09.01.2013 Views

State of Technology Report for Force Main Rehabilitation, Final ...

State of Technology Report for Force Main Rehabilitation, Final ...

State of Technology Report for Force Main Rehabilitation, Final ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Technology</strong>/Method Close - Fit Lining/Expandable PVC<br />

Installation Standards Not Available<br />

Installation<br />

Methodology<br />

• Minimal excavations are per<strong>for</strong>med.<br />

• Duraliner is fused to length <strong>for</strong> the project.<br />

• Duraliner TM is expanded tightly against the interior walls <strong>of</strong> the host pipe.<br />

• Exposed ends <strong>of</strong> the Duraliner are expanded to standard fitting sizes.<br />

• The new Duraliner is cut to length and reconnected to system.<br />

• Fused Duraliner is inserted into cleaned, inspected host pipe.<br />

QA/QC Not available<br />

IV. Operation and <strong>Main</strong>tenance Requirements<br />

O&M Needs As Duraliner is expanded molecular reorientation increases its hydrostatic<br />

design basis. This works toward <strong>of</strong>fsetting the DR increase from expansion in<br />

Repair Requirements<br />

<strong>for</strong> Rehabilitated<br />

Sections<br />

the pressure rating.<br />

Not available<br />

V. Costs<br />

Key Cost Factors Not available<br />

Case Study Costs Not available<br />

References<br />

VI. Data Sources<br />

Website <strong>for</strong> Underground Solutions Inc.<br />

A-31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!