JULY 2008<br />

THE COMMUNITY VISION<br />

PUBLIC OPEN SPACE AND THE<br />

WATERFRONT<br />

LAND USE, URBAN DESIGN<br />

& DESIGN GUIDELINES<br />

TRANSPORTATION PLANNING


acknowledgments<br />

The <strong>Eustis</strong> <strong>Master</strong> <strong>Plan</strong> was developed by the people <strong>of</strong> <strong>City</strong> <strong>of</strong> <strong>Eustis</strong>, <strong>City</strong> <strong>of</strong> <strong>Eustis</strong> Staff,<br />

and lead consultant Glatting Jackson Kercher Anglin, Inc. A special thanks goes to all the<br />

individuals that volunteered their time for interviews, workshops, and sessions.<br />

CITY COMMISSION<br />

Mayor Evelyn H. Smith, Seat 3<br />

Vice Mayor Scott M. Ales, Seat 1<br />

Commissioner Jonnie C. Hale, Seat 5<br />

Commissioner Karen LeHeup-Smith, Seat 2<br />

Commissioner James T. Rotella, Seat 4<br />

CITY OF EUSTIS<br />

Paul Berg, <strong>City</strong> Manager<br />

John Schneiger, Assistant <strong>City</strong> Manager<br />

John Futch, Public Works Director<br />

Jim R. Myers, Jr., Finance Director<br />

Dianne Kramer, Development Services<br />

Richard Hoon, Community Relations<br />

Fred A.M. Cobb, Police Chief<br />

Roy Tremain, Fire Chief<br />

STEERING COMMITTEE<br />

Paul Berg, <strong>City</strong> Manager<br />

John Schneiger, Assistant <strong>City</strong> Manager<br />

John Futch, Public Works Director<br />

Jim R. Myers, Jr., Finance Director<br />

Fred A.M. Cobb, Police Chief<br />

Steven Benetz<br />

Ramah Wagner<br />

Collen Rotella<br />

Kace Montgomery<br />

Mary Harris<br />

Wayne Carter<br />

Kevin Jenness<br />

John Roberts<br />

Frank Bartle<br />

John Buxman<br />

Gwendolyn Manning<br />

Bryan Broomfield<br />

Jack Prickett<br />

DOWNTOWN EUSTIS MASTER PLAN<br />

DESIGN TEAM<br />

GLATTING JACKSON KERCHER ANGLIN, INC.<br />

John Paul Weesner, Project Manager<br />

Peter C. Sechler, Principal<br />

Billy Hattaway, Traffic Engineering<br />

Tara Salmieri, Senior <strong>Plan</strong>ner<br />

Jane Lim-Yap, Senior Urban Designer<br />

Jonathan Mugmon, Signage and Wayfinding<br />

Leah Mader, Urban Designer<br />

REAL ESTATE RESEARCH CONSULTANTS<br />

Owen Beitsch, President<br />

Tom Kohler, President<br />

Jordan Cook, Market Economist<br />

GAI CONSULTANTS<br />

Mark Sweeney, Project Engineer<br />

HALCROW, INC.<br />

Jim Marino, Vice President<br />

Simon Burchett, Senior Marina Engineer<br />

SPECIAL THANKS TO:<br />

<strong>Eustis</strong> Main Street<br />

<strong>Eustis</strong> Historical Society<br />

Lake <strong>Eustis</strong> Area Chamber <strong>of</strong> Commerce<br />

Lake <strong>Eustis</strong> Institute<br />

Lake Community Foundation<br />

<strong>Downtown</strong> Merchants Association<br />

Bay Street Players<br />

Lake <strong>Eustis</strong> Museum <strong>of</strong> Art<br />

Lake <strong>Eustis</strong> Sailing Club<br />

Inland Lake Railways<br />

Lake-Sumter Metropolitan <strong>Plan</strong>ning Organization<br />

Tindale Oliver Associates<br />

University <strong>of</strong> Florida - Center for Building Better<br />

Communities


contents Executive Summary . . . . . . . . . . . . . . . . . . . . . . . . . . 4-6<br />

Project Goal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4<br />

Public Meetings and Common Visions . . . . . . . . 7<br />

Design Principles and and Objectives . . . . . . . . . . . . . . . 8-9<br />

The <strong>Master</strong> <strong>Plan</strong> — “Three Phases” . . . . . . . . . . . . . 10-11<br />

Phase One . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-21<br />

Program the Waterfront . . . . . . . . . . . . . . . . 12<br />

Walkability and Beautification . . . . . . . . . . 13<br />

Streetscapes and Connectivity . . . . . . . .14-16<br />

Infrastructure . . . . . . . . . . . . . . . . . . . . . . . . . 17<br />

Urban Design Standards . . . . . . . . . . . . . . . . 18<br />

Marketing the <strong>Downtown</strong>. . . . . . . . . . . . 19-20<br />

Developer’s Toolkit . . . . . . . . . . . . . . . . . . . . 21<br />

Phase Two . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22-23<br />

<strong>Eustis</strong> Marina . . . . . . . . . . . . . . . . . . . . . . . . . 22<br />

Infill Residential and Affordable Housing . 23<br />

Phase Three . . . . . . . . . . . . . . . . . . . . . . . . . . . 24-27<br />

Catalyst Sites . . . . . . . . . . . . . . . . . . . . . . 24-26<br />

Two-Way Conversion <strong>of</strong> Bay and Grove . . 27<br />

Conclusions — Action Items . . . . . . . . . . . . . . . . . . . . 28<br />

Glatting Jackson Kercher Anglin, Inc. - Digital Project Database CD . . . . . . . . Appendix A<br />

Real Estate Research Consulting - Market Opportunities Assessment . . . . . . Appendix B<br />

GAI Consultanting - Stormwater <strong>Master</strong> <strong>Plan</strong> Technical Memorandum . . . . . . Appendix C<br />

Halcrow, Inc. - <strong>City</strong> <strong>of</strong> <strong>Eustis</strong> <strong>Downtown</strong> <strong>Master</strong>plan Waterfront Concept . . . . Appendix D


executive summary<br />

EXECUTIVE SUMMARY<br />

The <strong>City</strong> <strong>of</strong> <strong>Eustis</strong> has completed a citizen-driven master planning study for the <strong>Downtown</strong>. This<br />

planning effort is intended to build upon the pre-existing community vision and provide a broad<br />

foundation for public consensus on strategic actions to implement the vision. The <strong>City</strong> <strong>of</strong> <strong>Eustis</strong> sits<br />

in a unique location on the shores <strong>of</strong> Lake <strong>Eustis</strong>, within the “Golden Triangle”, along with Tavares<br />

and Mt. Dora. <strong>Eustis</strong> has seen significant decline in its <strong>Downtown</strong> commercial and retail economic<br />

vitality and this <strong>Master</strong> <strong>Plan</strong> builds on <strong>Eustis</strong>’ strengths and addresses emerging redevelopment<br />

opportunities to ensure a diverse future as an urban center serving the needs <strong>of</strong> the <strong>City</strong>’s residents<br />

and its visitors.<br />

The <strong>Master</strong> <strong>Plan</strong>ning process provided a community forum for discussing these issues and<br />

opportunities. The process was guided by a Steering Committee made up <strong>of</strong> <strong>City</strong> Staff and<br />

representatives from local businesses, community organizations, and neighborhoods. In addition to<br />

this committee, numerous one-on-one stakeholder interviews and three public meetings provided<br />

the <strong>Eustis</strong> citizens a forum for public discourse. Based on these discussions and previous visioning<br />

efforts, a mission statement was adopted:<br />

To create a <strong>Master</strong> <strong>Plan</strong> that correlates the desired physical<br />

vision with market opportunities, desired public realm<br />

objectives, an adequate transportation system, good urban<br />

form, and appropriate land-use and regulatory principles,<br />

including strategic actions to achieve results.<br />

PROPOSED FERRAN PARK IMPROVEMENTS AND EXPANSION<br />

4 CITY OF EUSTIS | DOWNTOWN PLAN


executive summary<br />

In addition to this mission statement, seven planning principles for building a better <strong>Downtown</strong> were<br />

established to help direct the <strong>Master</strong> <strong>Plan</strong>ning process. Those principles are:<br />

• Capitalize on Strategic <strong>Downtown</strong> Parcels<br />

• Connect to the Waterfront<br />

• Leverage the Assets (Historic <strong>Downtown</strong> Lakefront)<br />

• Balance the Pedestrian Needs and Transportation Needs<br />

• The <strong>City</strong> Should be Walkable and Beautiful<br />

• Reconnect the Neighborhoods<br />

• Create a Regulatory and Economic Structure that Supports<br />

and Markets the Vision<br />

With these principles guiding the process,<br />

the <strong>Master</strong> <strong>Plan</strong> envisioned the importance<br />

<strong>of</strong> developing livable solutions to various<br />

issues affecting the <strong>City</strong> today. Livable<br />

solutions means that residents can live,<br />

work, shop, and play in a <strong>Downtown</strong> that<br />

is walkable and convenient.<br />

To achieve this, the <strong>Master</strong> <strong>Plan</strong> suggests<br />

new thinking about infrastructure,<br />

transportation planning, affordable<br />

housing, and residential densities.<br />

In order to accomplish this new thinking<br />

without losing the quaint, historic<br />

nature <strong>of</strong> the <strong>Downtown</strong>, a series <strong>of</strong> key<br />

recommendations were developed as<br />

“action items” that are intended to be the<br />

first and continuing steps the <strong>City</strong> can take<br />

in order to achieve the full capacity <strong>of</strong> the<br />

citizen-based vision.<br />

PROPOSED GROVE STREETSCAPE<br />

• Enhance the <strong>Downtown</strong> Address<br />

• Focus on the Neighborhoods<br />

• Establish the Property Framework<br />

• Establish the Social Pattern – Coming to <strong>Downtown</strong><br />

• Market <strong>Downtown</strong> to the Development Community<br />

• Defend Your Position<br />

• Neighborhood Reinvestment<br />

• <strong>Downtown</strong> Residential Densification<br />

CITY OF EUSTIS | DOWNTOWN PLAN 5


executive summary<br />

This <strong>Master</strong> <strong>Plan</strong> report is summarized<br />

beginning with the public process and<br />

citizen input. The report then walks<br />

through the primary planning principles,<br />

and breaks down the <strong>Master</strong> <strong>Plan</strong> into<br />

three phases. Those three phases are<br />

discussed in detail and the report closes<br />

with a conclusion and the next steps<br />

required for action and implementation.<br />

The <strong>City</strong> <strong>of</strong> <strong>Eustis</strong> is billed as “The <strong>City</strong><br />

<strong>of</strong> Bright Tomorrows” and this has never<br />

been truer. The <strong>Master</strong> <strong>Plan</strong> builds on<br />

the strong citizen-based community<br />

vision and goes further to realize the full<br />

potential <strong>of</strong> the <strong>Downtown</strong>.<br />

The <strong>Master</strong> <strong>Plan</strong> anticipates the changing Land Development Regulations and the potential market<br />

demands within the <strong>City</strong>. The outcome is a consensus on the importance <strong>of</strong> reinvestment into both<br />

the public realm and private property. This will require bold new initiatives to plan, incentivize, and<br />

finance many public enhancements and redevelopment activities. Partnerships between public<br />

agencies, private businesses, and the community will be necessary to ensure success. <strong>Downtown</strong><br />

<strong>Eustis</strong> has tremendous potential as a regional center for urban living, fostered by its rich community<br />

built on the <strong>City</strong>’s unique arts, culture, and environmental resources. With a coordinated plan and<br />

the right tools for success, <strong>Downtown</strong> <strong>Eustis</strong> can ensure a bright tomorrow as a livable city in which<br />

young pr<strong>of</strong>essionals, retirees, families, and tourists will come to live, work, play, and visit.<br />

6 CITY OF EUSTIS | DOWNTOWN PLAN<br />

PROPOSED MAGNOLIA STREETSCAPE<br />

AERIAL PERSPECTIVE SHOWING NEW MARINA, DOWNTOWN REDEVELOPMENT,<br />

AND AN ENHANCED WATERFRONT


Study Area<br />

• North Boundary<br />

SR19 & CR 452<br />

• South Boundary<br />

Lakeview Ave<br />

• West Boundary<br />

Lake <strong>Eustis</strong><br />

• East Boundary<br />

Mary Street<br />

THE STUDY AREA<br />

STEERING COMMITTEE WALKING AUDIT<br />

Using the common visions from these efforts, the<br />

design team conducted a walking audit with the<br />

<strong>City</strong>-appointed Steering Committee. This walking<br />

audit yielded valuable on-site realizations about<br />

the needs and desires <strong>of</strong> the <strong>City</strong>.<br />

background and summary the planning process<br />

THE MASTER PLANNING PROCESS<br />

The design team reviewed the previous<br />

visioning efforts made by the <strong>City</strong> and<br />

various consultants including the Strategic<br />

<strong>Plan</strong> 2007-2012-2022, <strong>Eustis</strong> Community<br />

Visioning Meetings conducted from April<br />

to May <strong>of</strong> 2007, and Building Bridges for<br />

Economic Development – Lake County, FL.<br />

Various other key stakeholders, including all<br />

the Commissioners and other members <strong>of</strong> the<br />

community, were interviewed and their input<br />

was incorporated into the study.<br />

In addition to several stakeholders and Steering<br />

Committee meetings, three public meetings<br />

were held, at which input in various forms was<br />

accepted. Over the course <strong>of</strong> these meetings<br />

it is estimated that over 120 <strong>Eustis</strong> residents<br />

attended. The second public meeting included<br />

an interactive session where participants were<br />

asked to place ‘dots’ on themes that were most<br />

important to them.<br />

These themes were later ranked and organized<br />

into draft themes that formed the basis <strong>of</strong> the<br />

design principles and ultimately framed the<br />

master plan.<br />

PUBLIC MEETINGS AND COMMON VISIONS<br />

• Promote Mixed Uses In and Near the <strong>Downtown</strong><br />

• Encourage “Mom & Pop” Stores<br />

• Promote the Arts<br />

• Encourage Pedestrianism, Walkability, and Park<br />

Space<br />

• Take Advantage <strong>of</strong> Lake <strong>Eustis</strong><br />

• Protect the Existing Character<br />

• Increase Density in Appropriate Areas<br />

• Alternative Options for the “Corridors” (US 19 &<br />

SR 44)<br />

• Become Green and Sustainable<br />

CITY OF EUSTIS | DOWNTOWN PLAN 7


principles and objectives<br />

INTRODUCTION Based on an existing conditions analysis and the citizen-driven themes, the<br />

design team formed seven fundamental design principles to guide the <strong>Master</strong> <strong>Plan</strong> effort. These<br />

principles are as follows:<br />

Capitalize on Strategic<br />

<strong>Downtown</strong> Parcels<br />

<strong>Downtown</strong> <strong>Eustis</strong> has a few key parcels that,<br />

if redeveloped within the vision <strong>of</strong> the master<br />

plan, would quickly re-position the <strong>City</strong> center<br />

as a livable, walkable place.<br />

8 CITY OF EUSTIS | DOWNTOWN PLAN<br />

Leverage the Assets<br />

(Historic <strong>Downtown</strong> Lakefront)<br />

The regional uniqueness <strong>of</strong><br />

<strong>Eustis</strong> is derived from the<br />

historic downtown waterfront<br />

setting. This aspect can be<br />

leveraged to attract the kind <strong>of</strong><br />

development that is consistent<br />

with the existing pattern, while<br />

simultaneously balancing<br />

the future infrastructure and<br />

population needs.<br />

Connect to the Waterfront<br />

The waterfront is <strong>Eustis</strong>’ biggest asset and<br />

therefore should be the primary focus <strong>of</strong> the<br />

downtown master plan. Through streetscaping<br />

and other methods, the value and richness <strong>of</strong><br />

the waterfront should be extended easterly<br />

into the downtown core and residential<br />

neighborhoods.


The <strong>City</strong> Should be<br />

Walkable and Beautiful<br />

A common theme from the citizen input was the<br />

general improvement <strong>of</strong> the beauty and walkability<br />

<strong>of</strong> the <strong>City</strong>. This should be achieved through an<br />

overall focus on stronger and healthier pedestrian<br />

environments and the implementation <strong>of</strong> more<br />

extensive street tree canopy.<br />

Reconnect the<br />

Neighborhoods<br />

The in-town residential neighborhoods are the lifeblood<br />

<strong>of</strong> the <strong>Downtown</strong> core. These neighborhoods should<br />

be reconnected through continuous streets, adequate<br />

pedestrian facilities, and viewsheds to Lake <strong>Eustis</strong>.<br />

principles and objectives<br />

A balance must be struck between the pedestrian needs<br />

and general livability and the demands <strong>of</strong> the roadways<br />

to enhance the overall community vision.<br />

Balance the Pedestrian Needs<br />

and Transportation Needs<br />

In order to ensure the success <strong>of</strong> the citizen-based vision,<br />

the <strong>Downtown</strong> <strong>Eustis</strong> <strong>Master</strong> <strong>Plan</strong> should be reflected in<br />

a regulatory structure that is implementable within a<br />

market-based economic strategy.<br />

Create a Regulatory and<br />

Economic Structure that<br />

Supports and Markets the<br />

Vision<br />

CITY OF EUSTIS | DOWNTOWN PLAN 9


the master plan — “three phases”<br />

The <strong>Downtown</strong> <strong>Eustis</strong> <strong>Master</strong> <strong>Plan</strong> is broken into three phases to reflect an implementable strategic<br />

action plan.<br />

10 CITY OF EUSTIS | DOWNTOWN PLAN


the master plan — “three phases”<br />

The second phase builds upon the<br />

implementation <strong>of</strong> Phase I and focuses on<br />

a new marina development to capitalize on<br />

Lake <strong>Eustis</strong> as a major asset. The marina<br />

is broken into two phases for a total <strong>of</strong> 48<br />

new wet slips in <strong>Downtown</strong>. Phase II also<br />

considers the rebounding housing market<br />

and suggests a focus on developing infill<br />

residential <strong>of</strong> various types in and around the<br />

core downtown and in-town neighborhoods.<br />

The beautification and livability efforts in<br />

Phase I will make this in-town residential more<br />

attractive and succeed in the goal <strong>of</strong> bringing<br />

more residents into the <strong>Downtown</strong>.<br />

Phase I<br />

The first phase <strong>of</strong> the <strong>Master</strong> <strong>Plan</strong> involves<br />

items that can be controlled and modified by<br />

the <strong>City</strong>. This includes general beautification,<br />

pedestrian crossings and general walkability,<br />

new streetscapes and street tree plantings,<br />

required infrastructure, and a stormwater<br />

master plan. Phase I also includes a focus on<br />

updated <strong>Downtown</strong> signage and wayfinding,<br />

urban design standards, marketing<br />

and development efforts, and strategic<br />

partnering with regional entities to achieve<br />

broader based efforts.<br />

Phase II<br />

Phase III<br />

Phase III considers that the residential market<br />

has rebounded and that the <strong>City</strong> has positioned<br />

itself well through Phases I and II. Phase III<br />

examines three catalyst sites that <strong>of</strong>fer the most<br />

development potential for a higher density,<br />

mixed-use project. The sites were selected<br />

based on cost to redevelop, likelihood <strong>of</strong><br />

change, and overall redevelopment potential.<br />

CITY OF EUSTIS | DOWNTOWN PLAN 11


the master plan — phase one<br />

PROGRAM THE WATERFRONT<br />

North End Marina<br />

The north end <strong>of</strong> the contiguous waterfront would be<br />

anchored by the Marina which would serve more active<br />

boating uses on the Lake such as motor boats and jet skis.<br />

Focusing this use on the north side <strong>of</strong> the park separates<br />

it from the more passive uses to the south, but it still is<br />

within reasonable walking distance to the <strong>Downtown</strong>.<br />

Extend the Park to Bay Street<br />

The Lake Walk would remain in place and be enhanced by<br />

extending additional park areas all the way to Bay Street. Some<br />

quantity <strong>of</strong> <strong>of</strong>f-street parking would remain adjacent to the Crazy<br />

Gator’s restaurant, but other areas <strong>of</strong> parking would convert to<br />

green space. The <strong>Eustis</strong> Main Street building would also remain,<br />

but become a piece <strong>of</strong> park architecture or a future transit station.<br />

Enhance Ferran Park<br />

One <strong>of</strong> the most important comments from the public meetings was<br />

to maintain the Ferran Park viewsheds from the park out to the<br />

Lake. The <strong>Master</strong> <strong>Plan</strong> calls for making improvements to Ferran Park<br />

including more groundcover and colorful shrubs, as well as other<br />

site amenities like lighting, swings, and uniform site furnishings.<br />

Consider Expanding the Park through Sharp’s Park<br />

As Sharp’s Park redevelops, there is an opportunity to extend Ferran<br />

Park to Sunset Island Park.This will create a new place for<br />

other park amenities, like walking trails, large open<br />

spaces for gathering or watching fireworks, and<br />

even a small stage area for children to play.<br />

Passive Park<br />

Kayaks,<br />

Canoes<br />

12 CITY OF EUSTIS | DOWNTOWN PLAN<br />

Active Marina<br />

Extend the<br />

Park<br />

Ferran Park<br />

Viewsheds<br />

Expand Ferran Park<br />

Refocus Sunset Island Park for Passive Recreation<br />

The existing Sunset Island Park could be reprogrammed<br />

to accommodate more passive uses<br />

on the Lake such as kayaking and canoeing. Walking<br />

trails would connect the existing tennis courts and<br />

play areas with the rest <strong>of</strong> the waterfront amenities,<br />

creating a continuous circuit from Sunset Island Park<br />

to Ferran Park, to the Lake Walk, to the History Museum,<br />

to the Community Center, and finally to the new Marina.


the master plan — phase one<br />

WALKABILITY & BEAUTIFICATION<br />

BEAUTIFICATION<br />

The first phase <strong>of</strong> the <strong>Master</strong> <strong>Plan</strong> entails basic beautification efforts in and around the <strong>Downtown</strong><br />

Core. These efforts will greatly improve property values, but moreover will create a more pleasant<br />

and unique identity for the <strong>Downtown</strong> which will begin to set it apart from other cities in the<br />

region.<br />

PROGRAM THE WATERFRONT<br />

The Lakefront is one <strong>of</strong> the biggest assets<br />

in the <strong>City</strong>. However, currently it’s underprogrammed<br />

and therefore underutilized.<br />

<strong>Eustis</strong> needs a “Great Park” and the<br />

waterfront presents a unique opportunity.<br />

Great Parks are centers <strong>of</strong> community life<br />

composed <strong>of</strong> discrete outdoor rooms,<br />

shaded paths, and garden architecture.<br />

They are inclusive social hubs, relevant<br />

on “every” days and on “special” days,<br />

activated by people who are playing,<br />

watching, resting, eating, listening, and<br />

learning. They are understandable places<br />

<strong>of</strong> civic pride, beauty, and gentility.<br />

WALKABILITY<br />

In addition to adding beauty to<br />

the <strong>Downtown</strong> Core, the <strong>City</strong><br />

must become a more walkable<br />

place. Installing <strong>of</strong> street trees<br />

and changing the section <strong>of</strong> some<br />

roadways will slow drivers through<br />

the <strong>Downtown</strong> while continuing to<br />

efficiently accommodate vehicles.<br />

The following will further enhance<br />

the <strong>Downtown</strong> Core:<br />

• <strong>Plan</strong>ting Street Trees<br />

• Consistent Street Furniture on “A”<br />

Streets<br />

• Wider Sidewalks<br />

• Bike Lanes<br />

• On-Street Parking<br />

• <strong>Plan</strong>ting Native, Xeric, and Flowering<br />

<strong>Plan</strong>ts on “A” Streets<br />

• Improve or Upgrade Crosswalks<br />

• Upgrade or Repair Crosswalks Ramps<br />

• Canopy or Shade Structures Over<br />

Business Entrances<br />

EXISTING GROVE STREET - NOT WALKABLE<br />

PROPOSED GROVE STREET - VERY WALKABLE<br />

CITY OF EUSTIS | DOWNTOWN PLAN 13


the master plan — phase one<br />

STREETSCAPES<br />

PROPOSED BAY STREET<br />

PROPOSED GROVE STREET<br />

SLOW DOWN THE TRAFFIC<br />

Streetscape elements will help to slow traffic<br />

and create a more walkable <strong>Downtown</strong>. The<br />

<strong>City</strong> also could request that the posted speed<br />

limit <strong>of</strong> 35 MPH be lowered in the Core (Bates<br />

Avenue to Orange Avenue) to 25 MPH and 30<br />

MPH north and south <strong>of</strong> those boundaries.<br />

While this would increase the travel time<br />

through <strong>Downtown</strong> <strong>Eustis</strong> by approximately 30<br />

seconds, the walkability and pedestrian safety<br />

would significantly increase.<br />

14 CITY OF EUSTIS | DOWNTOWN PLAN<br />

BAY STREET AND GROVE STREET<br />

The existing Bay St. and Grove St. have very wide<br />

sections. The <strong>Master</strong> <strong>Plan</strong> proposes narrowing the<br />

lane to 11’-0” and increasing the on-street parking<br />

spaces to a width <strong>of</strong> 9’-0”. While this is wider than<br />

typical standards, it allows the bulb-out areas to<br />

extend further and thereby slow down traffic.<br />

The section would include new street trees in<br />

planters or grates in the <strong>Downtown</strong> Core and in<br />

tree lawns outside the <strong>Downtown</strong> Core. Period<br />

lighting in the <strong>Downtown</strong> Core can highlight the<br />

historic qualities <strong>of</strong> <strong>Eustis</strong>. This could be combined<br />

with appropriate signage and banners within the<br />

<strong>Downtown</strong> Core.<br />

The sidewalk areas would be 7’-0” in some areas<br />

and grow to 13’-6” in areas <strong>of</strong> frontage retail, where<br />

retailers could place tables and chairs or other<br />

amenities in front <strong>of</strong> their stores.


ROAD CONNECTIVITY<br />

Overall walkability in the <strong>Downtown</strong> can be<br />

increased by reconnecting certain streets that<br />

have been broken over time. In the <strong>Downtown</strong><br />

Core, three specific connections are identified:<br />

CONNECT BATES AVENUE<br />

(TO SR 44)<br />

CONNECT LAKESHORE<br />

TO ORANGE AVENUE<br />

CONNECT<br />

MCDONALD<br />

AVENUE<br />

the master plan — phase one<br />

CONNECTIVITY<br />

TRAFFIC CALMING TOOLKITS<br />

As more roads get connected into the<br />

<strong>Downtown</strong>, the adjacent neighborhoods<br />

need to be taken into account. There<br />

are many different ways to “calm” traffic,<br />

which means making cars and trucks drive<br />

slower while they are in places where they<br />

should be driving slower. A “chicane”, at<br />

top, and a “mini-circle”, at bottom, are a<br />

couple <strong>of</strong> the many resources available to<br />

calm traffic.<br />

PEDESTRIAN CROSSING<br />

The walking audit conducted early in the design process showed that many <strong>of</strong> the pedestrian<br />

crossings in the <strong>Downtown</strong> Core are in disrepair or do not meet current American with Disabilities<br />

Act (ADA) standards. Focusing on the core intersections including Magnolia Ave. and Bay St. will<br />

help increase walkability and encourage more people to experience more <strong>of</strong> the <strong>Downtown</strong>. Various<br />

methods available to improve these crossings include: bricked crossing points, raised intersections,<br />

colored concrete at the center <strong>of</strong> each intersection, and signage and wayfinding.<br />

CITY OF EUSTIS | DOWNTOWN PLAN 15


the master plan — phase one<br />

STREETSCAPES<br />

EXISTING MAGNOLIA & EUSTIS<br />

OPTION 1: ANGLED & PARALLEL<br />

OPTION 2: PARALLEL BOTH SIDES<br />

The second option would remove<br />

angled parking altogether and replace<br />

it with parallel parking on both sides<br />

<strong>of</strong> the street. This would allow for a<br />

two-way roadway while increasing<br />

the sidewalk widths from 7’-0” to<br />

13’-6”, which would provide ample<br />

room for tables and chairs, walkways,<br />

and other site furnishings.<br />

Both options assume a loss <strong>of</strong> 18%<br />

to 30% <strong>of</strong> overall on-street parking.<br />

However, this could be <strong>of</strong>fset by better<br />

utilization <strong>of</strong> the public parking garage<br />

and improved pedestrian crossings at<br />

Orange Avenue and <strong>Eustis</strong> Street.<br />

16 CITY OF EUSTIS | DOWNTOWN PLAN<br />

MAGNOLIA AVENUE AND EUSTIS STREET<br />

Magnolia Avenue and <strong>Eustis</strong> Street are the historic “Main<br />

Streets” for <strong>Downtown</strong> <strong>Eustis</strong> and contain many <strong>of</strong> its<br />

unique shops and restaurants. Currently, the one-way road<br />

configuration limits the activity and retail potential <strong>of</strong> this<br />

main street. The <strong>Master</strong> <strong>Plan</strong> <strong>of</strong>fers two alternatives that<br />

would need further study.<br />

The first option removes angled parking from one side<br />

<strong>of</strong> the block and replaces it with parallel parking and an<br />

additional travel lane. This would allow for Magnolia to be<br />

two-way and also still reserve some on-street parking. The<br />

<strong>Plan</strong> also calls for back-in angled parking to replace the<br />

current angled parking. Back-in angled parking is safer,<br />

not only for the driver, but also for pedestrians and cyclists<br />

using the road.<br />

The other benefit is that the sidewalk area would increase<br />

from 7’-0” to 9’-0” giving more space for shoppers and<br />

retailers.<br />

ORIGINAL SECTION OF MAGNOLIA AVENUE IN 1926.<br />

MAGNOLIA AVENUE - TWO-WAY TRAFFIC, WIDER<br />

SIDEWALKS, AND BACK-IN ANGLED PARKING


STORMWATER MASTER PLAN<br />

DIAGRAM<br />

INFRASTRUCTURE<br />

INFRASTRUCTURE<br />

As part <strong>of</strong> the <strong>Master</strong> <strong>Plan</strong>, infrastructure issues were raised and concerns about the impact <strong>of</strong><br />

future development were expressed. A more detailed analysis <strong>of</strong> the infrastructure conditions and<br />

recommendations can be found in Appendix C – GAI Technical Memorandum.<br />

Pond<br />

(12)<br />

<strong>Downtown</strong><br />

Blocks<br />

the master plan — phase one<br />

MASTER STORMWATER PLAN<br />

In order to make the <strong>Downtown</strong> Core more appealing<br />

to potential developers and to solve some existing<br />

infrastructure problems, such as Lake <strong>Eustis</strong> water quality<br />

and flooding at Bay Street and Orange Avenue, the design<br />

team considered a stormwater master plan. In this plan,<br />

stormwater from streets and blocks would be re-directed<br />

away from Lake <strong>Eustis</strong> and into a treatment pond north<br />

<strong>of</strong> <strong>Downtown</strong> and adjacent to Orchid Lake. Preliminary<br />

engineering drawings suggest this pond could have a total<br />

volume <strong>of</strong> 164,000 cubic feet.<br />

Because <strong>of</strong> this total volume, twelve <strong>Downtown</strong> blocks<br />

would not require on-site retention. Not only does this<br />

benefit the potential for redevelopment on those blocks, it<br />

also redirects the run<strong>of</strong>f water away from Lake <strong>Eustis</strong>. The<br />

run<strong>of</strong>f water in the pond would receive primary treatment<br />

through selected plants in the pond. Eventually, the water<br />

would return to Lake <strong>Eustis</strong>, but in a much cleaner state.<br />

TYPICAL CITY RETENTION POND<br />

STORMWATER PARK AS COMMUNITY RESOURCE<br />

The stormwater pond serves a great need in terms<br />

<strong>of</strong> infrastructure, but it also fills a community need:<br />

parks and open space. Many valuable park elements PROPOSED STORMWATER PARK RETROFIT<br />

such as walking and jogging trails, exercise stations,<br />

benches, tot lots, swings, and other active-use elements can be incorporated into the Stormwater<br />

Park. Not only can this be done at the proposed Stormwater Park, but the <strong>City</strong> can also retr<strong>of</strong>it<br />

existing stormwater ponds in the community to make them more park-like. In addition to improving<br />

the quality <strong>of</strong> life in the neighborhoods, property and social values will also increase.<br />

CITY OF EUSTIS | DOWNTOWN PLAN 17


the master plan — phase one<br />

URBAN DESIGN STANDARDS<br />

TYPICAL EXAMPLE (MIXED-USE BUILDING LOT) FROM THE<br />

PROPOSED LAND DEVELOPMENT REGULATIONS<br />

GREEN STREETS<br />

Many cities around the country are<br />

beginning to install Green Streets.<br />

These streets capture run-<strong>of</strong>f water<br />

from the street and return it to the<br />

soil as quickly as possible. Tree<br />

lawns serve as the initial capture<br />

area. These areas are planted with<br />

water-tolerant trees and shrubs<br />

that also pull pollutants from the<br />

water before it is absorbed into<br />

the soil. This relieves the burden <strong>of</strong><br />

trying to capture the run-<strong>of</strong>f from<br />

streets and potentially eases the<br />

requirements for the Stormwater<br />

Park. The <strong>City</strong> should implement<br />

“Green Streets” where possible for<br />

all new streetscapes.<br />

18 CITY OF EUSTIS | DOWNTOWN PLAN<br />

URBAN DESIGN STANDARDS<br />

AND COMPREHENSIVE PLAN<br />

MODIFICATIONS<br />

The current regulations and<br />

Comprehensive <strong>Master</strong> <strong>Plan</strong> are<br />

fairly suburban in nature and are not<br />

in line with the community vision<br />

expressed through the various<br />

stakeholder and public meetings.<br />

The current densities and intensities<br />

allowed, as well as the allowable floor<br />

area ratio, result in a development<br />

pattern that does not maximize<br />

the full efficiency <strong>of</strong> potential<br />

redevelopment blocks.<br />

Currently, the <strong>City</strong> is engaged in<br />

reformatting the Land Development<br />

Regulations that will focus on<br />

building form and massing as well<br />

as lot layouts and setbacks to<br />

achieve a building envelope, as<br />

opposed to specific floor area ratio<br />

requirements.<br />

These modifications will make<br />

the <strong>Downtown</strong> more livable and<br />

walkable, and will begin to match<br />

future development with the historic<br />

nature <strong>of</strong> <strong>Downtown</strong>, but as well as<br />

the desired vision <strong>of</strong> the citizens.


the master plan — phase one<br />

MARKETING THE DOWNTOWN<br />

The final piece <strong>of</strong> Phase I is to begin a new approach to marketing <strong>Eustis</strong> and specifically the<br />

<strong>Downtown</strong>. There are many marketing projects that are consistent with the need for beautification<br />

and greater walkability, but others have to do with strategic positioning.<br />

TYPICAL EXISTING<br />

DECORATIVE, FDOT, AND<br />

REGULATORY SIGNAGE IN<br />

EUSTIS<br />

The <strong>Master</strong> <strong>Plan</strong> suggests generating a consistent and<br />

well-designed signage and wayfinding master plan.<br />

The first piece <strong>of</strong> this plan is to create one cohesive<br />

identity or brand for the <strong>City</strong> and the <strong>Downtown</strong>.<br />

Once this is established, a palette <strong>of</strong> signage can<br />

be applied in strategic places to serve the needs<br />

<strong>of</strong> the drivers, pedestrians, locals, and visitors. In<br />

addition to vehicular and pedestrian signs, gateway<br />

signs should be installed at the major entrances to<br />

the <strong>City</strong>. These signs can be unique and potentially<br />

have an interchangeable portion to announce future<br />

events or important social and cultural happenings.<br />

WAYFINDING “PALETTE” OF SIGNAGE<br />

MARKETING THE DOWNTOWN<br />

SIGNAGE AND WAYFINDING<br />

The existing signage and wayfinding in the <strong>City</strong> is a potpourri<br />

<strong>of</strong> logos and different sign types that do not comply with<br />

ADA, are misplaced in some cases, and occasionally are<br />

inconsistent with the historic nature <strong>of</strong> the <strong>Downtown</strong>. Florida<br />

Department <strong>of</strong> Transportation (FDOT) regulatory signs are<br />

sometimes cluttered with non-regulatory signs, adding to the<br />

overall inconsistency. <strong>Eustis</strong> has standard issue regulatory<br />

signs; however, those signs can be unique while still meeting<br />

FDOT standards.<br />

EXISTING GATEWAY FROM US 441<br />

PROPOSED NEW GATEWAY<br />

EXAMPLE HISTORIC IDENTITY SIGN<br />

CITY OF EUSTIS | DOWNTOWN PLAN 19


the master plan — phase one<br />

MARKETING THE DOWNTOWN<br />

TAVARES<br />

20 CITY OF EUSTIS | DOWNTOWN PLAN<br />

FORM STRONG REGIONAL RELATIONSHIPS<br />

The <strong>City</strong> <strong>of</strong> <strong>Eustis</strong> would benefit greatly from<br />

forming stronger regional relationships with Lake<br />

County and the neighboring cities in the Golden<br />

Triangle: Tavares and Mt. Dora. A potential<br />

outcome would be a regional commuter rail.<br />

MOUNT DORA COMMUTER RAIL<br />

The railroad tracks north <strong>of</strong> <strong>Eustis</strong> have been<br />

removed, which makes <strong>Eustis</strong> the northern-most<br />

point on a potential commuter rail line. With the<br />

existing rail running through <strong>Downtown</strong>, adjacent<br />

to Ferran Park, and some existing structures like<br />

the <strong>Eustis</strong> Main Street Building, <strong>Eustis</strong> would be<br />

well-positioned to become the northern hub <strong>of</strong> the rail line. Regionally, riders from the north, west,<br />

and east would come to <strong>Eustis</strong> to travel to destinations south including Orlando and the theme<br />

parks and attractions.<br />

COORDINATED COMMUNITY EFFORTS<br />

The <strong>City</strong> <strong>of</strong> <strong>Eustis</strong> hosts many great social and cultural<br />

events. The <strong>City</strong> has a unique History Museum, a great<br />

theater troupe in the Bay Street Players, and a wonderful<br />

museum in the Lake <strong>Eustis</strong> Museum <strong>of</strong> Art. In addition, the<br />

<strong>City</strong> sponsors many large events including the Washington’s<br />

Day Parade and various events on the waterfront.<br />

The <strong>City</strong> should consider hiring an Event Coordinator<br />

whose primary responsibilities would be to orchestrate<br />

cultural events in the <strong>City</strong>, as well as coordinate community<br />

organizations in support <strong>of</strong> these events. Citizens will enjoy<br />

the events, businesses will thrive on the visiting crowds, and<br />

<strong>Eustis</strong> will build a reputation for being a livable, walkable,<br />

and fun place.<br />

THE ALICE MCCLELLAND MEMORIAL BANDSHELL AT<br />

FERRAN PARK<br />

SINCE 1902, EUSTIS HAS<br />

CELEBRATED THE WASHINGTON’S<br />

DAY PARADE<br />

THE LEMA SHOWCASES<br />

CONTEMPORARY ART<br />

THE CLIFFORD HOUSE<br />

HOLDS THE HISTORICAL<br />

SOCIETY’S COLLECTION<br />

THE BAY STREET PLAYERS<br />

ARE AN AWARD-WINNING<br />

THEATER TROUPE


DEVELOPER’S TOOLKIT<br />

Another tool used by many cities in marketing their<br />

downtowns is a “Developer’s Toolkit”. This toolkit<br />

contains information related to the vision <strong>of</strong> the <strong>City</strong> and<br />

highlights the key initiatives, demographic information,<br />

public investment programs, and specific contact<br />

people within the <strong>City</strong> to provide a transparent process<br />

for development. This would be a powerful document<br />

for people and businesses looking to invest in <strong>Eustis</strong>.<br />

With such a toolkit, the <strong>City</strong> could translate the vision<br />

<strong>of</strong> the <strong>Master</strong> <strong>Plan</strong> to focus those development efforts<br />

into something that the community can embrace. A<br />

Developer’s Toolkit could include:<br />

PLACE MAKING AND ADDRESS<br />

Many toolkits begin with information piece about the<br />

<strong>Downtown</strong> and the elements that make it unique and<br />

special. A vision statement and key initiatives are<br />

usually included to describe the future direction <strong>of</strong> the<br />

<strong>City</strong>.<br />

the master plan — phase one<br />

DEVELOPER’S TOOLKIT<br />

Developer’s Toolkit<br />

• Place Making and Address<br />

• Regulatory/Entitlements<br />

• Utilities and Infrastructure<br />

• Stormwater<br />

• Environmental Cleanup (Brownfield Sites)<br />

• Land Assembly and Catalyst Sites<br />

• Land Costs and Available Sites<br />

• Structured Parking<br />

REGULATORY/ENTITLEMENTS<br />

Describing existing and desired entitlements can help build surety between the development<br />

community and the <strong>City</strong>. Also, regulatory changes can be advertised to potential developers that<br />

may be more attracted to denser, in-town development options<br />

UTILITIES AND INFRASTRUCTURE<br />

Many cities describe their existing capacity or promote public work projects that could help spur<br />

development. Also, describing a transparent process or expectation <strong>of</strong> developers when it comes<br />

to contribution to infrastructure will also create more surety between the developer and the <strong>City</strong>.<br />

STORMWATER<br />

The <strong>City</strong> can market their efforts to create stormwater master plans that would help entice developers<br />

to build where there are limited needs for on-site retention.<br />

ENVIRONMENTAL CLEANUP (BROWNFIELD SITES)<br />

By identifying brownfield sites and beginning the process to clean them, the <strong>City</strong> can market this<br />

opportunity to developers who won’t need to pay for the cost to remediate the sites.<br />

LAND ASSEMBLY AND CATALYST SITES<br />

By listing specific sites or helping with land assembly, the <strong>City</strong> can make sites in the <strong>Downtown</strong><br />

more appealing to potential developers. This can also help the <strong>City</strong> maintain control over critical<br />

development sites.<br />

LAND COSTS AND AVAILABLE SITES<br />

Many municipalities advertise available sites within their downtown to help facilitate redevelopment.<br />

By listing the information available on the public tax roll, the <strong>City</strong> can help provide information for<br />

potential developers looking to invest in <strong>Downtown</strong> <strong>Eustis</strong>.<br />

STRUCTURED PARKING<br />

Many cities also participate in attracting redevelopment by <strong>of</strong>fering to partially pay for structured<br />

parking. As a quid pro quo, the <strong>City</strong> can reserve a certain amount <strong>of</strong> spaces for public use, while<br />

providing the developer with the needed spaces for higher density projects.<br />

CITY OF EUSTIS | DOWNTOWN PLAN 21


the master plan — phase two<br />

MARINA<br />

At the north end <strong>of</strong> the <strong>Downtown</strong> Core, a two-phase<br />

marina is proposed. In the first phase, the <strong>City</strong> would<br />

take advantage <strong>of</strong> the 20 to 25 slips already permitted by<br />

Army Corps <strong>of</strong> Engineers and build a modern marina that<br />

would capture <strong>Eustis</strong>’ portion <strong>of</strong> the growing wet boat<br />

slips for the Lake County Region. (See RERC’s Market<br />

Analysis – Appendix B)<br />

The northern portion <strong>of</strong> the <strong>Downtown</strong> Core is a good<br />

location for the marina due to its deeper water and the<br />

adjacent <strong>City</strong>-owned properties. The first phase would<br />

include 24 wet slips, a new boat ramp, a clubhouse with<br />

restrooms and a concessions building (for bait and tackle,<br />

as well as, some food and other sundries), and 24 car or<br />

trailer parking spaces.<br />

The second phase would include an additional 24 wet<br />

slips, dry stack storage for 45 boats, and the possibility<br />

for an expanded site that could include a restaurant<br />

and additional parking. Additional detail on the marina<br />

can be found in Halcrow Inc.’s Marina Technical Memo –<br />

Appendix D.<br />

22 CITY OF EUSTIS | DOWNTOWN PLAN<br />

<strong>Eustis</strong> Marina<br />

- 1st Phase – 24 slips<br />

- Boat Ramp<br />

- Concessions, Clubhouse<br />

- 24 Car/Trailer Parking Spaces<br />

- 2nd Phase – 24 Slips<br />

- Dry Stack Storage – 45 Boats<br />

- Possible Restaurant<br />

- Additional Parking<br />

2nd Phase<br />

1st Phase


As the residential market begins to balance out,<br />

infill residential will be an important focus for<br />

the <strong>Downtown</strong> Core. Bringing more residential<br />

into the <strong>Downtown</strong> is imperative for a healthy<br />

retail market and the fastest way the <strong>City</strong> can<br />

generate a larger residential population in<br />

the core. This residential can take the form<br />

<strong>of</strong>: attached condominiums, live/work units,<br />

artist-in-residence l<strong>of</strong>ts, two-to-three story<br />

townhomes, multi-level apartments, and<br />

small-scale, mixed-use residential. These<br />

kinds <strong>of</strong> denser residential can be built on<br />

smaller lots or combined lots. The Community<br />

Redevelopment Agency (CRA) can play an<br />

important role in helping to accumulate and<br />

assemble these properties while advertising<br />

the redevelopment potential.<br />

In addition to focusing on infill housing, the<br />

<strong>City</strong> can to incentivize residential to make it<br />

affordable. There are many different methods<br />

for encouraging affordability including the<br />

items listed in the adjacent table.<br />

MIXED-USE RESIDENTIAL<br />

LIVE/WORK HOUSING<br />

2-3 STORY CONDOMINIUMS<br />

the master plan — phase two<br />

INFILL RESIDENTIAL<br />

LOW-INCOME HOUSING TAX CREDIT (LIHTC)<br />

LIHTC, a federal program administered by the<br />

Florida Housing Finance Corporation, provides<br />

a developer with tax credits in exchange for<br />

the developer keeping a certain percentage<br />

<strong>of</strong> rental units affordable to specified income<br />

brackets.<br />

DOWN-PAYMENT ASSISTANCE<br />

The <strong>City</strong> <strong>of</strong> <strong>Eustis</strong> could establish a downpayment<br />

assistance program for low- or<br />

moderate-income homebuyers. Often, the<br />

grant is repaid when the grantee sells the home,<br />

so the funds can re-circulate and help another<br />

family.<br />

OTHER FEDERAL AND STATE PROGRAMS<br />

Numerous state and federal programs provide<br />

financing for affordable housing, including the<br />

federal HOME program and the state SHIP<br />

dollars.<br />

INCLUSIONARY ZONING<br />

The <strong>City</strong> could amend the Land Development<br />

Code to require that private developers<br />

incorporate a certain percentage <strong>of</strong> affordable<br />

units into their projects. While Inclusionary<br />

Zoning programs have a number <strong>of</strong> benefits,<br />

they can be difficult to implement in places<br />

without a strong real estate market.<br />

LINKAGE FEES<br />

Linkage fees can be assessed on commercial<br />

development, typically on a square foot<br />

basis, that can be used for affordable housing<br />

programs. Linkage fees work like impact fees:<br />

the <strong>City</strong> would have to prove a “rational nexus”<br />

between the fee and the need for affordable<br />

housing that is created by commercial<br />

development.<br />

REVISIONS TO BUILDING CODES<br />

Many building codes contain outdated or<br />

unnecessary requirements that add to the cost<br />

<strong>of</strong> new or rehabilitated housing. New materials<br />

and construction techniques are <strong>of</strong>ten safer<br />

and cheaper, but might not be permitted under<br />

existing codes.<br />

COMMUNITY LAND TRUSTS<br />

A relatively new idea in affordable housing,<br />

community land trusts (CLTs) are an efficient<br />

method <strong>of</strong> keeping for-sale housing affordable<br />

over a very long period <strong>of</strong> time. In a CLT, the<br />

land is owned by a non-pr<strong>of</strong>it organization<br />

or government entity. A homebuyer then<br />

purchases a home on that land, and signs a<br />

long-term, renewable lease for the land. The<br />

terms <strong>of</strong> the lease agreement restrict future<br />

sales prices, keeping the unit affordable in<br />

perpetuity. Although the resident does not own<br />

the land, they still have access to all the benefits<br />

<strong>of</strong> homeownership, including tax deductions.<br />

CITY OF EUSTIS | DOWNTOWN PLAN 23


the master plan — phase three<br />

CATALYST SITES<br />

FOUNDATION SITE<br />

The Lake <strong>Eustis</strong> Community Foundation owns three blocks in the <strong>Downtown</strong> Core that are primed<br />

for redevelopment. One block faces the Core retail streets -- Magnolia Avenue and <strong>Eustis</strong> Street<br />

-- and the other blocks face Bay Street and Grove Street, both <strong>of</strong> which are critical corridors<br />

in the redevelopment <strong>of</strong> the <strong>Downtown</strong> Core. The design team considered several options for<br />

redevelopment potential, including: what is currently allowed by the <strong>City</strong> <strong>of</strong> <strong>Eustis</strong>’ Code; a market<br />

reality-based scheme; and a high-end scheme showing a maximum development potential. Both the<br />

market reality-based scheme and the high-end scheme would be allowed by the Land Development<br />

Regulations being proposed for <strong>Eustis</strong>.<br />

HIGH-END REDEVELOPMENT<br />

Residential: 104 Dwelling Units •<br />

Retail/Office/Com: 83,100 sqft •<br />

Parking: 642 spaces (Structured Pkg) •<br />

Height: 4-5 stories •<br />

24 CITY OF EUSTIS | DOWNTOWN PLAN<br />

EXISTING SITE<br />

CONDITIONS<br />

• 6.3 Acres<br />

• 1,800 Linear Feet “A” Street<br />

Frontage<br />

• General Notes: Current<br />

Undeveloped<br />

EXISTING REDEVELOPMENT<br />

OPTION<br />

• Residential: 72 Dwelling Units<br />

• Retail/Office/Com: 21,450 sqft<br />

• Parking: 194 spaces<br />

• Height: 1-2 stories<br />

• 25% Open Space Requirement<br />

MARKET-BASED<br />

REDEVELOPMENT<br />

• Residential: 93 Dwelling Units<br />

• Retail/Office/Com: 50,200 sqft<br />

• Parking: 310 spaces<br />

(Structured Parking)<br />

• Height: 3-4 stories<br />

PROTOTYPICAL<br />

BUILDING<br />

EXAMPLES


SHOPPING CENTER<br />

On the north side <strong>of</strong> the <strong>Downtown</strong> Core, along Grove Street, an underdeveloped strip commercial<br />

shopping center represents one <strong>of</strong> the larger redevelopment opportunities in the <strong>Downtown</strong>. Due<br />

to the large amount <strong>of</strong> surface parking available, this site also <strong>of</strong>fers the opportunity for a mix <strong>of</strong><br />

uses, including residential and <strong>of</strong>fice space. To capitalize on the redevelopment potential <strong>of</strong> this<br />

area, the bounding streets can be turned into “A” streets by extending Bates Avenue from Grove<br />

Street to Center Street, as described in Phase One, and eventually to Prescott Street. In both the<br />

market-based scenario and the high-end scenario, a large footprint structure could be attractive<br />

to larger-format commercial or educational entities, such as an urban grocery store or a satellite<br />

campus <strong>of</strong> Lake-Sumter Community College.<br />

PROTOTYPICAL<br />

BUILDING<br />

EXAMPLES<br />

the master plan — phase three<br />

EXISTING SITE CONDITIONS<br />

7.2 Acres •<br />

1,140 Linear Feet “A” Street •<br />

Frontage •<br />

General Notes: Multiple •<br />

Ownerships •<br />

EXISTING REDEVELOPMENT<br />

OPTION<br />

Residential: 21 Dwelling Units •<br />

Retail/Office/Com: 35,600 sqft •<br />

Parking: 175 spaces •<br />

Height: 1-2 stories •<br />

25% Open Space Requirement •<br />

MARKET-BASED<br />

REDEVELOPMENT<br />

Residential: 30 Dwelling Units •<br />

Retail/Office/Com: 35,600 sqft •<br />

Parking: 188 spaces •<br />

Height: 2-3 stories •<br />

CATALYST SITES<br />

HIGH-END REDEVELOPMENT<br />

• Residential: 57 Dwelling Units<br />

• Retail/Office/Com: 111, 900 sqft<br />

• Parking: 660 spaces (Structured Parking)<br />

• Height: 3-4 stories<br />

CITY OF EUSTIS | DOWNTOWN PLAN 25


the master plan — phase three<br />

CATALYST SITES<br />

SHARP’S PARK<br />

Adjacent to Ferran Park on the south side <strong>of</strong> the <strong>Downtown</strong> Core is the Sharp’s Park Mobile Home<br />

Community. This use is not consistent with the community vision <strong>of</strong> <strong>Downtown</strong> and <strong>of</strong>fers a prime<br />

opportunity for redevelopment. The site is under one ownership and spans across Lakeshore Drive<br />

(County Road 452). As identified in Phase One, Lakeshore Drive is proposed to connect to Orange<br />

Avenue, which would <strong>of</strong>fer two unique opportunities. First, the land between Lakeshore Drive and<br />

Lake <strong>Eustis</strong> could be utilized as an extension <strong>of</strong> Ferran Park. This would provide an uninterrupted public<br />

lake frontage for approximately 3,600 feet. Secondly, the redevelopment could be a higher density<br />

residential, mixed-use product. This redevelopment could be taller and denser than development<br />

closer to the <strong>Downtown</strong> Core because it does not disrupt view corridors and can easily transition to<br />

the neighborhoods to the south.<br />

HIGH-END REDEVELOPMENT<br />

Residential: 295 Dwelling Units •<br />

Retail/Office/Com: 36,000 sqft •<br />

Hotel: 60 Rooms •<br />

Hotel Conference Space: 11,400 sqft •<br />

Parking: 840 spaces (Structured Pkg) •<br />

Height: 4-8 stories •<br />

26 CITY OF EUSTIS | DOWNTOWN PLAN<br />

EXISTING SITE CONDITIONS<br />

• 10.9 Acres<br />

• 1,200 Linear Feet “A” Street<br />

Frontage<br />

• General Notes: Current<br />

Undeveloped<br />

EXISTING REDEVELOPMENT<br />

OPTION<br />

• Residential: 51 Dwelling Units<br />

• Retail/Office/Com: 29,400 sqft<br />

• Parking: 220 spaces<br />

• Height: 1-2 stories<br />

• 25% Open Space Requirement<br />

MARKET-BASED<br />

REDEVELOPMENT<br />

• Residential: 132 Dwelling Units<br />

• Hotel: 54 Rooms<br />

• Parking: 320 spaces<br />

• Height: 3-4 stories<br />

PROTOTYPICAL<br />

BUILDING<br />

EXAMPLES


TWO-WAY CONVERSION OF BAY & GROVE<br />

The biggest hindrance to <strong>Downtown</strong> walkability is the one-way pair <strong>of</strong> Bay Street and Grove Street<br />

(State Road 19). This state road was converted from a two-way street to a one-way street system in<br />

the mid-1970’s because <strong>of</strong> peak traffic related to the former Waterman Medical Complex located in<br />

the <strong>Downtown</strong> Core. While the Medical Complex has since moved out <strong>of</strong> downtown, current traffic<br />

projections suggest the one-way pairs are still needed. Unfortunately, this does not consider the<br />

utilization <strong>of</strong> <strong>Eustis</strong> Street, which is currently underutilized because <strong>of</strong> the one-way portion through<br />

the <strong>Downtown</strong> Core.<br />

In Phase One, <strong>Eustis</strong> Street would be opened to two-way<br />

traffic and therefore become a viable alternative in dispersing<br />

traffic. In converting Bay Street, <strong>Eustis</strong> Street, and Grove<br />

Street to two-way traffic, the design team assumed that Bay<br />

Street would see a decrease from 50% dispersion to 40%;<br />

<strong>Eustis</strong> Street would see an increase from 0% to 10%; and Grove<br />

Street would see an increase from 50% to 60% dispersion.<br />

Today, travel time through <strong>Downtown</strong> <strong>Eustis</strong> takes about<br />

2.4 minutes. With this dispersion assumption and the twowaying<br />

<strong>of</strong> Bay Street and Grove Street, the travel time through<br />

<strong>Downtown</strong> would only increase by one minute to 3.5 minutes.<br />

The one minute difference is insignificant when compared to<br />

the increases in economic development <strong>of</strong> the blocks facing<br />

Bay and Grove, as well as the overall enhanced connectivity<br />

and walkability in the <strong>Downtown</strong> Core.<br />

Two alternatives were studied related to this dispersal. On<br />

the north end, the traffic could be dispersed through a timed<br />

signalization that would allow the outside lanes to continue<br />

through, while timing the interior lanes to allow traffic to<br />

choose between trips on Bay Street or Grove Street.<br />

the master plan — phase three<br />

TWO-WAY CONVERSION OF BAY & GROVE<br />

100%<br />

40%<br />

BAY ST<br />

100%<br />

10%<br />

EUSTIS ST<br />

60%<br />

GROVE ST<br />

On the south end, a roundabout is suggested at the intersection<br />

VEHICULAR DISPERSION<br />

<strong>of</strong> Grove Street, <strong>Eustis</strong> Street, and Ocklawaha Avenue. This<br />

would disperse traffic travelling northbound while southbound traffic would continue from Bay<br />

Street to SR 19. The projected traffic volumes suggest that travel time on Grove Street in the<br />

northbound direction would only increase by thirty seconds by 2025. The <strong>City</strong> blocks around<br />

these dispersal points will be reinvigorated by the two-way streets and provide redevelopment and<br />

numerous gateway opportunities for the <strong>City</strong>.<br />

NORTH DISPERSAL<br />

INTERSECTION<br />

SOUTH DISPERSAL<br />

ROUNDABOUT<br />

CITY OF EUSTIS | DOWNTOWN PLAN 27


conclusions - action items<br />

CONCLUSION<br />

The <strong>City</strong> <strong>of</strong> <strong>Eustis</strong> is in a unique time, place, and<br />

position. Although the real estate market is<br />

currently s<strong>of</strong>t, particularly with regard to residential<br />

development, the market will eventually rebound<br />

and the <strong>City</strong> should be prepared with revised plans<br />

and regulations to ensure the community vision will<br />

be achieved through redevelopment. Additionally,<br />

with rising gas prices, decreased vehicle miles<br />

traveled (VMT), and opportunities for mass transit,<br />

some <strong>of</strong> the traffic projections on <strong>Eustis</strong> streets<br />

could be overestimated, and overall travel time<br />

may not increase as much as anticipated. This<br />

means that opportunities to improve the quality<br />

<strong>of</strong> life and walkability will be available, which will<br />

improve economic development as well as access<br />

and mobility in and around the <strong>Downtown</strong> Core.<br />

The <strong>Eustis</strong> <strong>Master</strong> <strong>Plan</strong> establishes a specific vision<br />

for the future <strong>of</strong> <strong>Downtown</strong> <strong>Eustis</strong>. However,<br />

<strong>Master</strong> <strong>Plan</strong>s have a limited shelf life, particularly<br />

relative to recommended planning and policy<br />

actions. Without continued discourse and nearterm<br />

action, the energy and citizen consensus<br />

identified in the planning process will be lost and<br />

forgotten. By acting now, the <strong>City</strong> will be better<br />

equipped to respond to the marketplace.<br />

Commitment is vital to the success <strong>of</strong> <strong>Downtown</strong><br />

<strong>Eustis</strong>. The opportunity to succeed is there, but<br />

only if there are coordinated efforts between all<br />

parties and the continued dialogue with the public.<br />

<strong>Downtown</strong> <strong>Eustis</strong> has a tremendous potential<br />

as a regional center for urban living and a rich<br />

community built on the <strong>City</strong>’s unique arts, culture,<br />

and environmental resources. The following<br />

are a series <strong>of</strong> action items and implementation<br />

strategies based on the <strong>Downtown</strong> <strong>Eustis</strong> <strong>Master</strong><br />

<strong>Plan</strong> to guide the <strong>City</strong> towards achieving this<br />

community-driven process.<br />

NEIGHBORHOOD ACTIVITIES<br />

• Property Reinvestment<br />

• Single Family Homes<br />

• Infill Residential<br />

• Affordable/Attainable Housing<br />

DOWNTOWN ACTIVITIES<br />

• Surface Parked<br />

• Townhomes (12-24 du/ac)<br />

• <strong>City</strong> Homes (24-32 du/ac)<br />

• Mixed-Use Condo (Flats with Ground<br />

Floor Commercial)<br />

Future Development (2010-2020)<br />

Getting Ready (2008-2012, and beyond)<br />

ENHANCE THE DOWNTOWN ADDRESS<br />

• Lake <strong>Eustis</strong> Waterfront<br />

• Streetscapes<br />

• Wayfinding and Signage<br />

• Infrastructure Needs / <strong>Master</strong> Stormwater<br />

• Architectural Design Guidelines<br />

FOCUS ON THE NEIGHBORHOODS<br />

• Street Tree <strong>Plan</strong>ting<br />

• Lighting<br />

• Walkability Enhancements<br />

• Retr<strong>of</strong>it Stormwater Ponds as Parks<br />

• Property Enhancement Grants<br />

ESTABLISH THE PROPERTY FRAMEWORK<br />

• Design Standards<br />

• Flexible / Moderately Expanded Development<br />

Opportunities<br />

• Purchasing <strong>of</strong> Critical Properties<br />

• Assembly <strong>of</strong> Land<br />

ESTABLISH THE SOCIAL PATTERN - COMING<br />

TO DOWNTOWN<br />

• Coordinate <strong>Downtown</strong> Events<br />

• Expand <strong>Downtown</strong> Events<br />

• Capitalize on the Assets - Arts & Culture on<br />

the Waterfront<br />

MARKET DOWNTOWN TO THE DEVELOPMENT<br />

COMMUNITY<br />

• Work with Local Partners - Lake County,<br />

Golden Triangle<br />

• Create a Developer’s Toolkit<br />

• Be Connected to Things Bigger Than<br />

Yourself - Commuter Rail, etc.<br />

DEFEND YOUR POSITION<br />

• Flexible Advocacy <strong>of</strong> the Vision<br />

• Structured Parking<br />

• Mid-Rise Condominiums<br />

• 4-5 Stories<br />

• 50-70 du/ac<br />

• Ground Floor Office/Commercial<br />

• Potentially 3-4 Developments<br />

• High-Rise Condominiums/Apartments<br />

• 4-8 Stories<br />

• 60-70 du/ac<br />

• Ground Floor Office/Commercial<br />

• Potentially 1-2 Developments