<strong>Technology</strong>/Method CIPP/Glass Rein<strong>for</strong>cement<br />

3. Following installation, hot water or steam is used to cure the thermosetting<br />

resin.<br />

4. The pipe is cooled, the ends are cut and the pipe is returned to service. Lined<br />

sections are re-established to the existing system using standard pipe fittings.<br />

QA/QC Inspection <strong>of</strong> main prior to installation.<br />

Followed by post-installation inspection, pressure testing (at twice the operating<br />

pressure).<br />

IV. Operation and <strong>Main</strong>tenance Requirements<br />

O&M Needs Disinfection <strong>of</strong> system be<strong>for</strong>e pressing it in to service.<br />

Repair Requirements<br />

<strong>for</strong> Rehabilitated<br />

Sections<br />

Excavate, remove the damaged portion <strong>of</strong> the pipe, install end couplers and bridge<br />

the previously damaged location with new pipe and couplers.<br />

V. Costs<br />

Key Cost Factors Not available<br />

Case Study Costs Not available<br />

References<br />

VI. Data Sources<br />

http://www.insitu<strong>for</strong>m.com/mm/files/Insitu<strong>Main</strong>%20Brochure.pdf<br />

A-52

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!