<strong>Technology</strong>/Method Rolldown/Close Fit PE Liner – Symmetrical Reduction<br />

I. <strong>Technology</strong> Background<br />

Status Emerging<br />

Date <strong>of</strong> Introduction Not available.<br />

Utilization Rates Not available.<br />

Vendor Name(s) Rolldown<br />

Subterra<br />

Daniels Contractors Ltd<br />

Lyncastle Way<br />

Appleton Thorn<br />

Warrington WA4 4ST<br />

UK<br />

Phone: +44 (0)1925 860666<br />

Email: info@subterra.co.uk<br />

Web: www.subterra.co.uk<br />

Practitioner(s) Not available.<br />

Description <strong>of</strong> <strong>Main</strong><br />

Features<br />

Rolldown is a close fit polyethylene lining. Standard grade (PE80) PE is pushed<br />

through a series <strong>of</strong> concentric rollers reducing the diameter to facilitate placement<br />

inside a deteriorated host pipe. After insertion, the liner is pressurized with water<br />

at ambient temperature to revert to its original size.<br />

<strong>Main</strong> Benefits Claimed • Negotiate bends up to 11.25 o<br />

• Designed to be fully structural (full pressure) or just a thin wall liner that<br />

bridges over holes and gaps<br />

• PE holds its reduced diameter indefinitely prior to reversion, allows<br />

stop/start internal corrosion<br />

• Minimal loss <strong>of</strong> cross-sectional area and there<strong>for</strong>e capacity<br />

<strong>Main</strong> Limitations Cited • Custom extruded PE with OD to match host pipe ID<br />

Applicability<br />

(Underline those that<br />

apply)<br />

<strong>Force</strong> <strong>Main</strong> Gravity Sewer Laterals Manholes Appurtenances Water<br />

<strong>Main</strong> Service Lines Other: Gas transmission and distribution<br />

II. <strong>Technology</strong> Parameters<br />

Service Application Water Supply and Distribution, Sewer Pumping <strong>Main</strong>s<br />

Service Connections Reinstate via excavation<br />

Structural Rating Claimed Fully structural (IV) or Semi-Structural (II)<br />

Materials <strong>of</strong> Composition PE 80<br />

Diameter Range, inches 4-20 inches (100-500mm)<br />

Thickness Range, inches Not available.<br />

Pressure Capacity, psi 232 psi (16 bar)<br />

Temperature Range, o F 73 o F (pressure derating required at higher temperatures)<br />

Renewal Length, feet 5,000 feet (1,500 meters) in one insertion<br />

Other Notes Not available.<br />

III. <strong>Technology</strong> Design, Installation, and QA/QC In<strong>for</strong>mation<br />

Product Standards NSF 61 Certified (<strong>for</strong> potable water applications)<br />

Design Standards Not available.<br />

Design Life Range 50 years<br />

Installation Standards Not available.<br />

Installation Methodology PE pipe is custom extruded with OD matching ID <strong>of</strong> host pipe. The host pipe is<br />

cleaned, removing any internal corrosion or deposits. The integrity <strong>of</strong> the host<br />

pipe should be checked via CCTV. At site, the string <strong>of</strong> PE pipe is butt-fused<br />

together and then pushed through a series <strong>of</strong> concentric rollers, which reduces the<br />

diameter <strong>of</strong> the liner pipe allowing it to be pulled through the host pipe. Insertion<br />

lengths <strong>of</strong> up to 5,000 feet are possible. The reduced diameter PE pipe maintains<br />

its diameter until subjected to internal water pressure. The internal pressure<br />

reverts the pipe back to its original diameter and in close contact with the host<br />

pipe. The string <strong>of</strong> PE pipes can be pulled through a bend <strong>of</strong> up to 11.25 o .<br />

Standard couplings are then attached to the end <strong>of</strong> the exposed pipe sections and<br />

make-up pieces are inserted to reconnect the pipe to the existing main.<br />