10.01.2013 Views

2011 Alumni D - Chemical and Biomolecular Engineering ...

2011 Alumni D - Chemical and Biomolecular Engineering ...

2011 Alumni D - Chemical and Biomolecular Engineering ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

-2-<br />

Koff olt Laboratories<br />

Th e planning for our new building is moving forward fairly smoothly. Th e site preparation<br />

is, if anything ahead of schedule, with the demolition of Boyd, Johnston, Aviation<br />

<strong>and</strong> Haskett completed as you can determine from a webcam view which can<br />

be accessed from the department homepage. Th e groundbreaking ceremony for the<br />

building will take place this summer with construction activity to begin shortly thereaft<br />

er. So far we are within budget <strong>and</strong> slightly ahead of schedule. Our fund raising<br />

eff ort, while far from complete, is progressing nicely <strong>and</strong> we have naming gift s for<br />

several attractive spaces in the building. We have come a long way from the concept to<br />

build a new Koff olt Laboratories which began nearly a decade ago, <strong>and</strong> we eagerly look<br />

forward to occupying our superb new space at the end of 2014.<br />

*Renderings <strong>and</strong> drawings from Pelli Clarke Pelli Architects-New Haven, Connecticut.<br />

Left : Lecture Hall; Above: Design Classroom Space; Below: Bridge Conference Room

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!