09.01.2013 Views

State of Technology Report for Force Main Rehabilitation, Final ...

State of Technology Report for Force Main Rehabilitation, Final ...

State of Technology Report for Force Main Rehabilitation, Final ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Technology</strong>/Method Glass Rein<strong>for</strong>ced Thermoplastic Liner/Therm<strong>of</strong>ormed<br />

I. <strong>Technology</strong> Background<br />

Status Emerging<br />

Date <strong>of</strong> Introduction 2008 – development trials in Europe<br />

Utilization Rates Limited -still in development stage<br />

Vendor Name(s) Aqualiner<br />

Aqualiner Ltd<br />

Unit 10, Charnwood Business Park, North Road, Loughborough, Leicestershire,<br />

LE11 1QJ, United Kingdom<br />

Phone: +44 (0) 1509 210027<br />

Email: info@aqualiner.co.uk<br />

Website: www.aqualiner.co.uk<br />

Practitioner(s) Three field trials undertaken by Wessex Water. Contact Julian Britton, Manager –<br />

Critical Sewers Team, Kingston Seymour STW, Back Lane, Kingston Seymour,<br />

Description <strong>of</strong> <strong>Main</strong><br />

Features<br />

<strong>Main</strong> Benefits<br />

Claimed<br />

Clevedon UK BS21 6UY Tel (44) 01275 875157<br />

Aqualiner involves inserting a glass fiber rein<strong>for</strong>ced polypropylene sock into a<br />

deteriorated pipe. Once the composite sock has been inserted into the host pipe, a<br />

silicone rubber inflation tube pushes a heated pig through the composite melting<br />

the thermoplastic sock against the pipe. The inversion bag presses the molten<br />

thermoplastic composite sock against the pipe wall where it cools to <strong>for</strong>m a solid<br />

glass rein<strong>for</strong>ced thermoplastic liner.<br />

• No mixing <strong>of</strong> chemicals – long shelf life<br />

• Environmentally safe – no releases<br />

• Structural – capable <strong>of</strong> withstanding internal and external pressure<br />

• Thin liner – minimizes any loss <strong>of</strong> capacity with a liner<br />

• Trenchless method <strong>of</strong> installation- minimizes excavation and disruptions<br />

• Still in incubation – not commercially released yet<br />

<strong>Main</strong> Limitations<br />

Cited<br />

• NSF 61 listing and UK approvals in process (DWI Regulation 31).<br />

Applicability <strong>Force</strong> <strong>Main</strong> Gravity Sewer Laterals Manholes Appurtenances<br />

(Underline those that<br />

apply)<br />

Water <strong>Main</strong> Service Lines Other:<br />

Service Application<br />

II. <strong>Technology</strong> Parameters<br />

Water distribution, sewer <strong>for</strong>ce mains<br />

Service Connections Open cut or robotically reinstate. Fusion couplings under development<br />

Structural Rating Fully structural (Class IV). Aqualiner will con<strong>for</strong>m to the strain corrosion<br />

Claimed<br />

requirements <strong>for</strong> a GRP sewer pipe as contained in Table 6 <strong>of</strong> EN 13566-4:2002<br />

(similar to those in ASTM D3262).<br />

Materials <strong>of</strong><br />

Composition<br />

Chopped glass fiber and polypropylene.<br />

Diameter Range,<br />

inches<br />

6-12 inches<br />

Thickness Range,<br />

inches<br />

3-6 mm<br />

Pressure Capacity,<br />

psi<br />

145 psi (10 bar)<br />

Temperature Range,<br />

o<br />

F<br />

-5 o C to 40 o C<br />

Renewal Length, feet 500 feet <strong>of</strong> 12 inches<br />

Other Notes Not available.<br />

III. <strong>Technology</strong> Design, Installation, and QA/QC In<strong>for</strong>mation<br />

Product Standards None at this time. Closest applicable standard might be EN ISO 15874 –<br />

Polypropylene <strong>for</strong> hot and cold water installations<br />

Design Standards None at this time. Closes applicable standard might be EN 13566-4:2002, Plastic<br />

piping systems <strong>for</strong> renovation <strong>of</strong> underground sewerage networks (CIPP).<br />

Design Life Range 50-75 years<br />

Installation Standards None at this time.<br />

Installation<br />

The host pipe is first cleaned and then CCTV inspected <strong>for</strong> location <strong>of</strong> laterals and<br />

Methodology fittings. The liner can be installed through a bend <strong>of</strong> up to 45 degrees. A pig is<br />

A-66

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!