<strong>Technology</strong>/Method CIPP with Carbon Fiber/Manually Applied<br />

I. <strong>Technology</strong> Background<br />

Status Conventional<br />

Date <strong>of</strong> Introduction US Patent 5931198 - Introduced in 1988 in the US market<br />

Utilization Rates Not available<br />

Vendor Name(s) FibrWrap<br />

The FibrWrap Company<br />

Fyfe Co. LLC<br />

Nancy Ridge <strong>Technology</strong> Center<br />

6310 Nancy Ridge Drive, Suite 103<br />

San Diego, CA 92121-3209<br />

Phone: 858-642-0694, 858-642-0947<br />

Email: info@fyfeco.com<br />

Web: http://www.fyfeco.com<br />

Practitioner(s) Gary Schult<br />

Project Sponsor<br />

Kiewit Western Company<br />

For 60 inches through 96 inches PCCP pipes<br />

Phone: 602-437-7841<br />

Description <strong>of</strong> <strong>Main</strong><br />

Features<br />

<strong>Main</strong> Benefits<br />

Claimed<br />

<strong>Main</strong> Limitations<br />

Cited<br />

Applicability<br />

(Underline those that<br />

apply)<br />

John Galleher<br />

Senior Engineer<br />

San Diego County Water Authority<br />

For Pipeline 5: 2 sections <strong>of</strong> 24 feet <strong>for</strong> 96 inches pipe<br />

610 W 5th Avenue<br />

Escondido, CA 92025<br />

Phone: 760-488-1991<br />

Cell: 760-233-3206<br />

Don Lieu and Robert Diaz<br />

Chief and Engineering Project Manager<br />

Utility Design Division<br />

Department <strong>of</strong> Public Works<br />

Bureau <strong>of</strong> Engineering<br />

Howard County, MD<br />

Cell <strong>for</strong> Mr. Lieu: 410-313-6121<br />

Cell <strong>for</strong> Mr. Diaz: 410-313-6125<br />

The Tyfo® Fibrwrap® Pipe <strong>Rehabilitation</strong> System is a Fiber-Rein<strong>for</strong>ced Polymer<br />

(FRP) method, utilizing carbon fiber, <strong>for</strong> the repair, strengthening and retr<strong>of</strong>it <strong>of</strong><br />

corrosion-damaged and distressed large diameter PCCP, RCCP, and steel pressure<br />

pipelines used in municipal, industrial and other applications. It’s main use has<br />

been <strong>for</strong> PCCP water and <strong>for</strong>ce mains that have broken prestressed wires.<br />

• Restoration <strong>of</strong> pipelines structural integrity to original load bearing<br />

capability (pressure and external)<br />

• Can be designed to increase pipeline strength over and above original design<br />

• Non-metallic material ensures that corrosion-related damages do not recur in<br />

rehabilitated pipe segments<br />

• NSF 61 certified system <strong>for</strong> potable water<br />

• Thin liner minimizes any loss <strong>of</strong> flow capacity<br />

• Limited to sectional repairs as cost can be high<br />

• Requires highly trained and experienced technicians to work in confined<br />

space with volatile chemicals<br />

• Surface preparation <strong>for</strong> good bond extremely important<br />

• Joint termination is an evolving technology<br />

• No standardized design approach<br />

<strong>Force</strong> <strong>Main</strong> Gravity Sewer Laterals Manholes Appurtenances<br />

Water <strong>Main</strong> Service Lines Other: Tunnel<br />

A-53