programs for ease of administration. Subheads are assigned at the P-1 lineitem<br />

level or lower if more than one manager or command is involved in the<br />

execution of a P-1 line item. The Aircraft Procurement, Navy appropriation<br />

four-digit subhead numbering system identifies the following data elements:<br />

First digit - Designated manager or command responsible for all or a part<br />

of the P-1 line item<br />

Second digit - Budget activity<br />

Third and fourth digits - P-1 line item.<br />

(Change 45)<br />

074303 ADMINISTRATION<br />

1. APPORTIONMENT.<br />

The appropriation, Aircraft Procurement, Navy (APN), is subject to the<br />

annual apportionment process described in par. 073100. Based on the<br />

estimates of the project/program managers, the Naval Air Systems<br />

Command (NAVAIRSYSCOM) prepares the annual apportionment<br />

request which is submitted for review to the Chief of Naval Operations<br />

(CNO), the Comptroller, and the Office of the Under Secretary of Defense<br />

(Comptroller) (OUSD (C)) for transmittal to the Office of Management<br />

and Budget (OMB). Based on OUSD (C)/OMB analysis and prospective<br />

congressional appropriations action, funds are either released for<br />

execution or placed in a deferred status.<br />

2. ALLOCATION.<br />

The Comptroller allocates funds to the CNO, designated as the responsible<br />

office for APN. The allocation is passed in its entirety from CNO to the<br />

Naval Air Systems Command (NAVAIRSYSCOM), which is designated<br />

as the principal administering office. Allocations are subdivided on a<br />

procurement line-item basis (Exhibit P-1). Within NAVAIRSYSCOM,<br />

funds are provided to project/program managers. Internal control of<br />

reprogramming at the command and project/program manager levels is<br />

accomplished by requiring the review and approval of allocation changes<br />

by the NAVAIRSYSCOM Comptroller.<br />

3. EXECUTION<br />

a. Program-Year Concept.<br />

The APN appropriation is controlled at command level on a programyear<br />

and weapons system line-item basis. A program year consists of<br />

all programs budgeted and approved for funding in a specific budget<br />

year. Each procurement action is charged to the program year under<br />

which it was budgeted. Subsequently, within scope of program, cost<br />

changes are funded from the program-year account under which the<br />

Financial Management Policy<br />

2-50