10.01.2013 Views

FINANCIAL MANAGEMENT POLICY MANUAL

FINANCIAL MANAGEMENT POLICY MANUAL

FINANCIAL MANAGEMENT POLICY MANUAL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

074603 <strong>FINANCIAL</strong> <strong>POLICY</strong><br />

1. GENERAL.<br />

The Department of the Navy operates NWCF activities in accordance with<br />

the financial policies and procedures contained in the DOD 7000.14-R,<br />

Financial Management Regulation, and those established by the DWCF<br />

Policy Board.<br />

2. MOBILIZATION/SURGE COSTS AND WAR RESERVE MATERIAL.<br />

Mobilization capability costs include the cost to maintain a surge capacity<br />

to procure and maintain approved war reserve material levels, and/or to<br />

maintain other assets, functions or capabilities required to meet an<br />

operational contingency, as documented in Defense Planning Guidance or<br />

operational plans.<br />

a. Unutilized Plant Capacity (UPC) represents costs associated with<br />

maintaining facilities to meet necessary surge capacity due to<br />

mobilization or war. The cost to maintain this capacity is budgeted in<br />

the O&M accounts. UPC costs are not to be included in the DWCF<br />

rate structure.<br />

b. War reserve material purchases are funded through a direct<br />

appropriation to the NWCF or after notification to Congress.<br />

Appropriated amounts for such secondary items are to be reflected as a<br />

separate goal within the Supply Management Business Area Annual<br />

Operating Budget.<br />

3. MILITARY PERSONNEL COSTS.<br />

The cost of military personnel assigned to NWCF activities will be<br />

included in the total cost of operations of NWCF activities at civilian<br />

equivalent rates and reflected in the stabilized rates charged to customers.<br />

This policy is based on the concept of total costing, which is designed to<br />

ensure that the total cost of producing products and services is being<br />

identified to both NWCF activities and customers. The amount expensed<br />

for military personnel by NWCF activities and the amount reimbursed to<br />

the appropriate military personnel appropriation will be the same as the<br />

amount budgeted. The budget amount will equal the average strength,<br />

calculated based on the average fill rate for the three prior years,<br />

multiplied by the civilian equivalency rate for each grade. No adjustments<br />

will be made to the NWCF cost of operations to reflect the actual cost of<br />

military personnel employed by NWCF activities.<br />

4. DEPRECIATION/AMORTIZATION COSTS FOR CAPITAL ASSETS.<br />

All capital assets owned by activities in the NWCF will be capitalized and<br />

depreciated or amortized by the individual business area. Additional<br />

guidance regarding the treatment of capital assets is provided in DOD<br />

Financial Management Policy<br />

2-109

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!