)) for space assigned to the<br />

DON within the NCR, and another billing from GSA for all space<br />

assigned to the DON outside the NCR.<br />

Financial Management Policy<br />

3-106

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!