submission of the appropriation request for the Military Construction<br />

Reserve Program to the Office of Budget (FMB) for Departmental budget<br />

review. Requests to the Office of the Under Secretary of Defense<br />

(Comptroller) (OUSD (C)) for apportionment action for MCNR are<br />

prepared by the Commander, Naval Facilities Engineering Command<br />

(NAVFAC).<br />

2. ALLOCATION.<br />

a. General.<br />

The Comptroller allocates the obligational authority for the MCNR<br />

appropriation to CNO who then suballocates the authority to<br />

NAVFAC. The NAVFAC Comptroller allocates and assigns<br />

sufficient funds to each Engineering Field Division (EFD) to finance<br />

its construction program requirements.<br />

b. Reprogramming.<br />

All MCNR construction project and minor construction project<br />

reprogramming requests must be submitted to the House and Senate<br />

Military Construction Appropriations Subcommittees for approval, if<br />

the revised cost estimate exceeds the old by 25 percent or $2.0 million,<br />

whichever is less. The DON must submit the reprogramming request<br />

for approval to each Subcommittee 30 days prior to the date on which<br />

action is required. A formal reprogramming request must be prepared<br />

for each request submitted to Congress. Details on these<br />

reprogramming changes are provided in par. 074503 and are<br />

applicable to the MCNR appropriation.<br />

3. EXECUTION.<br />

a. Program-Year Concept.<br />

The MCNR appropriation is controlled on a program-year and<br />

construction project basis. A program-year consists of all programs<br />

budgeted and approved for funding in a specific budget year. Within<br />

scope of program, cost changes are funded from the program year<br />

account under which the basic transaction occurred.<br />

b. Analysis of Unliquidated Obligations.<br />

Each funds administering office will conduct a continuous program of<br />

analyzing and validating unliquidated obligations, continuing those<br />

which are essential, and expeditiously terminating those which are not<br />

essential. Additional information is provided in the current issuance of<br />

NAVCOMPTINST 7070.37B.<br />

(Change 64)<br />

Financial Management Policy<br />

2-89