d. Operation and Maintenance Limitation.<br />

Projects approved at a cost of $750,000 or less and undertaken within<br />

the authority for appropriations available for operation and<br />

maintenance to finance minor construction projects are constrained in<br />

total cost by 10 U.S. Code 2805(c). Accordingly, if during execution<br />

it appears that an approved project will exceed the limitation, no work<br />

may proceed which will create obligations of the Government in an<br />

amount in excess of the limitation. Immediate notification to CNO or<br />

CMC is required in order to obtain necessary authorization, dependent<br />

upon the revised estimated cost. Title 10 U.S. Code 2805(c)(1)(A)<br />

increased the threshold to $1.5 million for projects to correct a<br />

deficiency that is life, health or safety threatening.<br />

4. BUDGET ACTIVITY 3, PLANNING AND DESIGN.<br />

This budget activity finances the necessary design of construction projects,<br />

including engineering, plans and specifications, and land appraisals, to<br />

develop the most economical engineering solution for facility<br />

requirements in advance of submission of proposed major and minor<br />

construction projects to the Congress. Since costs for design are excluded<br />

from construction project cost estimates, the work to be financed is<br />

budgeted on a program year basis starting with 1 October of each fiscal<br />

year.<br />

(Change 67)<br />

074522 BUDGET ACTIVITY SUBHEADS<br />

The first subdivision under the appropriation is the budget activity, which is<br />

identified in the account structure by a separate subhead. The MCNR<br />

appropriation four-digit subhead numbering system identifies the following<br />

data elements.<br />

First two digits - Administering office<br />

Third digit - Fiscal year program<br />

Fourth digit - Budget activity<br />

(Change 62)<br />

074523 ADMINISTRATION<br />

1. APPORTIONMENT.<br />

Project proposals are developed by Navy and Marine Corps field activities<br />

and submitted via command chain to claimants, who, in turn, submit their<br />

command-approved projects requests to the Chief of Naval Operations<br />

(N095) for consideration in development of the annual Military<br />

Construction Reserve Program. N095 coordinates the preparation and<br />