<strong>Technology</strong>/Method Hose Liner/Pulled in Place<br />

Pressure Capacity, 493 psi <strong>for</strong> 6 inches (150 mm), 218 psi <strong>for</strong> 20 inches (500 mm) <strong>for</strong> single layer <strong>of</strong><br />

psi<br />

woven fabric; higher with double layer <strong>of</strong> woven fabric<br />

Temperature Range,<br />

o<br />

F<br />

60 o C<br />

Renewal Length, feet Up to 6,000 feet (3,000 feet more common)<br />

Other Notes Certified <strong>for</strong> drinking water in Germany, but not in North America.<br />

III. <strong>Technology</strong> Design, Installation, and QA/QC In<strong>for</strong>mation<br />

Product Standards KTW and W270 <strong>for</strong> drinking water in Europe, Deutsche Vereiniging des Gas und<br />

Wasserfaches (DVGW) Testing Basis VP 643, June 2004<br />

Design Standards None. Raedlinger’s rated pressure <strong>of</strong> the Primus Liner provides a short-term factor<br />

<strong>of</strong> safety <strong>of</strong> 2.5 against the burst pressure. Raedlinger’s literature states that longterm<br />

creep pressure tests are conducted, in accordance to DIN 16887 and ISO<br />

9080, with a safety coefficient <strong>of</strong> 2.0 applied to the extrapolated 50 year strength.<br />

Design Life Range Minimum service life <strong>of</strong> 50 years<br />

Installation Standards None<br />

Installation<br />

The existing pipe is first CCTV inspected. The inspection device is fitted with<br />

Methodology tools suitable <strong>for</strong> grinding <strong>of</strong>f sharp edges at pipe transitions or welded seams.<br />

The pipe is then cleaned using a mechanical pig. Sharp edges can damage the<br />

outer PE coating so a special fitting is needed to guide the liner into the host pipe.<br />

The Primus Line is pulled from a reel into the pipeline that has been prepared. A<br />

special pulling head is fitted to the end <strong>of</strong> the Primus Line <strong>for</strong> attaching the cable<br />

<strong>for</strong> pulling. Rate <strong>of</strong> installation <strong>of</strong> up to 1200 feet per hour possible. The<br />

maximum pulling <strong>for</strong>ce is 100 kN. A load cell with recorder is required to<br />

monitor and document the pulling <strong>for</strong>ce. With the Primus Line in final position,<br />

special connectors are fitted on the ends and after curing <strong>of</strong> the injected resin<br />

(Scotchcast Cable Resin No. 1471), the connector is used to join the Primus<br />

Line via a welded or flanged connection to the original pipe or an adapter.<br />

QA/QC The host pipe is CCTV inspected <strong>for</strong> anomalies. The inspection device is fitted<br />

with a grinding tool <strong>for</strong> removal <strong>of</strong> any sharp edges which could damage the<br />

Primus Liner during insertion or operation. After the liner has been completely<br />

installed and connecters fitted to the end, the line is hydrostatically pressure tested<br />

to ensure leak tightness. Raedlinger recommends a test pressure <strong>of</strong> 1.1 times<br />

working pressure, or a minimum <strong>of</strong> 30 psi (2 bar) over working pressure.<br />

IV. Operation and <strong>Main</strong>tenance Requirements<br />

O&M Needs None identified.<br />

Repair Requirements Raedlinger did not state what procedures need to be followed to repair a section<br />

<strong>for</strong> Rehabilitated that has been lined with Primus Line. It would appear that a damaged section<br />

Sections<br />

would have to be removed and two new special couplings used to install a<br />

replacement section.<br />

V. Costs<br />

Key Cost Factors • Time and cost savings<br />

• Only coarse cleaning <strong>of</strong> the old pipe is necessary; no bonding <strong>of</strong> the Primus<br />

Liner is required<br />

• Fast installation process and fast restart <strong>of</strong> pipeline operation<br />

• Savings through minimum construction costs<br />

• Reduction <strong>of</strong> excavation work to a minimum; minimal disruption <strong>of</strong> public<br />

life, no destruction <strong>of</strong> vegetation, no disturbance <strong>of</strong> road, rail and shipping<br />

traffic<br />

Case Study Costs The cost <strong>for</strong> the installation was reported to be about a 70% cost savings versus<br />

conventional replacement construction.<br />

VI. Data Sources<br />

References Primus Line brochure “Innovative High-Pressure Pipelines <strong>for</strong> Trenchless Pipe<br />

Renewal”; Reference data sheets (8 selected projects)<br />

Pressure Rates; Scope <strong>of</strong> delivery; Installation manual (December 2008);<br />

Installation manual connectors<br />

A-65