09.01.2013 Views

State of Technology Report for Force Main Rehabilitation, Final ...

State of Technology Report for Force Main Rehabilitation, Final ...

State of Technology Report for Force Main Rehabilitation, Final ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Technology</strong>/Method CIPP/Pull in Place/UV Cured<br />

• measurement <strong>of</strong> initial ring stiffness<br />

• 3-point bending test (flexural modulus and strength)<br />

• barcol hardness<br />

• residual styrene content<br />

During installation, the more important QC requirements are:<br />

• installation pressure diagram<br />

• curing speed diagram<br />

• number <strong>of</strong> UV-light used<br />

• temperature diagram<br />

After installation, the more important QC requirements are:<br />

• impermeability test<br />

• wall thickness<br />

• measurement <strong>of</strong> the initial ring stiffness<br />

• 3-point bending test<br />

• measurement <strong>of</strong> the resin content (loss on ignition)<br />

• Residual styrene content<br />

• CCTV <strong>of</strong> liner <strong>for</strong> visual defects<br />

IV. Operation and <strong>Main</strong>tenance Requirements<br />

O&M Needs None<br />

Repair Requirements Use standard methods <strong>for</strong> GRP-polyester pipes/products<br />

<strong>for</strong> Rehabilitated<br />

Sections<br />

V. Costs<br />

Key Cost Factors Totally trenchless method, no pits needed up to installation <strong>of</strong> 36 inches<br />

(depending on manhole cover size). Costs mainly driven by wall thickness<br />

(according to static needs) and diameter <strong>of</strong> pipe. By-pass pumping time and cost<br />

is limited due to fast installation procedure. Mobilization and site setup reduced<br />

because <strong>of</strong> small footprint, liner is shipped to site ready <strong>for</strong> use, and customized<br />

equipment, opening <strong>of</strong> lateral completely possible directly after installation.<br />

Case Study Costs No project costs available from BKP.<br />

VI. Data Sources<br />

References www.bkp-berolina.de, BKP-Berolina brochure (no date), IKT Liner <strong>Report</strong> 2007<br />

A-48

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!